Huawei NetCol5000-C030 Series User manual

1Overview Copyright © Huawei Technologies Co., Ltd. 2019 All rights reserved.
2Preparing Materials
Materials
Configured with
the Equipment
Fuse
, combined hexagon head bolts M12x90,
OT ground terminal of the power cable to the
indoor unit
, and single cord end terminal of the power cable to the indoor unit, cable ties
Engineering
Procurement
Automatic drainpipe
BSPT 1/2
-inch rigid pipe connector with external threads, and rigid
pipe (PP
-R or C-PVC)
Humidifier water
inlet pipe
G 3/4
-
inch rigid pipe connector with internal threads (plastic materials
such as PA66,
or metal materials are recommended), and rigid pipe
(withstand pressure
≥0.7 MPa)
Chilled water inlet
and outlet pipes
Seamless steel pipe with a G 1 in. external threadedconnector or
Aluminum plastic pipe (withstand pressure
≥1.6 MPa)
Model
NetCol5000
-C030
NetCol5000
-C032
Cooling Capacity (kW)
30
32
Net Weight (kg) (full configuration)
166
176
Dimension (mm) (H x W x D)
2000 x 300 x 1200
2200 x 300 x 1200
Optional components
Humidification, differential pressure sensor, and
Wifi module
Electric control box
Air filter
Water outlet pipe
Water inlet pipe
Drainpipe
Humidifier pump
Water pan
Fan
Display screen
Chilled water valve
1
Issue: 04
Date: 2019-06-24
NetCol5000-C(030, 032) In-row Chilled
Water Smart Cooling Product
Quick Guide

Preparing an Indoor Unit Base
2.1
1. Shock absorption bars (EPDM rubber, 5 mm
thick) need to be installed between the
ground and the base.
2. The base should be at least 250 mm in height.
3. You are advised to use angle steel, square
steel or channel steel. Width of 50 mm and
thickness of 3 mm to 5 mm is recommended.
4. When the width of angle steel is more than 50
mm, it is interfering with the cable routing
holes. Cut out the part on the angle steel to
avoid interfering. If the width is less than or
equal to 50 mm, skip this step.
NOTE
3Installing the Equipment
1. Read the related user manual or instructions before installing the NetCol5000-C.
2. The unit in this document is a fully configured NetCol5000-C. If some components are not
configured, skip the corresponding steps.
3. You are recommended to use tools that are fully insulated when installing devices.
4. Only engineers from the manufacturer or engineers certified by the agent are allowed to install,
commission, and maintain smart cooling products. Otherwise, personal injuries and device
damage may be caused, which is beyond the smart cooling product warranty range.
(1) Power cable hole, Φ 43mm
(2) Signal cable hole, Φ 43mm
Front door
(Top view of the top plate)
(Side view)
(Front view)
(Top view)
Making Holes on the Floor
2.2 Front door
(Top view of the bottom plate)
(1) Drainpipe hole, Φ 43 mm
(2) Humidifier water inlet pipe hole,
Φ 43 mm
(3) Ground cable hole , Φ 28 mm
(4) Chilled water outlet pipe hole,
Φ 54 mm
(5) Chilled water inlet pipe hole, Φ
54 mm
2
Engineering
Procurement
Cables
Power cable (3x2.5
mm²), teamwork networking and monitoring
cables, and equipotential cable (≥ 16 mm²)
Others
Indoor unit base, thermal insulation foam, and thermal insulation
foam glue

1. The equipment has been injected with
0.3–0.5 MPa of nitrogen before delivery.
If no nitrogen is discharged, contact
Huawei technical support.
2. You can open or close the exhaust valve
using a flat-head screwdriver.
Removing the Pallet
3.3
Slowly open the
exhaust valve to
release nitrogen
and close the valve
afterwards.
Removing Air Filters
3.1 Discharging Nitrogen
3.2
For single-cabinet and dual-cabinet packaging,
the methods for removing air filters are the same.
Take dual-cabinet packaging as an example.
Single-cabinet packagingDual-cabinet packaging
NOTE
3

Installing Cabinets Side by Side3.7Leveling the Cabinet3.6
Moving the cabinet
3.5
4
Removing the side plates
3.4
Force-bearing
beam
Force-bearing
beam
Four to six persons are required to move the
cabinet to the installation position. After that,
install the side plates.

