‑5‑
5.PREPARATION
5‑1. Preparation of the zero plate
Prepare the substrate which is the same kind, thickness and shape with an
object to be measured.
The attached zero plate for checking the Meter, SUS 430 Ferrite stainless
steel, is used for the operation check of the Meter.
Prepare the substrate of an actual object to be measured.
・Same kind The same kind of material as the substrate of an object to be measured
・Same thickness Nearly the same thickness as the substrate of an object to be measured
・Same shape The same shape in pipe diameter, curvature, geometrical shape, etc. as the
substrate of an object to be measured
・Size Substrate with an enough area on which the probe can be easily operated
・Surface condition Untreated (unoxidized etc.) substrate having smooth surface Remove rust,
dirt or dust, if any.
5‑2.Connecting(Disconnecting) the probe
Carry out the connection (disconnection) of the probe by the following procedures.
・Be sure to keep the Power OFF.
・The probe cannot be substituted with other probe.
UsetheprobewhichisthesamenumberwiththeMeternumber.
◎ Connecting method
Insert the probe into the probe
connector keeping the wide cut right
ward and tighten it by turning
Aclockwise.
◎ Disconnecting method
Release by turning A counter-clockwise
and calmly pull the probe out of
the connector.
Don't pull the cord as it
causes breaking of cord.
※When the probe is not connected to the Meter or any system is out of order even if the probe
is connected, the indication changes as follows after turning ON the power key.
If the probe is disconnected in power ON condition, 「PE」is indicated on the display and power
is automatically cut off. (「PE」is abbreviation of Probe Error. )
↓
→
The buzzer emits a beeping sound. Power is automatically cut off.
−−− μm
Fe
PE
Fe Fe