
The Ecosure Single IBC Bund must
be sited on a at, level base. For
installation guidance, please watch the
promotional video at ecosure.co.uk
• Always check the solution being
stored is suitable for MDPE.
• Ensure the outlet of your IBC faces
forwards, in line with the fork pockets.
• Your IBC pallet should be centrally
located on the IBC bund support
columns.
IBC POSITIONING
If your IBC has a wooden or plastic base you can site it directly on the support
columns as shown. If your IBC has a metal or combination base, you must have
a bund with grid
THANK YOU
Thank you for purchasing the Ecosure Single IBC Bund with Frame and Cover. We
trustyouwillbecompletelysatisedwithyourpurchase.Ifyouhaveanytechnical
enquiries, please call 01763 261781 option 3. This industrial strength product is
guaranteed frost-proof and is made from UV stabilised polymer.
A risk assessment should be carried out to ensure the product can be assembled
safely and with the correct PPE.
Tools required
• 8mm nut driver/spanner
• 6mm hex key
• Step ladder or other suitable working platform
DO NOT STAND ON IBC BUND
OR LEAN LADDER AGAINST FRAME
IMPORTANT SAFETY INSTRUCTIONS
b. Loosen the grub screws on the angle
brackets with a 6mm hex key and slide
all four of the angle brackets on top of
the vertical support bars.
IBC BUND WITH COVER INSTALLATION GUIDE
a. Using the self-tapping screws,
attach the four vertical support bars to
the four corners of the IBC Bund.
c. Push two support bars in to the
angle brackets, opposite each other.
e. Attach the roof supports between
the two bars - ensuring the widest part
is towards the front.
d. Push the remaining two bars in to the
angle brackets. Ensure all are squared
up and tighten the grub screws.
f. It is best to t the PVC cover from
back to front - ensuring it ts over all
four corners of the frame before using
the velcro fasteners. Then lower each
rolled door - secure using the zip.
It is recommended that two or more
people are used for this step.