
2
Step 1.
Step 2.
Step 3.
Step 4.
Step 5.
Step 6.
chlorine
chlorine calibration and set up procedure.
Step 9.
Step 10. Verify the inlet and drain ball valves are in the open position
Step 11. for
Step 12.
1. Chlorine panel assembly
a. Built-in pressure regulator 15 to 120 psi.
b. 3/8 inch hose barb connectors.
a. 1 spare membrane cap
b. 1 bottle of electrolyte solution
d. 1 syringe
a. English panel assembly manual
b. CD with multi-language manuals
d. Drill template
6. Customer supplied
Sensor access plugs