norwellVR. NWJR503 User manual

IN-GROUND
INSTALLATION MANUAL

INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
Dig holes according to positions on
drawings (see the following pages).
Tighten the anchors (M12 = 90 N/m
and M16 = 120 N/m).
Dimensions of holes:
e.g. 50 x 50 x 75 cm (see the
following pages).
Drill bolt holes with a concrete
hammer.
Make sure the fitness station is stabil
and properly fastened before filling
with dirt to the surface.
Fill with concrete leaving a depth of
e.g. 25/40 cm (see the following
pages). Dry for approx. 6-7 days.
Mount the M12/M16 concrete
bolts.
REQUIREMENTS FOR THE CONCRETE
The concrete must comply with the standard EN197-1 CEM I 52,5 N.
Mixing ratio: Cement 1/8
Sand 3/8 (max. stone size 4mm)
Stones 4/8 (stone size 16mm)
The concrete must be premixed or mixed in a mixer. Hand mixing is not
acceptable.
For the concrete to settle, it must be vibrated with a concrete vibrator.
To ensure correct contact between the base plate and the concrete, the
concrete surface must be 100% plane.
The concrete has to have the strength of ≥52,5 MPa (obtained in approx.
7 days, but longer in cold weather).
The installation must be carried out by professionals and according to current
practice.

NWJR102
Junior Back
NWJR101
Junior Chest
2,10m
INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
See separate page with the
preparatory work for in-ground
installation.
• Install onto a concrete block.
• Assemble and line up.
• Place on concrete.
• Mark position of bolt holes.
• Fasten each base plate with
4 x M16 bolts.
POSITION AND TRAINING ZONE: DEPTH:
PART LIST:
4 x M16
BASE PLATE:
40 x 40cm
0,75m
0,25m
0,50m
0,70m
CONCRETE
BLOCK

NWJR103 Junior Sit Up
INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
See separate page with the
preparatory work for in-ground
installation.
• Install onto 2 concrete blocks.
• Assemble and line up.
• Place on concrete.
• Mark position of bolt holes.
• Fasten each base plate with
4 x M12 bolts.
POSITION AND TRAINING ZONE: DEPTH:
0,50m
0,50m
0,75m
0,25m
CONCRETE
BLOCK
PART LIST:
8 x M12
BASE PLATE:
25 x 25cm

NWJR104 Junior Pull Up
2,12m
INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
See separate page with the
preparatory work for in-ground
installation.
• Install onto 2 concrete blocks.
• Assemble and line up.
• Place on concrete.
• Mark position of bolt holes.
• Fasten each base plate with
4 x M16 bolts.
POSITION AND TRAINING ZONE: DEPTH:
0,50m
1,00m
0,75m
0,25m
CONCRETE BLOCK
PART LIST:
8 x M16
BASE PLATE:
40 x 40cm

NWJR105 Junior Bar
INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
See separate page with the
preparatory work for in-ground
installation.
• Install onto 2 concrete blocks.
• Assemble and line up.
• Place on concrete.
• Mark position of bolt holes.
• Fasten each base plate with
4 x M12 bolts.
POSITION AND TRAINING ZONE: DEPTH:
0,50m
0,50m
0,75m
0,25m
CONCRETE
BLOCK
PART LIST:
8 x M12
BASE PLATE:
25 x 25cm

NWJR201 Junior Double Air Walker
INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
See separate page with the
preparatory work for in-ground
installation.
• Install onto 6 concrete blocks.
• Assemble and line up.
• Place on concrete.
• Mark position of bolt holes.
• Fasten each base plate with
4 x M12 bolts.
ASSEMBLING:
POSITION AND TRAINING ZONE: DEPTH:
0,50m
0,50m
0,75m
0,25m
CONCRETE
BLOCK
PART LIST:
24 x M12
2 x cross bar
2 x sets of Nut caps, round
4 x M10 x 110 bolts
4 x Stainless Steel connector
Always secure
bolts with
Loctite.
BASE PLATE:
25 x 25cm

NWJR202 Junior Cross
1,42m / 4’7”
INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
See separate page with the
preparatory work for in-ground
installation.
• Install onto a concrete block.
• Assemble and line up.
• Place on concrete.
• Mark position of bolt holes.
• Fasten each base plate with
4 x M16 bolts.
POSITION AND TRAINING ZONE: DEPTH:
PART LIST:
4 x M16
BASE PLATE:
40 x 40cm
0,50m
0,70m
0,90m
0,40m
CONCRETE
BLOCK

NWJR203 Junior Hip
INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
See separate page with the
preparatory work for in-ground
installation.
• Install onto 2 concrete blocks.
• Assemble and line up.
• Place on concrete.
• Mark position of bolt holes.
• Fasten each base plate with
4 x M12 bolts.
POSITION AND TRAINING ZONE: DEPTH:
0,50m
0,50m
0,75m
0,25m
CONCRETE
BLOCK
PART LIST:
8 x M12
BASE PLATE:
25 x 25cm

NW501 Bench
INSTALLATION MANUAL ·IN-GROUND
www.norwell.dk · info@norwell.dk COPYRIGHT © 2015 Norwell A/S
See separate page with the
preparatory work for in-ground
installation.
• Install onto 4 concrete blocks.
• Assemble and line up.
• Place on concrete.
• Mark position of bolt holes.
• Fasten each base plate with
4 x M12 bolts.
ASSEMBLING:
POSITION AND TRAINING ZONE: DEPTH:
0,50m
0,50m
0,75m
0,25m
CONCRETE
BLOCK
PART LIST:
16 x M12
4 x sets of Nut caps, round
4 x M10 x 110 bolts
Always secure
bolts with
Loctite.
BASE PLATE:
25 x 25cm