
- 4 -
MIHM-VOGT GmbH & Co. KG, Dental-Gerätebau, Dunantstr. 7, D-76131 Karlsruhe, Tel.: +49/721/96174-0, Fax: +49/721/96174-20
GB
• The MIHM-VOGT laboratory furnace should be set up only in dry areas and should not get in
contact with liquids. In the area of the furnace, furniture and other objects cannot consist of
explosive, combustible or easily inflammable materials. In the installation area of the furnace, no
easily inflammable or combustible gases or liquids are allowed to be stored.
• Modifications of the MIHM-VOGT laboratory furnace can only be made after prior written
agreement from us. We are not liable for damages caused by your modifications. Before every
maintenance, the appliance is to be turned off and the power-supply plug is to be pulled out.
• The furnace must always be connected to a separate circuit protected by a 15/16 Amp fuse.
• The hot furnace door should only be touched at the grip; the hot muffles should only be touched
with sufficiently long tongs. Because of the wax fumes and the steam from casting rings, the
furnace should be equipped with an exhaust blower or catalyzer and placed under a fume
extraction hood. The fumes are to be extracted to the outside.
• The ceramic tray is to be used to protect the heating muffle. The furnace must never be used
without the ceramic tray. Cracked or damaged ceramic trays must be replaced immediately.
• The transportation protection of the heating muffle must be taken off before the first use.
5. Installation{ XE "Installation" } and electrical connection{ XE
"Electrical connection" }
The laboratory furnace is to be positioned in a dry area in accordance with the safety warnings,
and it is to be connected to a separated circuit secured with 15/16 Amp. The transportation
protection{XE "Transportation protection" }is to be removed from the heating muffle. The
laboratory furnaces type KM, SL and GL are to be connected to an earthed plug 230 V, the
laboratory furnaces type BL and TL are to be connected to a CEKON plug 230/400 V AC. If
necessary, the exhaust blower{XE "Exhaust blower" }DG2 or the catalyzers{XE "Catalyzer" }
KN / KN2 are installed on the furnace rear. They are to be connected into the socket marked
'Gebläse'.
6. Start-up{ XE "Start-up" }
6.1 Start-up{XE "Start-up" }
Prior to the first use, the muffle must be heated up on 1050°C for 90 minutes. This way, the
necessary oxide layer is formed on the heating wire.
6.2 Loading{ XE "Loading" }
The casting muffles are to be put on the ceramic tray. Metal muffle rings should not come in
contact with the lateral walls.