American Eagle Goals RM54 User manual

April 10, 2018
PRO SERIES
Installation Instructions - RM54, RM60, RM72
American Eagle Goals - Customer Service!
Phone: 1-844-422-4625!
2017 AEGoals
Pro Series Rear Mounted Actuator
1

April 10, 2018
SAFETY INSTRUCTIONS
2017 AEGoals
Pro Series Rear Mounted Actuator
2
Before digging for the anchor system, contact
your local One-Call center in your area by
dialing (811) for underground utility locates.!
Owner must ensure that all players know and comply
with these rules for safe operation of the system. !
•Only hang from the rim briefly to regain balance
and/or injuring others. Release the rim as soon as
safely possible to prevent possible damage.!
•Do not wear jewelry (watches, rings, necklaces etc.)
Items may entangle in net or injure another player.!
•Players must wear a mouthguard to prevent injury.!
•During play keep players’ faces away from the rim,
net and backboard. Serious injury could result if
face/teeth come in contact with rim, net and/or
backboard, especially during dunking activities.!
•When making height adjustments, keep hands and
fingers clear of moving parts. Do not allow children
to adjust the system height.!
•Do not climb and/or hang on system components.
The product is not designed to be used in this
manner and property/personal injury could result.!
•Routinely check the system for loose hardware and
chipped paint. Remove surface rust and touchup
as needed with an exterior enamel paint.!
•Keep water and organic material (mulch, grass, dirt
etc.) away from the base of the pole.!
Most injuries are caused by misuse and/or not
complying with rules and instructions.!
Use caution when using this system
•To avoid severe injury or death, do not locate this
system under power lines that could potentially
come in contact with it when being raised.!
•Do not install in an area with overhead power lines
located within a 20’ radius of the goal location.!
•Two or more people in good physical condition and
more than capable of lifting at least 100 pounds
each are recommended for safe installation.!
•Follow all warnings and comply with all weight
restrictions listed on all ladders used during the
installation process. Use extreme caution.!
•Understand and follow all warnings and instructions
for all digging equipment used when setting the
anchor. i.e. augers, post hole diggers etc.!
•Installation and assembly of this product will require
bending, heavy lifting/carrying and that can lead to
injury. Exercise caution during assembly.

April 10, 2018
INSTALLATION TIMELINE
DAY 1: Install anchor system as per the instructions below.
Day 2-4: Allow the concrete to cure. *Cooler temperatures may require additional cure time.
Day 5: Complete assembly and installation of the system as per the instructions below.
Anchor System Installation Instructions (Day 1)
Step 1 - Assemble Anchor
2017 AEGoals
Pro Series Rear Mounted Actuator
3
Items required for anchor installation - not included!
11+/- 80 lb. bags of concrete!
1 - Post hole digger or gas powered auger !
1 - Shovel !
1 - Mixing hoe!
2 - 1 1/8” Open end wrenches or adjustable
wrenches!
1 - Wheel barrow!
1 - Garden hose!
1 - Level!
1 - Tape measure!
1 - Concrete form (see note below)!
3 - 36” long pieces of #40 reinforcement bar
Locate and assemble the (#1) 9” x 9” bolt pattern
anchor kit as shown in the diagram using the supplied
hardware located within the anchor box.!
Item#Description !
1#Pro Series 9” x 9” bolt pattern template!
2#L-Bolt - (4) required!
3#3/4” Nut - (12) required!
4#3/4” Flat Washer - (8) required!
5#*Baseplate portion of the pole.!
*The (#5) baseplate portion of the pole is shown to
illustrate the final assembly of the pole and anchor.
The pole is not required to set the anchor.
NOTE:
ALLOW 3" OF THREAD
ABOVE 1st NUT
LOCATED BELOW
TEMPLETE AS
SHOWN
DETAIL# 18
ASSEMBLING
GROUND KIT
2
33
44
3
1
5
TEMPLETE
1st-NUT
HARDWARE IS THE SAME
FOR ALL FOUR SIDES
NUMBERED AS SHOWN.
Diagram 1

