ATEQ D620 User manual

ATEQ D620
Quick Start Guide

D620.388.00_QS_UK_01
2/03
Table of contents
Safety advisory / Warranty
Good practices and safety instructions 5
Air quality requirements 6
Preamble
ATEQ D620, a universal flow meter 7
Flow rate test 8
Principle of a cycle 10
Your ATEQ D620
Front panel 11
Connectors on the back panel (with all options) 12
Power supply connectors 14
Digital links 15
Digital inputs/outputs 18
Pneumatic connectors 22
Pneumatics configuration 26
User interface
Overview 31
Keys 31
Display 32
Starting up
Power up 34
Preparing a Program 34
Modifying a parameter 35
Selecting a program 36
Starting and stopping current cycle 36

D620.388.00_QS_UK_01
3/03
User adjustments
Options of the menus 37
Specifications
Characteristics 42

D620.388.00_QS_UK_01
4/42
ATEQ - Measurement Solution, Global Leader.
ATEQ
15, rue des Dames, Z.I.
78340 LES CLAYES-SOUS-BOIS
FRANCE
ateq.com
T.: +33 1 30 80 1020
F.: +33 1 30 54 1100
ATEQ K.K.
3 – 41 ATEQ Building, Ikehata
Chiryu-city, Aichi-pref
JAPAN
ateq.co.jp
T.: +81 566-84-4670
F.: +81 566-84-4680
ATEQ China
98 Jian Peng Lu
Shanghai
CHINA
ateq.com.cn
T.: +86 21 6763 9508
F.: +86 21 6763 9528
ATEQ SYSTEMS ANALYSIS
TAIWAN CO., LTD.
NO. 3, LAN 223, San Jia Dong
Street
40642, TAICHUNG
TAIWAN
ateq.com.tw
T.: +886 4 2437 5278
F.: +886 4 2437 3675
ATEQ CORP.
35980 Industrial Road Suite L
Livonia MI 48150
UNITED STATES
atequsa.com
T.: +1 734-838-3100
F.: +1 734-838-0644
We continuously work on improving our products. This is why information contained in this
manual, the device and the technical specifications may be modified without prior notification.
Pictures and figures in this manual are non-contractual.

D620.388.00_QS_UK_01
5/42
Safety advisory / Warranty
GOOD PRACTICES AND SAFETY INSTRUCTIONS
Safety recommendations
If the device is supplied with 100/240VAC, it is mandatory to connect it to the ground with
a good link to the ground, to protect against electric hazard or electrocution.
It is dangerous to change the status of the outputs.
They can control power actuators or other equipment (mechanical, pneumatic, hydraulic,
electrical or other) which can cause serious personal injury and damage to surrounding material.
For safety and quality measurement reasons, it is important, before powering on the device,
to ensure that it is air supplied with a minimum operating pressure (0.6 MPa ± 15%).
Recommendations for the test environment
Keep the test area as clean as possible.
Recommendations for operators
ATEQ recommends that the operators who use the devices have training and a level of
qualification that correspond to the job to perform.
General recommendations
— Read the user manual before using the device.
— All electrical connections to the device must be equipped with safety systems (fuses,
circuit breakers, etc.) adapted to the needs and in accordance with the applicable
standards and rules.
— To avoid electromagnetic interference, electrical connections to the device must be
shorter than 2 meters.
— Power supply plug must be grounded.
— Disconnect the device from the mains before performing any maintenance work.
— Shut off the compressed air supply when working on the pneumatic assembly.
— Do not open a connected device.
— Avoid splashing water on the device.
ATEQ is at your disposal for any information concerning the use of the device under
maximum safety conditions.
We draw your attention to the fact that ATEQ cannot be held responsible for any
accident related to a misuse of the measuring instrument, the workstation or non-
compliance of the installation with safety rules.
In addition, ATEQ declines any responsibility for the calibration or the fitting of their
instruments that is not done by ATEQ.
ATEQ also declines any responsibility for any modification (program, mechanical or
electrical) of the device done without their written consent.

D620.388.00_QS_UK_01
6/42
AIR QUALITY REQUIREMENTS
The air supplied into the device must be clean and dry. Even though the device is provided
with a filter, the presence of dust, oil or impurities may cause malfunction.
Air quality requirements according to ISO standard 8573
The air must be clean and dry.
The presence of impurities, oil or humidity in the air may cause deterioration which will not
be covered by the warranty.
When the instrument is working in vacuum conditions, impurities must be prevented from
being drawn into its internal components.
For this purpose we strongly recommend that a suitable airtight filter is installed between
the part under test and the instrument.
ATEQ recommends the following characteristics for the air supplied into the device.
Air characteristics ISO standard 8573 class
Grain size and concentration 0.1 μm and 0.1 mg/m3 Class 1
Dew point under pressure - 40° dew Class 2
Maximum concentration of oil 0.01 mg/m3 Class 1
Recommended additional equipment
ATEQ recommends the installation of this additional equipment:
— Air dryer to provide dry air at less than - 40° dew point
— 25 micron and 1/100 micron double filter.

D620.388.00_QS_UK_01
7/42
Preamble
ATEQ D620, A UNIVERSAL FLOW METER
ATEQ D620 is a universal flow meter that measures flow rates through parts to test.
ATEQ D620 can memorise 128 different test programs.

D620.388.00_QS_UK_01
8/42
FLOW RATE TEST
The ATEQ D6 series can do direct or indirect measurements. In both cases, the flow meter
can also work in depressurization (option).
Measurement principle
When the fluid (gas) enters the device1, it moves through a calibrated flow tube2which
causes a drop in pressure. The pressure drop is measured by a differential pressure sensor3.
The pressure of the part under test 5 is measured by the sensor4.
1Device
2Calibrated flow tube
3Differential pressure sensor
4Pressure sensor
5Part under test
Direct measurement
Once the part is filled, the device measures the flow rate through the part.
The test pressure is applied to the device1 and then to the input of the part under test2.
1Device
2Part under test

D620.388.00_QS_UK_01
9/42
Indirect measurement
The indirect measurement (also called recovery mode or under bell) allows a considerable
gain in time as the flow which enters into the device is already stabilized.
The test pressure is first applied to the input of the part under test1and then to the
device2. The output of the device2is vented to the atmosphere.
This method allows to test the parts at a higher pressure test (up to 2 MPa).
1Part under test
2Device
Depending on the part type, it may be possible to use a bell (ex: shower head where it is
impossible to recover the flow other than through the use of a bell). This method can only be
used if the recovery of the flow is easy.

D620.388.00_QS_UK_01
10/42
PRINCIPLE OF A CYCLE
The measurement cycle is made of 4 main phases: fill, stabilization, test, dumping.
An additional Pressure auto zero phase0can be placed at the start or at the end of a cycle,
depending on the requirement of the operator.
Flow rate
(0) (1) (2) (4) (0)
Time
Cycle start Cycle end
(3)
0Pressure auto zero phase
1Fill phase
2Stabilization phase
3Test
4Dumping
Table of contents
Other ATEQ Measuring Instrument manuals


























