CODEL Tunnel Tech 500 Series User manual

CODEL Page 1 Operation and Maintenance
Issue: A Revision:3 Date:16/01/2019 Ref:1003 1
TECHNICAL MANUAL
Tunnel Tech 00 Series
Tunnel Tech 501 – CO/NO/NO2
Tunnel Tech 502 – CO/NO
Tunnel Tech 503 – CO
Tunnel Tech 504 – NO
Tunnel Tech 505 – NO2
Tunnel Tech 506 – CO/NO2
Tunnel Tech 507 – NO/NO2
Tunnel Atmosphere Monitoring System
(CO/NO/NO2)
CODEL International Ltd.
Station Building, Station Road, Bakewell, Derbyshire DE4 1GE United Kingdom

CODEL Operation and Maintenance Manual
Issue: A Revision:3 Date:16/01/2019 Ref:1003 1

CODEL
Operation and Maintenance Manual
Issue: A Revision:3 Date:16/01/2019 Ref:1003 1
CODEL International Ltd is a UK company based in the heart of the Peak District National Park at Bakewell,
Derbyshire. The company specialises in the design and manufacture of high-technology instrumentation for the
monitoring of combustion processes and atmospheric pollutant emissions.
The constant search for new products and existing product improvement keeps CODEL one step ahead. With a
simple strategy, to design well-engineered, rugged, reliable equipment, capable of continuous operation over
long periods with minimal maintenance, CODEL has set standards both for itself and for the rest of the industry.
All development and design work is carried out ‘in-house’ by experienced engineers using proven state-of-the-
art CAD and software development techniques, while stringent assembly and test procedures ensure that the
highest standards of product quality, synonymous with the CODEL name, are maintained.
High priority is placed upon customer support. CODEL’s dedicated team of field and service engineers will assist
with any application problem to ensure that the best possible use is derived from investment in CODEL quality
products.
If you require any further information about CODEL or its products, please contact us using one of the numbers
below or alternatively visit our web site.
t : +44 (0) 1629 814 3 1
f : +44 (0) 8700 66 307
web : www.codel.co.uk

CODEL Operation and Maintenance Manual
Issue: A Revision:3 Date:16/01/2019 Ref:1003 1

CODEL Operation and Maintenance Manual
Issue: A Revision:3 Date:16/01/2019 Ref:1003 1
Content
1 System Description ......................................................................................................................................... 1
1.1 The Tunnel Tech 00 Series Concept .................................................................................................... 1
1.2 CO, NO, and NO2 ................................................................................................................................... 2
1.3 Power Supply Unit (PSU) ....................................................................................................................... 3
2 Principles of Operation ................................................................................................................................... 4
2.1 Electro Chemical Cell – CO/NO/NO2 ..................................................................................................... 4
3 Specification ...................................................................................................................................................
3.1 Technical data: ......................................................................................................................................
3.2 Construction and Enclosure: ................................................................................................................. 6
3.3 Output and Interface............................................................................................................................. 6
3.4 Compliance and Certification: ............................................................................................................... 6
3. Optional Items ....................................................................................................................................... 7
3.6 Output and Interface: ........................................................................................................................... 7
3.7 Cables .................................................................................................................................................... 8
3.8 Installation Material .............................................................................................................................. 9
4 Installation .................................................................................................................................................... 10
4.1 Mounting Details ................................................................................................................................. 10
4.2 Connections ........................................................................................................................................ 12
Commissioning ............................................................................................................................................. 1
.1 Keypad Membrane .............................................................................................................................. 1
.2 Power Up ............................................................................................................................................. 1
.3 E-Cell commissioning .......................................................................................................................... 16
.4 mA Output Setup ................................................................................................................................ 18
. Relay Output Setup ............................................................................................................................. 20
.6 Time and Date ..................................................................................................................................... 22
6 Maintenance ................................................................................................................................................. 24
6.2 Spare parts .......................................................................................................................................... 28
7 Data Communication .................................................................................................................................... 29
7.1 Hardware Configuration ...................................................................................................................... 29
7.2 Address Numbers ................................................................................................................................ 30
8 List of Figures ................................................................................................................................................ 32
9 Appendix 1: MODBUS Communication & RS48 Connection....................................................................... 33

CODEL Operation and Maintenance Manual
Issue: A Revision:3 Date:16/01/2019 Ref:1003 1

CODEL Operation and Maintenance Manual
Issue: A Revision:3 Date:16/01/2019 Ref:1003 1
IMPORTANT
The warning signs (and meanings) shown below, are used throughout these instructions and are intended to
ensure your safety while carrying out installation, operation and maintenance procedures. Please read these
instructions fully before proceeding.
Caution, risk of electric shock.
Caution, risk of danger.
Caution, hot surface.
Earth (ground) terminal.
Protective conductor terminal

CODEL Operation and Maintenance Manual
Issue: A Revision:3 Date:16/01/2019 Ref:1003 1

CODEL Page 1 Operation and Maintenance
Issue : A Rev. : 3 Date : 13/11/2018 Ref. : 1003 1 P a g e | 1
1Sy tem De cription
1.1 The Tunnel Tech 500 Serie Concept
Tunnel Tech 00 Series is an all-new tunnel atmosphere monitoring system designed exclusively for road
tunnel applications. It offers a family of monitors that provide all the essential measurements necessary to
monitor a tunnel atmosphere for:
- Carbon Monoxide
- Nitric Oxide
- Nitrogen dioxide
This is achieved by using a modular design concept so that the users’ precise monitoring requirements can be
satisfied with a minimum number of components, minimum tunnel cabling and minimum installation costs. It
also offers a variety of data outputs to enable simple acquisition of data.

CODEL Operation and Maintenance Manual
Issue : A Rev. : 3 Date : 13/11/2018 Ref. : 1003 1 P a g e | 2
The monitoring stations, Figure 1, provide all required measurements and outputs at each monitoring location
within the tunnel.
Figure 1: Tunnel Tech 500 Serie - Monitoring Station
1.2 CO, NO, and NO2
CO, NO and NO2 are measured using electrochemical cell technology. Once the zero level of the cell is set and
recorded in the instrument memory, the cell output is linear and proportional to the ppm or ppb reading.
A serial data link via an RS48 interface allows communication directly with the TunnelTech 00 sensors.
The PSU is required to convert the mains (90-263V AC) supply to the 24V DC required to power the TunnelTech
00.
This manual suits for next models
7
Table of contents
Other CODEL Measuring Instrument manuals

CODEL
CODEL Tunnel Tech 700 Series User manual

CODEL
CODEL Energy Tech 301 Guide

CODEL
CODEL TunnelTech 500 Series User manual

CODEL
CODEL EnergyTech 100 Series Guide

CODEL
CODEL Energy Tech 401 User manual

CODEL
CODEL DCEM2000 User manual

CODEL
CODEL TunnelTech 601 User manual

CODEL
CODEL EnergyTech 203 User manual

CODEL
CODEL GCEM4000 User manual

















