Gill 739120 User manual

739120
739120A
20' BALL STOP;
OFFSET POLE
Read all of the instructions before beginning. Make sure you have
all parts and tools you will need. Consult local codes and guidelines.
Local conditions may require a different procedure, the following
instructions should be considered recommended minimums.
CAUTION
- contact your local utility companies to locate burried
electrical, gas, and water lines
before
digging holes for footings.
Also check for overhead utilities.
ALWAYS LOWER NETS IN HIGH WIND STORMS
www.gillathletics.com
Copyright
2017 by Gill Athletics.
All rights reserved.
800-637-3090
2/17/2017
INST739120
Page 1 of 7
20' OFFSET BALL STOPS
ASSEMBLY INSTRUCTIONS

40"
2'-0"
5"
2'-0"
40"
SLEEVE ALIGNMENT HOLE
GROUND LEVEL
NET
ENSURE PROPER
STOP BOLT
ORIENTATION
2 1
2
"
1 1
2
"
1.
Locate and dig footings for each upright. Poles are set in ground sleeves.
Confirm all locations before setting.
Position and level gravel or a flat concrete pad in the bottom of the hole so
that the sleeve opening rests at the proper height at the surface.
Fix and support the sleeve in position with wire and/or sections of rebar to
prevent sleeve movement during the concrete pour.
During the pour, ensure the alignment holes at the top opening of the sleeve
remain properly aligned. These holes help orient the pole alignment pins at
the bottom of the sleeves.
The footer size is to be determined by the architect/engineer and is based on
local codes and soil conditions.
Concrete must be allowed to fully cure before continuing
NET ANCHOR PIERS:
1. Dig a 5" x 24" deep hole for each net
anchor pier. Piers should be placed 38" to 40"
in front of each net pole.
2. During the concrete pour for the ground
sleeves, fill each hole to within 1-1/2" of the
surface level. This will place the eyebolt
anchor point below the surface level so as not
to interfere with mowing.
3. After concrete has cured, drill a 1/2" x 2
1/2" deep hole in the center of the pier for the
stainless steel threaded anchor. Clean the
hole and insert the threaded anchor. Seat the
anchor with a 5/16" pin punch and install the
3/8" eyebolt.
www.gillathletics.com
Copyright
2017 by Gill Athletics.
All rights reserved.
800-637-3090
2/17/2017
INST739120
Page 2 of 7
20' OFFSET BALL STOPS
ASSEMBLY INSTRUCTIONS

If Net Anchor Piers are not used, move the net rope guide to
the through hole at the base of the pole. Secure the bottom
of the net and lower net cable to this eye nut and bolt.
OPTIONAL
www.gillathletics.com
Copyright
2017 by Gill Athletics.
All rights reserved.
800-637-3090
2/17/2017
INST739120
Page 3 of 7
20' OFFSET BALL STOPS
ASSEMBLY INSTRUCTIONS

HDWE012570E0
5/16" x
5.5"
BOLT
M1232
NOTE:
ROPE CLEAT CAN BE INSTALLED
ON EITHER SIDE OF POLE
DETERMINE LOCATION IN FIELD
CLEAT
M2244
NYLOCK NUT
TOP CAP
LOCKWASHER
HDWE53003000
HDWE012560E0
PCAP00158002
HDWE040010E0
M2591
HDWE53003000
HDWE012560E0
HDWE040010E0
M2591
FLATWASHER
LOCKWASHER
2.
Assemble the top cap, rope cleat, and eye nuts as shown
NOTE: THERE ARE 2 DIFFERENT BOLTS USED IN THIS STEP, 5.5" AND 5" LONG
USE THE 5.5" BOLT ON THE ROPE CLEAT
EYE NUT
FLATWASHER
5/16" x
5"
BOLT
EYE NUT
5/16" x
5"
BOLT
www.gillathletics.com
Copyright
2017 by Gill Athletics.
All rights reserved.
800-637-3090
2/17/2017
INST739120
Page 4 of 7
20' OFFSET BALL STOPS
ASSEMBLY INSTRUCTIONS

L
PULLEY
PULY00100
M2223
SNAP HOOK
3.
Attach the pulley.
www.gillathletics.com
Copyright
2017 by Gill Athletics.
All rights reserved.
800-637-3090
2/17/2017
INST739120
Page 5 of 7
20' OFFSET BALL STOPS
ASSEMBLY INSTRUCTIONS

