Metreg MTM Series User manual

livinggas.
Metreg Technologies GmbH
MTM Turbine
Gas Meters
Manual
living
gas.
livinggas.living

www.metreg-technologies.de
MTM_Manual_EN_16.01.2015
©2014MetregTechnologiesGmbH•Design:www.reidelsoltaugrakdesign.de
All rights reserved. Subject to technical changes.

5
MTM Turbine
Gas Meters
Manual

www.metreg-technologies.de
Table of Content
Manual MTM Turbine Gas Meters
1. Purpose of this Manual ................................................................................................ 5
2. Basic safety instructions ............................................................................................... 5
3. Declaration................................................................................................................. 6
4. Use and Scope ............................................................................................................ 6
5. DesignoftheMTMTurbineGasMeter........................................................................... 6
6. TechnicalData......................................................................................................... 7- 8
7. Installation ................................................................................................................. 8
8. MountingPosition/DirectionofFlow........................................................................... 9
9. Preliminarywork.................................................................................................. 10-11
10. Lubrication and Maintenance of the MTM Turbine Gas Meter ........................................ 12
11. Maintenance of the MTM Turbine Gas Meter ............................................................... 13
12. Commissioning of the MTM Turbine Gas Meter ............................................................ 13
13. DecommissioningoftheMTMTurbineGasMeter........................................................ 13
14. Pulse Generators .................................................................................................. 14-15
15. Pressure Measuring Point ........................................................................................... 16
16. Temperature Measuring Point ................................................................................... 16
17. Cleaning ................................................................................................................... 17
18. Transport and Storage ............................................................................................... 17
19. Annex A ................................................................................................................... 18
20. Annex B .................................................................................................................... 19

5
1. Purpose of this Manual
The instruction manual is dedicated to technical sta with adequate training and technical
knowledgeinthesectorofgasdistributionindustryaccordingtotheapplicabletechnical
lawsandrequirements.ForexamplestawhoareeducatedaccordingDVGWcodesof
practices G 492 and / or G495.
2. Basic safety instructions
Requirements for the personnel
Theoperationalstamustbequalied,instructedandauthorizedaccordingtheassigned
functions.Allserviceandmaintenanceworkshallbeperformedexclusivelybypersonswith
provenexpertknowledge,includingknowledgeofoccupationalsafetyandenvironmental
protection.
Protectiveactionshavetobedenedaccordingthelegalregulations.
Designated use
TheturbinemeterMTMisdesignedforscalorin-plantvolumemeasurementofcombustible
gasesofthe1.,2.and3.gasfamily(naturalgas,towngas,propane,butaneandothers),
puriedanddriedbiogasaswellasotherinert,non-aggressivegasesandnon-explosive
gases and gas mixtures. The permissible operating pressure range reaches up to 100 bar
dependentonthedesignofthemeter,thetemperaturerangerunsfromatleast+5°C
to+55°C.
The manufacturer is not liable for damage caused by improper or not-designated use.
Safety at work
Weartherequiredpersonalprotectiveequipmentaccordingtofederal/nationalregulations.
Operational safety
The device is permitted to operate in technical faultless and fail-safe condition only.
Responsible is the operator.
Product safety
Thismeasuringdeviceisdesigned,manufacturedandtestedaccordingthestate-of-art
demands. It meets all legal requirements and complies with the EC directives.
Themanufacturerconrmsthedevice-specicECDeclarationofConformitybyxing
theCEmarktothedevice.
The device has left the factory in perfect condition.
Warrantycouldbeextendedonlyincaseofproperinstallationandoperationaccording
to this manual.

