AirBench AOF User manual

© Copyright AirBench Ltd 2021 Page
1 of 24
AOF
Installation Manual
This Edition: 20th September 2022
Please ensure this manual is read and understood fully prior to installation
Damage may be caused to the unit if instructions are not followed correctly
AirBench Ltd, 6b Commerce Way, Colchester CO2 8HR
www.airbench.com
+44 (0) 1206 791191
AIRBENCH LTD

© Copyright AirBench Ltd 2021 Page
2 of 24
INTRODUCTION 4
OVERVIEW 4
ABOUT AOF 4
ABOUT THIS DOCUMENT 4
SCOPE OF SUPPLY 5
INSTALLATION 7
GENERAL 7
415V 3 PHASE WIRING ALTERATION & LED POWER CONFIGURATION 8
INSTALLATION GUIDE 11
ADJUSTMENT OF LED WARNING INDICATORS 15
COMMISSIONING 17
TROUBLESHOOTING 18
AIRBENCH LTD

© Copyright AirBench Ltd 2021 Page
3 of 24
CAUTIONS
Do not place this product near a powerful magnetic field or expose to static
electricity.
Do not drop unit or damage the unit body.
This unit is not ATEX rated.
It is your responsibility under ATEX regulations to ensure this unit is located in an
area which is rated as suitable for the specification of the unit.
We do not accept responsibility for any inconvenience or damage caused by
unusual or unspecified applications. If the product is damaged or service is
required, please contact us.

© Copyright AirBench Ltd 2021 Page
4 of 24
Introduction
Overview
Thank you for choosing AirBench AOF as your mist control system. Please read this document before
installation.
This document details installation activities which are essential to correctly install your AOF. We
recommend that the Responsible Person reads this manual fully prior to installation and operation of
the AOF.
This document refers to the AOF range. Models of this type are available with a range of filter
configurations. The filter configuration in use is detailed on the system Commissioning Certificate and
on order.
About AOF
AirBench AOF is a dedicated coolant mist / smoke filter system designed for installation to machine
tools, for the removal of contaminants from most types of machining.
AOF is currently patent pending.
About this Document
This document provides full installation instructions for the AOF range. It should be read in
conjunction with the Commissioning Certificate supplied on installation. If you have any concerns or
doubts about the installation of this unit, contact the supplier.

© Copyright AirBench Ltd 2021 Page
5 of 24
Scope Of Supply
Name
Quantity
Air inlet adaptor
1
Flexible hose clamp
2
Jacob Hose Connector
2
Jacob Clamp
2
Jacob U-Seal
2
Anti-vibration mount 8 or 10mm
4

© Copyright AirBench Ltd 2021 Page
6 of 24
Flexible hose
1.5M
1
1.25 four-core oil proof cable 3.3M
1
Oil drain hose 3M
1
Pre-installed
Power switch (optional)
1

© Copyright AirBench Ltd 2021 Page
7 of 24
Installation
General
•Installation must only be performed by an authorized Technician/Electrician who has carefully
read the installation guide. This is to prevent electric shock or damage to the machine and a
trouble free installation.
•To ensure correct performance, the air cleaner should be properly installed on the machine
tool. The installation area must be stable and vibration-resistant. If the machine is not capable
of supporting the weight of the AOF, use a stand or mount to a wall.
•To maintain efficiency, maintain high bend radius in hoses.
•The electric wiring must comply with electrical standards and should be completed by a
qualified and competent Electrician or Technician.
•Our AOF units come pre-wired for 220V 3 phase supply (220/3/50) and may also be
configured for 415V 3 phase (415/3/50). For further electrical information, refer to the
following guidance in this manual.
•When installing the unit, motor / overload protection must be provided. A suitably sized DOL
starter or motor protection circuit breaker should be used.
•Do not change the power wire length or use extension wire.
•After installation, the installer should complete commissioning tests as detailed within this
document.

© Copyright AirBench Ltd 2021 Page
8 of 24
415V 3 Phase wiring alteration & LED power
configuration
Please ensure that the following instructions are read and understood fully before beginning
installation, installation should only be carried out by a trained and competent person.
Failure to do this will result in damage to the unit
When changing supply voltage from 220V 3 Phase to 415V 3 Phase the following alterations are
required to the internal wiring.
AOF internal wiring change for 415V 3PH supply
1. Remove back plate to gain access to electrical terminal box
2. Remove 6 x screws from electrical terminal box and remove cover
3. Remove plastic terminal cover
4. Loosen and remove the required terminal nuts to enable relocation of motor connections
5. Remove brass connecting bar
6. Locate cores 5 & 6 and remove from original terminals
7. Re-terminate cores 5 & 6 with core 4 to LHS middle terminal
8. Re-terminate white P.C.B supply core with cores 4, 5 & 6
9. Tighten all connections ensure cores are terminated at the correct terminals
10. Refit plastic terminal cover
11. Refit terminal box lid ensuring seal is fitted
12. Refit back plate

© Copyright AirBench Ltd 2021 Page
9 of 24
Phase change on AOF units with L.E.D
indication
From the P.C.B you will see the 2 core LED
PCB power cable (arrowed) which will need to
be configured to the correct voltage being
supplied to the mist filter.
Please see below for wiring configurations for
both 220v 3 phase and 415v 3 phase.
Standard configuration for 220V 3 Phase
supply - as supplied
The AOF units will be shipped in a standard
wired configuration to be connected to a
220V 3 Phase supply.

© Copyright AirBench Ltd 2021 Page
10 of 24
If a 220V 3 Phase supply is being used then
no alteration to the internal wiring is
required.
Altered configuration for 415V 3 Phase
supply
If a UK standard supply of 41V 3 Phase is
intended to be used to power the AOF then
alteration to the motor wiring and LED supply
cable are required.
Failure to carry out this alteration
correctly can result in damage to the fan
motor and P.C.B.
AirBench will not be held responsible for
any damage caused to any system
components, it is the responsibility of the
installer to ensure all connections and
voltages are correct before attempting to
run the unit.
Other manuals for AOF
1
Table of contents
Other AirBench Industrial Equipment manuals