4Installing Pipes
1. A 1:100 tilt should be reserved for the main drainpipe.
2. Keep a clearance of at least 25 mm between pipes. Secure the pipes to supports every a
certain distance.
3. Clean the water inlet engineering pipes to avoid impurities entering into the humidifier.
4. A reducing valve must be installed if the inlet water pressure exceeds 0.7 MPa.
5. Pipes should be wrapped with thermal insulation foam along the route.
Pipe Layout
4.1
5
(Only for 30 kW) Install the Air Baffle
3.10
(Only for 30 kW) Remove two
rodent-proof kits
3.9
Securing the Equipment3.8

Connecting the Humidifier Water Inlet Pipe
4.3
G 3/4 inch reserved
connector with outer
screw thread
G 3/4 inch adapter with
inner screw threadNote1
Matched with the adapter,
the pressure resistance
should be at least 0.7 MPa
6
BSPP 1/2inch reserved
connector with inner
screw thread
BSPT 1/2inch adapter
with outer screw
thread
Rigid pipe (PP-R
or C-PVC)
Connecting the Drainpipe
4.2
Unit: mm
Pipe support
Recommended:
Cable ties
Sheet metal
for fixing the
water inlet
pipe
Note 1:
1. When plastic materials such as PA66 are used, the
recommended torque is 5 N·m.
2. When metal materials are used, the recommended torque is 10
N·m. A sealing washer must be used when an union is used.

Connecting the Chilled Water Inlet and Outlet Pipes
4.4
(1)
Reserved
device
port
(2) Direct
connection of
external teeth
(3) Sealing ring
(4) Nut
(5) Aluminum
plastic pipe
(1) Reserved device
port
(2) Seamless steel
pipe
(Optional) Leakage Test with Nitrogen
4.5
•If the pressure has fallen, apply soapy water on the pipes, especially pipe joints, to check for
leakages. Rectify the leakages if any.
•If the pressure is stable, wrap all pipes and connectors with thermal insulation foam.
•Install a reducing valve on the outlet of the nitrogen cylinder. Its outlet pressure must not
exceed 0.8 MPa.
•In addition to the leakage test with nitrogen, there is the leakage test with water. You can
choose one test based on site requirements.
1. Rotate the chilled water valve to the maximum (100%).
2. Check that the needle and exhaust valves on the pipeline are closed.
3. Connect a reducing valve and a nitrogen cylinder at the needle valve position shown in the
figure, charge 0.8 MPa of nitrogen (when the pressure is stable), and leave them for 24
hours.
4. Check for pressure change after 24 hours.
Connecting the Seamless steel pipe
Aluminum plastic pipe
7

Injecting Water to Expel Nitrogen
4.6
1. Open the general water supply valve.
2. Press the button on the side of the actuator and
manually rotate the valve handle to the maximum in the
specified direction. Check that the chilled water valve is
in the open state (100%).
3. Slowly open the exhaust valve to let out gas.
4. Adjust the gas releasing speed until no gas flows out of
the valve. Then close the exhaust valve.
5. Manually close the chilled water valve.
(Optional) Leakage Test with Water
4.7
Manually open the chilled water valve. Inject water to 0.8 MPa, and preserve the pressure for 24
hours. Then connect a pressure gauge to a needle valve on the pipeline to measure the pressure.
If the reading remains unchanged, the pipe is not leaking. You can perform the following
operations.
Clean the main pipe beforehand to avoid blockage of the heat
exchanger due to foreign construction matter. Close the isolation
valve on the water inlet and outlet pipes before the cleaning.
If the leakage test has been done with nitrogen, skip the test with water.
8

1. Remove the cover of the electric control box.
3. Connect the power cable.
2. Connect the equipotential cable.
30kW 32kW
4. Install the cover of the electric control box.
9
5Installing Cables
1. When routing the cables, wrap the section of all signal cables inside the smart cooling
product with the corrugated pipes and route them out of the corresponding cable holes so
that the strong- and weak-current cables are separated.
2. Route the power cable along the rear door post, and use cable ties to secure the cable to the
post every 150–200 mm.
Connecting the Equipotential Ground Cable and Power Cable
5.1

(Optional) Installing a Differential Pressure Sensor
5.2
Connect a pressure inlet tube to the +mark and
route it to the aisle through the hole on the top of
the cabinet. Ensure that the pressure inlet faces
downwards. Connect another pressure inlet tube
to the –mark and route it to the cabinet top
through the hole atop.
Cold aisle
Hot aisle
Connect the cable terminal of the micro differential
pressure sensor to the DPT terminal.
Connect a pressure inlet tube to the +mark and
route it to the cabinet top through the hole atop.
Connect another pressure inlet tube to the –mark
and route it to the aisle through the hole on the top
of the cabinet. Ensure that the pressure inlet faces
downwards.
10
(Optional) Installing Water
Censor
5.3 (Optional) Installing T/H Sensors
Outside Cabinet
5.4