6
3. Declaration
Declaration of Conformity(AnnexA)
4. Use and Scope
TheturbinemeterMTMisdesignedforscalorin-plantmeteringofnaturalgasandapproved
according the European requirements of EN12261. The MTM turbine meter is suitable to be
installedinhazardousareaofCategory2(Zone1)II2GcIICT4X.
TheMTMturbinemeterissuitableforthefollowinggases:
• Naturalgas,towngas,propane,butane,ethylene,air,nitrogen,noblegases
• Hydrogen(withreducedmeasuringrange)
• conditionedbiogasacc.DVGWG260forcombustiblegases
• Furthergasesonrequest.
TheMTMturbinemetercannotbeusedfor:Oxygen,Acetyleneandotheraggressivegasesas
well as for explosive gases or gas mixtures. The meter should not be used in applications with
the presence of strong pulsations. These conditions will result in an increased error and may
signicantlydecreasethemeter’slifetime.
5. Design of the MTM Turbine Gas Meter
Fig. 1: Sectional view of MTM turbine gas meter
Note: In case of failure or damage: Repairs are only allowed to be done
by authorized repair centers.
1Meter housing
2Turbine rotor
3LF-andanti-tamperingcontact
4Meter index head
5Flowconditioner
6Measuring unit
7Lubrication(oil)pump
1
2
3
4
5
6
7

7
6. Technical Data
Meter type MTM turbine meter
Approval: MIDaccordingDINEN12261:2002
“Gas meters – Turbine gas meters”;
OIMLR137-1&2:2012„Gasmeters“
Size: G 65 to G 4000
Nominal diameter: DN50(3“)toDN300(12“)
Pressure rating: PN 10 up to PN 100 and ANSI CLASS 150 up to ANSI CLASS 600
Rangeability: 20:1orhigherdependingontheoperationpressure
Temperature ranges:
• gastemperature +5°Cto+55°C
• ambienttemperature +5°Cto+55°C
• storagetemperature -25°Cto+55°C
Housing material: Aluminum,CarbonSteel
Max. operation pressure: 100bar(g
Accuracy: Qmin ≤ Q < Qt:±2.0%
Qt≤ Q ≤ Qmax:±1.0%
Rangeability Qt
1:10,1:20 0,20Qmax
1:30 0,15Qmax
1:50 0,15Qmax
Meter index
Numberofindexes: 1
Numberofdigitrollersperindex: 8
Meterindexhead: Composite(optional:Aluminum)
Protectionclass: IP 65
Pulse generators
LF pulse generator: 1LF(reedcontact),add.1LFasoption
Contacttype: makecontact(normallyopen)
Max.contactload: 10W
Max.switchingvoltage: 50VDC/200VDC
Max.switchingcurrent: 0.1A/0.5A
Resistance: 100Ωinseriestoreedcontact
fmax: 500Hz
HF-pulse generator: 1HF(inductivesensor,acc.NAMURspecs)
Supplyvoltage: 8.2VDC(internalresistanceof1kΩ)
Currentconsumption(sensorcovered): <1mA
Currentconsumption(sensorfree): >2.1mA
Max. switching frequency fmax: 1500Hz
Anti tampering contact: 1 Reed contact
Contacttype: Normallyclosed
Max.contactload: 10W
Max.switchingvoltage: 175VDC
Max.switchingcurrent: 0.25A
Resistance: 100Ωinseriestoreedcontact

Rangeability and pulse weighting data
*)Theabsolutenumberofthepulsesdependsonthemetersizeandtheindividualmeteritself.
Thestatedvaluesareoftypicalsize.Exactvaluesdeterminedbycalibrationofthemeterare
located on the nameplate.
7. Installation
Recommendations and requirements for the installation of the MTM turbine meter:
•StraightInletpipe≥2DNandoutletpipe≥1DNisrequiredforscalmetering
in case of low level perturbations. In case of high level perturbations a straight
inletpipe≥4DNisrequired.
•Avoid heavy vibrations and pulsations in the point of measurement.
Installationofasuitablecompensatorcaneectivelydampdownthiskindofdisturbance.
•Drasticchangesinthegasowaswellasstronglypulsatingowwillincreasethe
measuring error. They arise for example during frequently switching on-o of solenoid
valves. The pressure impulses by opening the valve very fast may damage the ball bearings
of the turbine rotor and cause failure of the turbine meter.
•Filter(smallmeshsize)shouldbeinstalledupstreamofthemetertoprotectitfromany
contamination(suspendedparticles>50µm)duringstart-upandoperation.
DN G-type Qmin Qmax HF*)NF
[mm] [m3/h] [m3/h] [imp/m3] [imp/m3]
50 65 10 100 105000 10
80 100 8 160 26000 1
80 160 13 250 26000 1
80 250 20 400 26000 1
100 160 13 250 13500 1
100 250 20 400 13500 1
100 400 32 650 13500 1
150 400 32 650 5000 1
150 650 50 1000 5000 1
150 1000 80 1600 5000 1
200 650 50 1000 2200 1
200 1000 80 1600 2200 1
200 1600 130 2500 2200 1
250 1000 80 1600 1900 0,1
250 1600 130 2500 1900 0,1
250 2500 200 4000 1900 0,1
300 1600 130 2500 1200 0,1
300 2500 200 4000 1200 0,1
300 4000 320 6500 1200 0,1
8