M2123
BOTTOM
CABLE
M2223
SNAP HOOK
7"
ROPE000920E0
ROPE00083000
Cable is cut and clamped in field.
M2005
ROPE
M2123
TOP
CABLE
M2005
ROPE
M2223
SNAP HOOK
NET
4.
Feed the rope through the eye nut and pulley and tie in a
snap hook. Knots can be tied in the rope to keep it from
pulling out when raising or lowering the net. Extra rope will
wrap on the cleat.
Lay the nets flat on the ground. Cut and form the top cable.
Weave it in and out through every 5th opening just below the
edge of the net.
At each pole, hook both the net binding and top cable.
5.
Cut and form the bottom cable. Weave it in and out through every
5th opening just below the edge of the net. Secure to the anchor pier
eyebolt.
THIMBLE
ROPE CLAMP
NET
www.gillathletics.com
Copyright
2017 by Gill Athletics.
All rights reserved.
800-637-3090
2/17/2017
INST739120
Page 6 of 7
20' OFFSET BALL STOPS
ASSEMBLY INSTRUCTIONS

• INSPECT THIS EQUIPMENT FOR WEAR, LOOSE FITTINGS, DAMAGE AND PROPER STABILITY BEFORE EACH USE.
REPLACE DEFECTIVE OR WORN PARTS IMMEDIATELY. IF IN DOUBT, DO NOT USE THIS EQUIPMENT UNTIL REPAIRED.
• THE NETS SHOULD BE DISMANTLED AND STORED WHEN NOT BEING USED. STORE IN A CLEAN DRY AREA.
• PERIODICALLY CHECK AND RE-TENSION ALL CABLES
• INSPECT NETTING BEFORE EACH USE FOR ANY HOLES. IF NETTING IS WORN OR DAMAGED, STOP USING IT UNTIL IT
IS REPLACED OR REPAIRED.
• REGULARLY CHECK THE ENTIRE STRUCTURE FOR SIGNS OF CORROSION AND REPAINT WITH AN EXTERIOR GRADE,
RUST-RESISTANT ENAMEL.
GENERAL MAINTENANCE
• READ ALL CAUTIONS AND WARNINGS THOROUGHLY BEFORE USING THIS EQUIPMENT.
• READ ALL INSTRUCTIONS THOROUGHLY BEFORE ATTEMPTING TO ASSEMBLE THIS EQUIPMENT. ASSEMBLY
OF THIS EQUIPMENT MUST BE DONE BY PHYSICALLY CAPABLE ADULTS ONLY.
• FAILURE TO COMPLY WITH THE INSTRUCTIONS, MAINTENANCE, AND WARNINGS MAY RESULT IN SERIOUS INJURIES
AND/OR PROPERTY DAMAGE.
• WHILE IT CANNOT BE ELIMINATED, THE RISK OF INJURIES CAN BE GREATLY REDUCED BY FOLLOWING PROPER
SAFETY GUIDELINES AND PROVIDING PROPER MAINTENANCE AND SAFETY INSPECTIONS.
• BALL STOPS ARE DESIGNED TO PROVIDE LIMITED PROTECTION FOR SPECTATORS. HOWEVER, STRICT SAFETY
PRECAUTIONS AND ADULT SUPERVISION MUST BE OBSERVED AT ALL TIMES TO MINIMIZE THE POSSIBILITY OF
ACCIDENTAL INJURIES.
• SPECTATORS MUST BE INSTRUCTED TO STAND A SAFE DISTANCE FROM THE NETTING, TO AVOID THE POSSIBILITY
OF BODILY CONTACT WITH BALLS, OR OTHER EQUIPMENT.
• THE OWNER OF THIS EQUIPMENT IS RESPONSIBLE TO ENSURE THAT ALL INDIVIDUALS FOLLOW THESE SAFETY AND
OPERATING INSTRUCTIONS TO AVOID INJURIES OR PROPERTY DAMAGE. PROPER USE AND SUPERVISION OF THIS
EQUIPMENT IS ESSENTIAL TO HELP REDUCE THE POSSIBILITY OF ACCIDENTS OR INJURIES.
• DO NOT SUBSTITUTE FOR THE FACTORY-SUPPLIED CABLE, CABLE CLAMPS, AND HARDWARE.
• MAKE SURE NETTING DOESN'T CONTACT ANYTHING SOLID, SUCH AS A WALL OR CHAIN LINK FENCE.
• DO NOT ALLOW ANY INDIVIDUALS TO CLIMB POSTS OR NETS.
• USE EXTREME CAUTION WHEN WALKING AROUND THE BALL STOPS.
• NETS SHOULD ALWAYS BE LOWERED WHEN NOT IN USE AND
ESPECIALLY IN HIGH WIND
, SHOW, AND ICE STORMS.
• THIS WARNING IS GIVEN IN COMPLIANCE WITH CALIFORNIA’S PROPOSITION 65: WARNING THIS PRODUCT CONTAINS
CHEMICALS KNOWN TO THE STATE OF CALIFORNIA TO CAUSE CANCER, BIRTH DEFECTS OR OTHER REPRODUCTIVE
HARM.
WARNING
www.gillathletics.com
Copyright
2017 by Gill Athletics.
All rights reserved.
800-637-3090
2/17/2017
INST739120
Page 7 of 7
20' OFFSET BALL STOPS
ASSEMBLY INSTRUCTIONS
This manual suits for next models
1
Table of contents
Other Gill Accessories manuals




























