
Base and Rover Setup via Tracy
Rover setup (TRIUMPH-1 with Internal Radio)
Base Station Setup
7www.javad.com
5. Click Start button to start survey. In the type drop-down list box select Point to survey a
point, or Trajectory for trajectory surveying (Figure 1-8)
• Insert point name in the Name field, code and comments in the corresponding fields.
• Insert the antenna height and type of antenna height measurement.
• Click the Point button to start point surveying. New window with the surveying
information appears.
• To finish surveying this point click the Finish button.
•ClickCancel to stop surveying points.
• If the trajectory is selected, make the same settings as described above, and click the
Trajectory button to start trajectory surveying.
• To finish surveying the trajectory click the Finish button.
•ClickCancel to stop surveying trajectory.
Figure 1-8. Survey Tab. Point surveying