TechnipFMC Smith Meter PRIME 4 User manual

Smith Meter® PRIME 4
Installation and Operation Manual
Bulletin MN01038 Issue/Rev. 1.0 (11/20)
November 2020

PRIME 4 Installation and Operation Manual
ii
Important
All information and technical specifications in this document have been carefully checked and compiled
by the author; however, we cannot completely exclude the possibility of errors. TechnipFMC is always
grateful to be informed of any errors; contact us on TechnipFMC.com.
Caution
Read instructions carefully before attempting to operate. Claims for damage caused by air, line
contamination, or pressure shock waves during start-up will not be accepted by TechnipFMC
Measurement and Production Solutions Inc.
Technical Support
Field Service Response Center
24/7 Technical Support/Schedule a Technician: +1 844.798.3819
System installation supervision, startup, and commissioning services are available.
Customer Support
Customer Service
TechnipFMC
Measurement and Production Solutions
1602 Wagner Avenue
Erie, PA 16510 USA
+1 814.898.5000
MS.ResponseCenter@TechnipFMC.com
TechnipFMC.com
Literature Library
http://info.smithmeter.com/literature/

PRIME 4 Installation and Operation Manual
Contents iii
Contents
1 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1 Principle of Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.1 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 Preparing the Meter for Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.3 ATEX- and IECEx-Approved Installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.4 UL Brazil-Approved Installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.5 Wire Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.5.1 Quadrature (Two Channel) Installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3 Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.1 Start-Up Procedure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.2 General Operating Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
4 Referenced Publications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

PRIME 4 Installation and Operation Manual
Overview 1
1 Overview
The Smith Meter PRIME 4 meter is a rotary positive-displacement meter that measures product flow in
two directions. The accurately machined housing contains a rotor which revolves on tungsten carbide
bearings and carries two evenly spaced Polyketone blades. As liquid flows through the meter, the rotor and
blades revolve about a fixed cam, causing the blades to reciprocate. The successive movement of the
blades forms a measuring chamber of precise volume between the two blades, the rotor, the housing, the
bottom, and the top covers. A continuous series of these closed chambers is produced as the rotor
revolves. Neither the blades nor the rotor contact the stationary walls of the measuring chamber.
1.1 Principle of Operation
One of the outstanding features of the PRIME 4 meter is that product flow is undisturbed while it is being
metered. Energy is not wasted by unnecessary hydraulic bending of the liquid.
Unmeasured liquid (represented by the dark area in the drawing below) is shown entering the meter,
causing the meter’s rotor and blades to turn counter-clockwise. Blades A and B are fully extended, forming
the measuring chamber; the opposite ends of blades are retracted and flush with the rotor.
In the drawing below, the rotor and blades have made a one-eighth revolution. Blade A is fully extended;
blade B is partially drawn back; and the opposite end of blade B is starting to extend.

PRIME 4 Installation and Operation Manual
Overview 2
In the example below, a quarter revolution has been made. Blade A is still extended and blade B is now
fully extended. An exact known volume of new liquid is now in the measuring chamber.
One-eighth of a revolution later, the measured liquid moves out of the meter. Blade A retracts on the outlet
side and starts to extend on the inlet side to form another measuring chamber. A second measuring
chamber forms between blades B and A as the rotor rotates around the cam.
In one-half revolution, two measuring chambers have formed and the third is forming. This cycle is
repeated as long as liquid flows.
The rotation of the rotor is converted into electronic pulses by means of an exciter gear—an integral part of
the rotor—and a pulse pick-up located in a well on the side of the meter cover. The meter produces
approximately 50 pulses per gallon (13 pulses per liter).