•The gas should be dry. If condensate may be occur then the installation of a condensation
trapupstreamofthemeterisrecommended(insomeltertypesitisintegrated).
In this case choose
o Flowdirectionfromtoptobottom
o DoNotinstallthemeteratthelowestpointofthepiping
Attention: The MTM turbine meter is not suitable for oxygen and other highly corrosive gases
as well as for explosive gases and gas mixtures.
8. Mounting Position / Direction of Flow
There are two positions of installation possible for the turbine gas meter:
Horizontal installation or vertical installation
Figure 2: Typical horizontal installation of the MTM turbine gas meter (recommended)
Figure 3: Typical vertical installation of the MTM turbine gas meter (only DN ≤ 150)
Notice: Preferably, the meter should be installed horizontally, with index head upward.
Ensure that the gas ow is in the same direction as shown by the arrow at the meter housing.
9
Isolation valve
Isolation valve
Isolation
valve
Filter
MTM
Ventil
Isolation valve
Isolation
valve
Filter
MTM
Isolation valve

DN Pressure Flanges according DIN EN 1092-1
[mm] Class PN Hexagon screws and nuts
Min. operating Strength class Strength class
temperature screws nuts
of the screws
and nuts
25 40 -10°C 5.6/8.8 5/8
50 40 -10°C 5.6/8.8 5/8
80 40 -10°C 5.6/8.8 5/8
100 40 -10°C 5.6/8.8 5/8
150 40 -10°C 5.6/8.8 5/8
200 40 -10°C 5.6/8.8 5/8
250 40 -10°C 5.6/8.8 5/8
300 40 -10°C 5.6/8.8 5/8
10
9. Preliminary work
Before the installation of the meter make sure that the following steps has been observed:
1. Remove the plastic cover sheets at the inlet and outlet of the meter.
2.Inspectthemeterforcompleteness(e.g.plugs,providedoilvolume)
and for absence of any transport damages.
3. Cleantheangesurfaces(e.g.withpetroleum).
4. Checkbyblowingintothemeterthatturbinerotorrotateseasilyandstopssmoothly.
5. Priortothemeter’sinstallationcheckthatnocontaminations,condensate,dirtanddebris
are in the pipe. Especially the cleaning of elbows in vertical installations is important to
preventdamageofthemeterbycontaminations,dirtanddebrispassing.Acone-shaped
start-upsievemaybeinstalledforinitialoperation.After4-6weeksitshouldberemovedto
avoidperturbationsoftheowprolewithresultingdecreaseoftheaccuracy.
6. Makesurethatthereisnointrusionofthesealingelementintothepipeduringinstallation
andoperation(concentricmounting).
7. Checkthatinadditiontothemeter-lengththereisenoughinstallationspacefor
thetwosealsbetweeninletandoutletanges.
8. The meter must be installed stress-free. Therefore in addition to point 7 observe strictly the
properalignmentoftheturbinemeter’sinlettooutletaxiswiththeconnectingpipingaxis.
Necessary equipment for the meter installation:
1. Suitableandcerticatedgaskets:
•
DimensionsaccordingDINEN1514-1orDIN2690
2.ScrewsaccordingDINISO4014andASMEB1.1
3.NutsaccordingDINENISO4032andASMEB1.1