
3
INSTALLATION
WARNING
INSTALLATION SHOULD BE COMPLETED BY
QUALIFIEDPERSONNELONLY.
Location - The most uniform operating conditions
willbeobtainedbyplacingthebathonalevelsurface
in an area remote from drafts, ventilating outlets,
radiators, and other rapidly changing ambient
conditions.
Electrical Connections -
IMPORTANT
FOR PERSONAL SAFETY, THIS APPARATUS
MUSTBEPROPERLY GROUNDED.
1. Thepowercordprovidedonthisunitisequipped
withathree-prong(grounding)plugwhich mates
with standard three-prong grounding wall
receptacletominimizethepossibilityofelectric
shockhazardfromthisapparatus. Ifindoubtthe
usershouldhavethewallreceptacleandcircuit
checkedbyaqualifiedelectriciantomakesure
the receptacle can provide adequate current
andisproperly grounded.
2. Whereastandardtwo-prongwallreceptacleis
encountered, it is the personal responsibility
andobligationoftheusertohaveitreplacedwith
aproperlygroundedthree-prongwall
receptacle.
Do not, under any circumstances, cut or remove
the third (ground) prong from the power cord. Do
not use a two-prong adapter plug.
Determinethetotalamountofcurrentbeingusedby
otherapparatusconnectedto the circuit that will be
used for this apparatus. It is critical that the added
current demand (see nameplate) of this and other
equipmentusedonthesamecircuitdoesnotexceed
theratingof the fuse or circuit breaker.
CAUTION
BESURETHATTHEPOWERSUPPLYISOFTHE
SAME VOLTAGE AS SPECIFIED ON THE
NAMEPLATE.
Shaker Clip Installation - The spring retainers
providedaredesignedtofirmlyholdflaskclipsinthe
shakingtrayholes.
1. It is important that these retainers be inserted
into tray holes before inserting optional flask
clips.
Stroke Length Adjustment - The length of the
shakerstrokeissetatthefactoryfora1"stroke. The
following procedure should be observed when
changingstrokelengths.
WARNING
TURN OFF POWER TO THE BATH AND
DISCONNECT THE BATH FROM ITS POWER
SUPPLY.
1. Togainaccesstothemotordrivehub,remove
four screws in upper side panel corners, and
carefullyopenthecontrolpanel.Onceopened,
the 3-position drive hub will be immediately
visibleattop-centerofcontrolhousing.
2. Toalterthestrokelength,unscrewthebearing
mounting screw from its present position and
rethread the screw firmly into the hole that will
provide the desired stroke length. The hole
closestto the hub centerprovidesthe shortest
stroke;theonefurthestaway,thelongest. The
threethreadedopeningsprovidestrokelengths
of 0.5", 1.0", and 1.5".
3. After selecting desired stroke length, close
control panel and replace the four screws.
Reconnectthebathtopowersource.
Dubnoff Flowmeter Assembly (Optional) -
1. Theoptionalflowmeterassemblyisinstalledby
placingthedovetailonthefrontoftheflowmeter
intothematingbracketlocatedonthebackright
sideofthebath.Theflowmeteriscalibratedfor
use with oxygen, nitrogen, and CO2 and is
scaledtoreaddeliveryrates upto10standard
cubicfeet perhour.
2. Connect the bottom hose barbs to the gas
sources. The top hose barbs connect to the
gassing hood(s) with the tubing provided. A
valveisconnectedtoeachoftheflowmetersfor
moreprecisecontroloftheatmosphere.