PRIME 4 Installation and Operation Manual
Installation 3
2 Installation
2.1 Overview
The PRIME 4 meter is a precision instrument and should be treated accordingly. Prior to installation, it
should be protected from adverse weather conditions and accidental abuse. Adequate pipe support must
be provided close to the meter because the meter is supported by the flanges. Piping must not produce an
undue strain on the meter. Dimensional outline drawings of the meter are available. See specifications
document SS01096 for dimensional outline drawings of the meter.
2.2 Preparing the Meter for Installation
Complete the following steps to prepare the PRIME 4 meter for installation:
• Flush the meter with a light lubricating oil if it has been left idle or stored.
• Use a carpenter's level on a flat surface of the meter housing to ensure the rotor is level (for example,
on the cover around the bolt circle or on the nameplate pad). This is important because the meter rotor
must not gravitate to one side.
• Ensure the drain plug is accessible, but the meter cannot be accidentally drained of product.
• Use a relief valve to protect the meter and system against the effects of thermal expansion.
• Install a deaerator or air eliminator, when necessary, to keep air and vapor out of the meter.
• Clean all piping internally before the meter is put into operation.
• Completely remove any rust, dirt, welding shot, and other foreign material from the meter.
• Remove the meter and install a spool piece if the system will be pressure-tested with water or if debris
will be flushed from the system.
• Protect the meter with at least a 40-mesh strainer, when necessary.
• Install a flow-limiting valve, when necessary, downstream of the meter to protect it from excessive flow
rates.
• Do not calibrate the meter with water or allow water to stand in the meter.
2.3 ATEX- and IECEx-Approved Installations
Standards used:
• IEC 60079-0 7th Edition, EN 60079-0:2018
WARNING: Thermal expansion of liquid in this equipment can cause high-pressure damage. A ther-
mal pressure relief valve may be necessary in the system.

PRIME 4 Installation and Operation Manual
Installation 4
• IEC 60079-1 7th Edition, EN 60079-1:2014
All cable entries, stopping boxes, or plugs should be certified according to the requirements in EN 60079-1
with 3/4-inch 14 NPT threaded entry. Wiring conductors and cable glands, if used, must have a tempera-
ture rating of at least 70 ºC.
For wiring systems using cable glands, the gland or thread adapter must be installed in accordance with
EN/IEC 60079-1 Section 13. The cable end must be securely installed and, depending on the cable type,
be properly protected from mechanical damage. Select wiring and cable glands suitable for 70 ºC ambient
operation.
For wiring systems using conduit, an Ex d certified sealing device must be used immediately at the
entrance of the J-Box enclosure. It is an end-user requirement to ensure that any unused entries must be
suitably blocked with an Ex d IIC IP with Ingress protection matching the name plate markings.
Equipotential bonding or earthing must be safeguarded by the way the sensor is connected with the
complete system.
Electrical Ratings: 28 VDC, 50 mA max.
2.4 UL Brazil-Approved Installations
Installed or connected components (e.g., terminal compartments, bushes, plugs, cable glands, connec-
tors) must have construction features that meet technical specifications for the CoC. They must be suitable
for the operating conditions and be separately certified. The special conditions specified for the compo-
nents must be met. This applies also to components shown and mentioned in the technical description.
The terminal compartment can be connected to suitable conduit systems that comply with the NBR IEC
60079-1 requirements and for which a separate certificate has been issued.
Openings in the enclosure that are not used must be closed/sealed in accordance with ABNT NBR IEC
60079-1 (for example, with the use of separately certified plugs).
Repairs to the sensor housing may only be made by the manufacturer or Ex d certified repair shops for
the 3/4-inch 14 NPT or 1/16-inch 27 NPT flame-proof joints.
Repairs on the basis of the values in Tables 2 and 3 of EN/IEC 60079-1 are not permitted.
Table 1: ATEX- and IECEx-Approved Installations
Marking Equipment Covered Certificate
Ex db IIB T5...T6 Gb
IP65 or IP66
-50 °C ≤ Ta to ≤ +70 °C
Tprocess = -20 °C to 93 °C
T5 ≤ 93 °C / T6 ≤ 80 °C
Type SG Sensor DEMKO 19 ATEX 2266X
IECEx TUN 15.0029X
Repairs to explosion-proof joints may only be carried out in accordance with the manufacturer's design
specifications. Repair based on the values in tables 2 and 3 of ABNT NBR IEC 60079-1 is not allowed.
Repairs should only be done by the manufacturer or an Ex certified repair shop

