The TTK 720 test kit is an all-in-one solution for performing ber inspection, insertion (dB) loss
testing, and red laser continuity testing. This kit has been specically designed to meet the needs of
technicians working in the wireless communications eld.
Item Description
VIS 300C-PM-02-V
All-in-one test platform for ber scoping, dB loss testing, and red laser continuity testing. Includes
touchscreen monitor with customized software and high-denition inspection probe. Power meter and
VFL included.
DLS 355 Dual laser source - outputs 1310 and 1550nm wavelengths for dB loss testing singlemode ber.
AC 029 LC adapter for OPM port on VIS 300C unit.
AC 107B LC 60-degree bulkhead inspection adapter for VIS 300C probe. May be used to scope dicult bulkheads,
such as those in tower-top enclosures.
AC 048B 1.25mm universal inspection adapter for VIS 300C probe.
AC 049B 2.5mm universal inspection adapter for VIS 300C probe.
AC 040B SC bulkhead inspection adapter for VIS 300C probe.
AC 044B LC bulkhead inspection adapter for VIS 300C probe.
AC 4500 Loopback module - single mode. Used to loop signal at tower top in order to test both bers in the pair.
AC 523 Loopback test jumper - plugs into DLS 355 and OPM port on VIS 300C unit in order to plug onto the
ber trunk pair at the tower bottom.
AC 602 LC duplex bulkhead. Used to connect AC 523 to trunk bottom.
AC 089 One-click cleaner for all 1.25mm ferrules. Dry-clean method.
AC 092 Fiber cleaning pad and pen for all exposed ferrules. Wet/Dry clean method.
AC 802 USB cable for data transfer to computer.
AC 015 Large hard carry case.

Page 3
M-UM010-02 TTK 720 06/18
VIS 300C-PM-02-V*
*VFL , OPM, and Scope included DLS 355
AC 049B
AC 092
AC 089
AC 048B
AC 044B
AC 040B
AC 107B
AC 523
AC 602
AC 4500
Kit Overview

Page 4
M-UM010-02 TTK 720 06/18
Test Procedures Overview
The following section will provide an overview of the workow and recommended procedures for
each test that can be performed with the TTK 720 kit. Some procedures may have more importance
placed on them by the carrier: please use these procedures only as a guideline. Wireless carrier
requirements supersede ODM’s recommended procedures in all circumstances.
This section explains how to properly maintain the TTK 720 test kit components between uses.
VIS 300C charging, equipment cleaning, and storage are discussed.
Proper Equipment Care Between Uses
1
When arriving at a new test site or when starting a new project, the user should create a new “Project
Folder” on the VIS 300C unit. This stores all relevant site information (scope images, loss readings, etc.
in one place. This section covers setting up for a new test site.
Creating a New Folder in VIS 300C Software
2
Fiber inspection should be performed before making any connections onsite. Analysis and saving of
images may be required for closeout packages. This section explains how to inspect and clean ber.
Fiber Scoping
3
Also known as “insertion loss” or “ber sweep” testing, dB loss testing allows the technician to validate
that all ber pairs are in working condition. Saving of dB loss test results may be required for closeout
packages. This section explains the necessary steps for testing ber.
dB Loss Testing
4
An onboard red laser allows users to verify proper continuity of ber cables. This is a troubleshooting
task only. This section gives an overview of the VFL functionality.
VFL Testing
5
The VIS 300C has built-in report creation software. This section explains how to create reports for
closeout packages.
Creating and Sharing Reports
6

Page 5
M-UM010-02 TTK 720 06/18
Proper Equipment Care Between Uses
1
1a - Charging the VIS 300C
The VIS 300C charger comes in two pieces. See diagram below. The cable on the right will be
plugged into the power brick to create the charging device.
Allow the VIS 300C to charge fully between uses. The VIS 300C can be used while charging;
please be aware that an internal fan may activate to regulate temperature. 4-5 hours battery
life typical for a single charge.
Wall Plug
VIS 300C
Light on Charger:
Red when charging
Green when fully charged

