6 © 2 Save Energy Limited 2014
• Adjust consumption Voltage and Power Factor settings to measured values if available.
If in doubt leave the default values (Voltage = 230; Power Factor = 1.0) and click
“Next”. Please note that this voltage is the phase to neutral voltage and is hence 230V
rather than 400V (phase to phase voltage).
• Ensure message “Device successfully added to your Intuition system.” is displayed.
• Click the “Finish” button.
• Unless you have further Intuition devices to install / congure then click the “Finish”
button.
• Click the “OK” button to close the Wizard. The web dashboard will then automatically
refresh itself and you should now have an Electricity and a 3 Phase Electricity widget
within the web dashboard, although the live readings will be zero at this stage until
the Sensors are correctly attached in the next step.
STEP FOUR - Install Transmitter and attach Sensors
IMPORTANT:
• You must ensure that each Sensor is ONLY around the live core and NOT around
a sheathed cable containing live, neutral and earth.
• The Sensors must be a loose t onto the cables.
• After the Sensors have been installed, the Transmitter should be hung on the wall
in a free area as far from large metal objects as possible.
• Locate the supply cables between your electricity meter and mains distribution board