April 10, 2018
Step 1 - Continued
!
2017 AEGoals
Pro Series Rear Mounted Actuator
4
The upper set of (#3) nuts and (#4) washers can
be hand threaded onto the (#2) L-Bolts to
prevent them from being lost.!
•Thread the 1st (#3) nut onto each of the four
(#2) L-Bolts leaving 3” of the thread exposed
above the (#3) nut as illustrated in Diagram 2.!
•Insert each (#2) L-Bolt into the (#1) template
and secure with (#3) nuts as shown in
Diagram 1 on the previous page. Tighten the
top (#3) nut to prevent the bolts from moving.!
•The remaining hardware is not necessary at
this point and can be placed on the
(#2) L-Bolts above the (#1) template to prevent
them from being lost.
Diagram 2

April 10, 2018
Step 2 - Dig the Hole
Step 3 - Mix the Concrete
2017 AEGoals
Pro Series Rear Mounted Actuator
5
•Before you dig confirm that all underground
utilities have been marked and that you
understand the markings.!
•Irrigation lines, invisible fence wires etc. are
not considered an underground utility and will
not be marked by the (811) technician.!
•Determine your hole location keeping in mind
the overhang of the backboard in relationship
to the face of the pole and the overall playing
area of your driveway or slab.!
•Dig a square hole that measures at least 48”
deep with a diameter of at least 16 inches
and is square with the driveway/slab and/or
playing area. *Keep in mind the top of the
anchor (#1) template should be set level with
the playing surface to ensure the rim will
reach the regulation 10’ playing height.!
Note: A cardboard concrete form or one
constructed out of 2 x 4 lumber is
recommended for the top 4” of the hole as it
provides a nice finished product, aids in
squaring the anchor system with the driveway/
slab and/or playing area and provides a
reference point for the top of the template in
relationship to the playing surface. !
20.00 DIAMETER
48.00
REBAR # 40
16.00 DIAMETER
CONCRETE
COURT LEVEL
FIGURE 1
AEB ANCHOR SYSTEM INSTALLATION
•Put concrete in the wheel barrow and add water per the instructions on the bag. Working
quickly, thoroughly mix the concrete with the hoe. You’ll want the concrete to be the
consistency of thick gravy.!
•Insert the #40 reinforcement bar pushing each stick to the bottom of the hole after a couple of
bags of concrete have been mixed and placed in the hole. !
•Working quickly, continue to mix and add concrete until the hole is filled to the top of the
cardboard or wooden form. *You must work quickly as the concrete has the potential to
setup before you have an opportunity to insert the anchor into the wet concrete as
detailed in Step 4.!
Note: Wet concrete has the potential to setup very quickly depending on several conditions.
These conditions include but are not limited to: !
•Air temperature, humidity and the exposure to direct sunlight.
Diagram 3

April 10, 2018
Step 4 - Insert the Anchor
Allow the Concrete to Cure (Day 2 - 4)
Assembly and Installation (Day 5)
Step 1 - Prepare the Anchor
2017 AEGoals
Pro Series Rear Mounted Actuator
6
•Allow the concrete to cure a minimum of 72 hours.!
•Cooler temperatures may require additional cure time.
Tools required for assembly!
1 - Level!
1 - 1 1/8” Open end wrench or adjustable wrench!
1 - Tape measure!
2 - 3/4” Open end wrenches or ratchet & socket!
1 - 9/16” Open end wrench!
1 - 9/16” Socket & ratchet or additional wrench!
1 - 8’ Step ladder or Telescopic folding ladder - Preferred !
1 - Can of spray adhesive - Optional !
*Spray adhesive can be found at many hardware stores. (Loctite Brand or 3M)!
Note: Do not use an impact gun on stainless steel hardware. !
*A small tube of LocTite thread locker is located in a hardware bag in the hardware box and is
intended to be used on only the bolts requiring a split lock washer and finish nut. !
•Remove the (#3) nuts, (#4) washers and the (#1) template from the (#2) L-Bolts leaving the four
(#3) nuts that are located below the (#1) template as they will be forever embedded in concrete.!
•Thread one (#3) nut all the way down on to each (#2) L-Bolt resting against the nuts embedded
in the concrete.!
•Lay a level across each pair of (#3) nuts leveling them from front-to-back and left-to-right.!
•Place a (#4) washer on top of each (#3) nut after leveling.!
•Set the remaining four (#3) nuts and (#4) washers aside.

