Chapter 1 Use and maintenance: reminders and further information 9
Maintenance manual
2016/02
AlveoPC
Chapter 1. Use and maintenance: reminders and
further information
This chapter summarizes the most important instructions concerning the use and maintenance of the
AlveoPC.
For more detailed information, please refer to the corresponding user instructions.
This part also includes additional information intended exclusively for persons authorized to carry out
maintenance operations on the instruments.
1. Operating conditions ■ Installation
Use of the instruments requires a flat, clean and unobstructed work
surface. The instruments must be set level using their adjustable
legs, in particular the Alveograph (level supplied).
The surrounding area should be suitable for relating handling oper-
ations (preparation of pieces of dough in particular).
❏ For water line connections:
The water line cooling circuit must be installed very carefully:
- hard wall hoses must be used,
- these must be fixed with pipe supports,
- drain pipe fixed.
❏ For recirculating cooler connections:
Device must be connected as per manufactures recommendation.
Water temperature : 18°c to 20°c.
■ Electrical connections
The electrical connection of each instrument must be compliant with
IEC standard 1010 - installation category: II.
❏ Characteristics of the power source:
• 220-240V~ - 50/60 Hz -1.3 kVA
• Power sockets 2P + E/16 A
• The electricity network must include a DDR with a sensitivity
d30 mA class AC upstream of the instruments.