Page 6
M-UM010-02 TTK 720 06/18
1b - Cleaning the DLS 355
The DLS 355 laser source is a high-end test laser, capable of outputting 1310 and 1550nm
wavelengths. The output port of this unit utilizes a physical connection, which means that it
can become soiled if used improperly. When needed, the DLS 355 adapter may be removed for
inspection and cleaning of the ber ferrule.
Optical Design Manufacturing Inc.
www.odm-inc.com
λ
DLS 355
Dual Laser
Source
2kHz
LOW
BAT
1550
1310
Optical Design Manufacturing Inc.
www.odm-inc.com
λ
DLS 355
Dual Laser
Source
2kHz
LOW
BAT
1550
1310
Optical Design Manufacturing Inc.
www.odm-inc.com
λ
DLS 355
Dual Laser
Source
2kHz
LOW
BAT
1550
1310
DLS 355 is stored with
adapter ON to protect
ferrule inside.
Remove adapter by
unscrewing until it spins
freely, then pull o.
Inspect ferrule with
VIS 300C and clean
with appropriate tools.
Always replace adapter.
Regular inspection and cleaning of the output port of the DLS 355 may not be necessary if
appropriate procedures are followed. Always inspect test jumpers before they are plugged into
the DLS 355 and store it properly to ensure continued performance.

Page 7
M-UM010-02 TTK 720 06/18
1c - Inspecting and Cleaning Fiber Jumpers and Loopback
Special care should be taken to ensure the continued function of all test jumpers and
loopbacks. A regular inspection and cleaning regimen will keep kit components functional for a
longer period of time.
AC 4500 Each arrow in the diagram at left
indicates a ber ferrule that should be
inspected and cleaned between uses.
AC 523
1d - Equipment Storage
All equipment should be stored in the airtight case provided by ODM. Keep the case in a cool,
dry location and remove battery from the DLS 355 if it must be stored for over 6 weeks.

Page 8
M-UM010-02 TTK 720 06/18
The VIS 300C platform saves all test information in a folder system onboard. The internal memory is
capable of saving thousands of images and power meter readings. Follow the steps below to create a
new folder when beginning a project.
Creating a New Folder in VIS 300C Software
2
Touch
“Projects” Button
Main Inspection
Screen
Touch
“New Project”
Give the project a name using the onscreen keyboard. Touch “Create” to make the project folder.
Touch
“Create”
Enter Project
Name
2a - Create a New Project

Page 9
M-UM010-02 TTK 720 06/18
The next screen contains several text elds which help make the project unique. Fill out these elds
using the onscreen keyboard as appropriate, then touch “OK”. You’ll be taken back to the Main
Inspection Screen.
Enter all
Project Details
Touch
“OK”
Touch
Settings Icon
2b - Change Project Information
If you ever need to change this information, touch “Projects” on the main screen of the unit,
then touch “View Projects,” then choose the appropriate project name. The screen shown below
will appear. Touch the settings icon in the top right of the window to make changes to this
information.

Page 10
M-UM010-02 TTK 720 06/18
The VIS 300C probe and monitor combination allows users to inspect ber endfaces using an
automated analysis algorithm. This section gives an overview of inspection procedures.
Fiber Scoping
3
3a - Adjust Settings
The VIS 300C has several automated analysis algorithms available. Choose from the available
options in the “Settings” menu under “IEC Prole.”
Touch
“IEC Prole”
Choose from a list of algorithms to use for automated analysis. All algorithms are based on the IEC
standards document 61300-3-35.
Touch
Appropriate
IEC Prole
NOTE:
SM UPC ≥45dB is by
far the most common
ber type used in
the wireless industry.
Contact ODM if you
are unsure of which
algorithm to use.
This manual suits for next models
2
Table of contents
Other ODM Measuring Instrument manuals