PRIME 4 Installation and Operation Manual
Installation 5
For wiring systems using cable glands, the cable ends must be installed securely and, depending on the
type of cable, they must be adequately protected against mechanical damage.
This requirement may be ignored when a cable gland and connecting cable are used in such a way that
there is no risk of mechanical damage to the installation.
The connection cable must be of a quality that meets the thermal requirements under field service
conditions.
The equipotential/ground connection must be ensured with the installation of the sensor connected to the
complete electrical system of the installation.
Electrical ratings: 28V DC, 50 mA Max.
2.5 Wire Connections
2.5.1 Quadrature (Two Channel) Installations
For quadrature (two channel) meter installations with reverse flow direction, refer to the following wiring
diagram and reverse white and yellow wire connections. Yellow wire becomes the "A" signal and white wire
becomes the "B" signal.
To avoid igniting an explosive atmosphere, do not open the enclosure unless you are sure it is not a
hazardous area. To prevent ignition of an explosive atmosphere and to avoid electric shock, disconnect
the power circuits before opening the enclosure. While the electrical circuits are energized, during oper-
ation, keep the enclosure properly closed.
Table 2: UL Brazil-Approved Installations
Marking Equipment Covered Certificate
Ex db IIC T5 …T6 Tamb = - 50 °C ≤ Tamb ≤ + 70 °C
IP65 or IP66
Tprocess = -20 °C to +93 °C
T5 ≤ 93 °C / T6 ≤ 80 °C
Type SG Sensor UL-BR 19.1164X

PRIME 4 Installation and Operation Manual
Operation 6
3 Operation
3.1 Start-Up Procedure
When the PRIME 4 meter is first installed in the line, air is in both the line and inside the meter’s rotor. The
air takes some time to work out. If the meter is subjected to hydraulic shock during this vulnerable time, the
rotor can pinch down on the blades and cause blade breakage or cam shaft rotation. By following the
procedure outlined below, the likelihood of meter damage should be greatly reduced.
This procedure should be repeated whenever air has been introduced to the line or meter.
1. If possible, gravity head should be used to initially fill the meter. The upstream valve should be slowly
opened as product is gravity fed through the meter and air is vented from the high point of the meter or
system.
2. After gravity feeding the meter is complete and all air that can be removed during this step has been
removed, close the upstream isolation valve and energize the pump.
3. Slowly open the upstream isolation valve until the meter and flow control valve are just pressurized. It
is important that the upstream valve be just barely open to ensure that the meter is operated between
50 to 75 gallons per minute (gpm).
4. Initiate low flow between 50 and 75 gpm using the electronic preset. It is recommended that multiple
batches of at least 300 gallons be run to ensure all air from the system is expelled.
5. Vent air from the high-point vent until no sign of air being vented is evident.
6. After all of the air has been bled from the system, gradually open the isolation valve and initiate normal
operation.
3.2 General Operating Information
The PRIME 4 meter has been tested on kerosene and the meter median K-factor has been attached. To
obtain maximum service from Smith Meter meters, it is suggested that detailed records be maintained.
Data about the meter—such as the model, serial number, operating rate, type of product, meter clear-
ances, totalizer readings, meter factor, and other pertinent information—should be recorded. Such
information is an excellent guide in scheduling a preventive maintenance program.
Air trapped inside the rotor takes time to be displaced.

PRIME 4 Installation and Operation Manual
Referenced Publications 7
4 Referenced Publications
The following publications from the American Petroleum Institute are referenced in this manual:
• Manual of Petroleum Measurement Standards
• API Chapter 4—Proving Systems
• API Chapter 5, Section 5.2—Measurement of Liquid Hydrocarbons by Displacement Meter Systems
API Chapter 12, Section 2 Field Manual—Instructions for Calculating Liquid Petroleum Quantities
Measured by Turbine or Displacement Meters
Table of contents
Other TechnipFMC Measuring Instrument manuals

TechnipFMC
TechnipFMC Smith Meter AccuLoad IV Instruction Manual

TechnipFMC
TechnipFMC Smith Meter AccuLoad IV Series Manual

TechnipFMC
TechnipFMC Smith Meter AccuLoad III User manual

TechnipFMC
TechnipFMC Smith Meter Ultra C Series Operating and safety instructions

TechnipFMC
TechnipFMC Smith Meter Instruction manual

TechnipFMC
TechnipFMC Smith Meter MPU C Series Instruction manual

TechnipFMC
TechnipFMC Smith Meter C2 User manual

TechnipFMC
TechnipFMC Proline Promass F 500 Instruction Manual

TechnipFMC
TechnipFMC 4728 User manual

TechnipFMC
TechnipFMC Proline Promass E 500 Instruction Manual