Arista CloudVision DCA-100-CV User manual

DCA-100-CV Quick Start Guide

Copyright
SalesSupportHeadquarters
+1-408 547-5501+1-408 547-55025453 Great America Parkway, Santa Clara,
CA 95054 +1-866 497-0000+1-866 476-0000
Santa Clara, CA 95054
USA
+1-408 547-5500
mailto:[email protected]mailto:[email protected]http://www.arista.com
©Copyright 2020 Arista Networks, Inc. All rights reserved. The information contained herein is subject to
change without notice. The trademarks, logos and service marks ("Marks") displayed in this documentation are
the property of Arista Networks in the United States and other countries. Use of the Marks are subject to Arista
Networks™Term of Use Policy, available at http://www.arista.com/en/terms-of-use. Use of marks belonging
to other parties is for informational purposes only.
5

Contents
Chapter 1: Overview...................................................................................1
Scope............................................................................................................................................................1
Receiving and Inspecting the Equipment.....................................................................................................1
Installation Process.......................................................................................................................................1
Safety Information.........................................................................................................................................2
Supplemental Documentation.......................................................................................................................2
Obtaining Technical Assistance....................................................................................................................2
Specifications................................................................................................................................................2
Chapter 2: Preparation...............................................................................5
Site Selection................................................................................................................................................5
Electrostatic Discharge (ESD) Precautions..................................................................................................5
CloudVision Physical Appliance Setup.........................................................................................................6
Front Bezel....................................................................................................................................................6
Locate the MAC Addresses for the CloudVision Appliance..........................................................................7
Back Panel Ethernet Connections................................................................................................................7
DNS Entries..................................................................................................................................................8
CloudVision Appliance IP Configuration.......................................................................................................8
DHCP Based IP Address Setup...................................................................................................................9
Manual IP Address Setup.............................................................................................................................9
Chapter 3: Accessing the CloudVision Appliance.................................11
IPMI............................................................................................................................................................11
Web Access into IPMI.................................................................................................................................11
Web Access into CVX and CVP Consoles via WOK..................................................................................12
Using the CLI to Access the Appliance.......................................................................................................13
Changing the IPMI Password......................................................................................................................14
Chapter 4: Setting Up CV Applications...................................................17
Setting Up CVP...........................................................................................................................................17
Setup Steps for Single Node CVP..............................................................................................................17
Setup Steps for Multi-node CVP Cluster.....................................................................................................17
Log into the CVP Web Interface..................................................................................................................17
Appendix A: Status Indicators.................................................................19
LCD Panel Features....................................................................................................................................19
Power Supply Status Indicators..................................................................................................................20
AC Power Supply........................................................................................................................................20
Appendix B: Parts List.............................................................................23
Two-Post Rack Mount Parts........................................................................................................................23
Appendix C: Front Panel Features and Indicators.................................25
Appendix D: Back Panel Features and Indicators.................................27
Appendix E: Tools to Manage and Update Images................................29
Upgrade the CVP Image.............................................................................................................................29
Redeploy CVP VM Tool...............................................................................................................................29
Redeploy the CVX VM Tool.........................................................................................................................30
Upgrade the Host Image.............................................................................................................................31
Single-node configurations.........................................................................................................................31
iii

Multi-node configurations............................................................................................................................32
Steps to Upgrade the CVA..........................................................................................................................33
Appendix F: Host Console Access via IPMI...........................................35
Appendix G: SNMP Monitoring Support.................................................37
Appendix H: CloudVision Worksheet......................................................39
DCA-100-CV Quick Start Guideiv

Chapter 1
Overview
Scope
This guide is intended for properly trained service personnel and technicians who need to install the Arista
CloudVision appliance.
Note: Only qualified personnel should install, service, or replace this equipment.
Receiving and Inspecting the Equipment
Upon receiving the appliance, inspect the shipping boxes and record any external damage. Retain the packing
materials if you suspect that part of the shipment is damaged; the carrier may need to inspect them.
If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any accessories
that may be packaged in the same box as the main unit.
Inspect the packing list and confirm that you received all listed items. Compare the packing list with your purchase
order. The Appendix provides a list of components included with the appliance.
Installation Process
The following tasks are required to install and use the appliance:
1. Select and prepare the installation site.
2. Configure the CloudVision appliance.
Note: Ultimate disposal of this product should be in accordance with all applicable laws and regulations.
1