April 10, 2018
Step 2 - Pole Assembly - Jack Plates"
2017 AEGoals
Pro Series Rear Mounted Actuator
7
•Position the pole box in front of the anchor with the base plate nearest the anchor.!
•Open the box and rotate the pole until the jack attachment brackets are facing up.!
•Attach the jack ears to the jack brackets on the pole with two (#20) hex head bolts, four (#13) flat
washers, two (#32) split lock washers and two (#21) finish nuts per jack ear as shown below in
Diagram 4. Apply a small amount LocTite to the threads of the (#20) hex head bolts just before
threading on the (#21) finish nuts.
20 13 5 13
3232
21 13 20
2013
13 21
20 13 5
1 SET OF HARDWARE IS NOT SHOWN FOR CLARITY
Diagram 4

April 10, 2018
Step 3 - Pole Assembly - Lower Arm
2017 AEGoals
Pro Series Rear Mounted Actuator
8
With the jack ears still facing up, position the base plate of the pole inline with the anchor and up
against the front set of anchor bolts. Prop the pole up on a padded saw horse or a folding ladder
as shown in Diagram 5 to complete the following.!
Note: It is very important that the installer understands the importance of the bushing assembly. A
properly assembled bushing will not only protect the painted parts during adjustment, but will
provide a smooth and quiet operating system.!
•Attach the lower Y-arm to the pole as shown in Diagram 5 using one (#17) bolt, one (#9)
stainless washer, two (#8) ABS washers, one (#10) stainless steel tube and one (#11) white nylon
tube per side of the lower arm.!
Note: Do not fully tighten the (#17) bolts at this time. These bolts will be tightened once the jack
has been attached to the rear portion of the arm in (Step 6).
17
9
8
10
11
DETAIL #7
LOWER ARM TO POLE
8
11
10
8
9
17
#8 ABS WASHERS, ARE
TO BE PLACED
IN BETWEEN AS
SHOWN
NOTE: ATTACH THIS HOLE OF
THE Y- (LOWER) ARM
TO THE POLE AS SHOWN.
8

April 10, 2018
Step 4 - Pole Assembly - Upper Arms
2017 AEGoals
Pro Series Rear Mounted Actuator
9
•Attach the upper arms to the pole as shown in Diagram 6 using one (#18) bolt, two (#9)
stainless steel washers, four (#8) ABS washers, two (#25) gray nylon tubes, one (#33) split lock
washer and one (#19) finish nut. Apply a small amount LocTite to the threads of the (#18) hex
head bolt just before threading on the (#19) nut. Tighten bolt snug, but do not over tighten.
19
33
98
258
8258918
UPPER ARM
Diagram 6

April 10, 2018
Step 5 - Pole Assembly - Lower Jack Attachment
2017 AEGoals
Pro Series Rear Mounted Actuator
10
•Locate and unwrap the jack leaving the plastic zip tie intact.!
•Attach the (#22) handle to the (#6) jack with (#23) retainer clip. Turn the handle 10-12 revolutions
partially extending the jack.!
•Attach the (#6) jack to the (#5) jack ears using one (#16) bolt, one (#9) stainless washer, one
(#25) gray nylon tube, and 2 (#8) ABS washers per side of the jack as shown in Diagram 7.!
*Experienced Installer Tip: When attaching the jack to the jack ears it helps to first insert the (#25)
gray nylon tube into the (#5) jack ear centering it on the ear. Apply a small amount of spray
adhesive to the smooth side of the (#8) ABS washers and slide them over the (#25) gray nylon
tube adhering them to the (#5) jack ears. This will prevent the (#8) ABS washers from getting
jostled offof the (#25) gray nylon tubes during assembly.!
•Rest the top of the (#6) jack on the pole protecting the painted surface with a small piece of
packing foam or cardboard. You may fully tighten the (#16) bolts at this time.
Diagram 7
This manual suits for next models
2
Table of contents

