Safety Information
Refer to the Arista Networks document Safety Information and Translated Safety Warnings available at:
http://www.arista.com/support/docs.
Supplemental Documentation
Refer to the Arista EOS User manual or additional configuration requirements at
https://www.arista.com/en/support/product-documentation.
ObtainingTechnical Assistance
Any customer, partner, reseller or distributor holding a validArista Service Contract can obtain technical support
in any of the following ways:
•Email: http://[email protected]. This is the easiest way to create a new service request. Include a detailed
description of the problem and the output of "show tech-support".
•Web: http://www.arista.com/support.A support case may be created through the support portal on our website.
You may also download the most current software and documentation, as well as view FAQs, Knowledge Base
articles, Security Advisories, and Field Notices.
•Phone: 1+866-476-0000 or 1+408-547-5502.
Specifications
The following lists the specifications of theArista CloudVision Appliance.
Table 1: Appliance Specifications
Height: 42.8 mm (1.68 inch)
Width: With rack latches: 482.4 mm (18.99 inch)
Size (W x H x D)
Without rack latches: 434.0 mm (17.08 inch)
Depth (excludes bezel): 607.0 mm (23.9 inch)
Weight (maximum): 19.9 kg (43.87 lb)
Weight (empty); 16.73 kg (36.88 lb)
Weight
Continuous operation (for altitude less than 950 m or 3117 ft):
10°C to 35°C (50°F to 95°F) with no direct sunlight on the equipment.
Maximumtemperaturegradient(operatingand storage): 20°C/h
(36°F/h)
Operating Temperature
–40°C to 65°C (–40°F to 149°F)Storage Temperature
3048 m (10,000 ft).Operating Altitude
DCA-100-CV Quick Start Guide
2

10% to 80% Relative Humidity with 29°C (84.2°F) maximum
dew point.
Relative Humidity
550 WPower Input (AC Power)
550 W (Platinum)AC (100–240 V, 50/60 Hz, 7.4A-3.7 A)Power Draw
(Typical / Maximum)
3
Overview


Chapter 2
Preparation
Site Selection
Read the safety instructions in your Safety, Environmental, and Regulatory Information booklet before
you begin.
The following criteria should be considered when selecting a site to install the appliance:
•Before you begin, review the safety instructions located at http://www.arista.com/support/product-documentation.
• Begin installing the rails in the allotted space that is closest to the bottom of the rack enclosure.
•Other Requirements: Select a site where liquids or objects cannot fall onto the equipment and
foreign objects are not drawn into the ventilation holes. Verify these guidelines are met:
• Clearance areas to the front and rear panels allow for unrestricted cabling.
• All front and rear panel indicators can be easily read.
• Power cords can reach from the power outlet to the connector on the rear panel.
Note: Important! All power connections must be removed to de-energize the unit.
Note: Important! This unit is intended for installation in restricted access areas.
Electrostatic Discharge (ESD) Precautions
Observe these guidelines to avoid ESD damage when installing or servicing the appliance.
• Assemble or disassemble equipment only in a static-free work area.
• Use a conductive work surface (such as an anti-static mat) to dissipate static charge.
• Wear a conductive wrist strap to dissipate static charge accumulation.
• Minimize handling of assemblies and components.
• Keep replacement parts in their original static-free packaging.
• Remove all plastic, foam, vinyl, paper, and other static-generating materials from the work area.
• Use tools that do not create ESD.
5

CloudVision Physical Appliance Setup
You may need the following items to perform the procedures in this section:
• Key to the system key-lock.
• #1 and #2 Phillips screwdriver.
• Wrist grounding strap connected to ground.
• Rack mount kit instructions located in the shipping box.
Front Bezel
Removing the front bezel
1. Unlock the key-lock at the left end of the bezel. (2)
2. Lift the release latch next to the keylock. (3)
3. Rotate the left end of the bezel away from the front panel. (4)
4. Unhook the right end of the bezel and pull the bezel away from the system.
Figure 1: Removing and Installing the Front Bezel
Table 2: Removing and Installing the Front Bezel
Legend
Release Latch1
Key-lock2
Front Bezel3
DCA-100-CV Quick Start Guide
6
Table of contents
Other Arista Network Hardware manuals

Arista
Arista CCA-ETM-Q6E User manual

Arista
Arista 7800 Series User manual

Arista
Arista 5000 Series User manual

Arista
Arista DCA-NDR-S100MB User manual

Arista
Arista CCA-ETM-Q12 User manual

Arista
Arista CCA-ETM-Q8W User manual

Arista
Arista CCA-ETM-Q8 User manual

Arista
Arista CloudVision DCA-CV-100 User manual

Arista
Arista CCA-ETM-Q6 User manual

Arista
Arista CCA-ETM-Q20 User manual
Popular Network Hardware manuals by other brands

Matrix Switch Corporation
Matrix Switch Corporation MSC-HD161DEL product manual

B&B Electronics
B&B Electronics ZXT9-IO-222R2 product manual

Yudor
Yudor YDS-16 user manual

D-Link
D-Link ShareCenter DNS-320L datasheet

Samsung
Samsung ES1642dc Hardware user manual

Honeywell Home
Honeywell Home LTEM-PV Installation and setup guide












