UltraLift SPARTAN User manual

PRODUCT MANUAL
SPARTAN
CEILING TILT TV LIFT

2
TABLE OF CONTENTS
SPARTAN
PRODUCT DIAGRAM ............................................................................................................................................................ 3
PRE-INSTALLATION............................................................................................................................................................... 6
INSTALLATION: METHOD 1 .................................................................................................................................................. 7
INSTALLATION: METHOD 2 .................................................................................................................................................. 9
POST-INSTALLATION: ......................................................................................................................................................... 11
CABLE MANAGEMENT........................................................................................................................................................ 13
MOUNTING THE TV ............................................................................................................................................................ 15
WIRING DIAGRAM.............................................................................................................................................................. 17
OPERATION ........................................................................................................................................................................ 18
OPERATION: AUTOMATION............................................................................................................................................... 19
TROUBLESHOOTING ........................................................................................................................................................... 21
WARRANTY AND RETURNS ................................................................................................................................................ 22
MOVING PARTS
Do not obstruct operation of mechanism with fingers or any object. Injury or damage could
result. If adjusting the limits, do so prior to wiring into control systems.
RISK OF ELECTROCUTION
Do not connect any power to the lift until installation is complete.
Attach the display panel after the lift has been properly installed and tested.
WEAR PROTECTIVE EYEWEAR
During installation, this product, or parts of it may move in unexpected ways.
Always wear protective eyewear to ensure safety.
BE PREPARED
Organise your mounting hardware and have the necessary tools readily accessible be-fore
installation.
NOTE
Do not expose to extreme temperatures or corrosive materials.
Minimize exposure to the elements. This will void your warranty and reduce the life of the
product.

3
PRODUCT DIAGRAM
SPARTAN
PRODUCT DIAGRAM
SIDE TRIM PANELS
SCREEN HANGING RAILS
CEILING CLOSURE PANEL
LID CLOSURE PANEL
REMOVABLE ACCESS PANEL
(CONTROL BOX IS ON THIS SIDE)

4
PRODUCT DIAGRAM
SPARTAN
A
A
LENGTH
W IDTH
B
PLASTER CEILING
(LENGTH/3) - 120
DEPTH
LENGTH - 160
C
D
10
or
13

5
PRODUCT DIAGRAM
SPARTAN
E
SECTION
A-A
93
63
DETAIL
B
12MM MOUNTING
POINT
3
ULTRALIFT CEILING
PANEL
12
REAR PANEL
GAP
DETAIL
E
AREA TO BE
PLASTERED
3
FRONT
PANEL GAP
5
SIDE
PANEL GAP
DETAIL
C
5
SIDE
PANEL GAP
12
REAR
PANEL GAP
DETAIL
D

6
PRE-INSTALLATION
SPARTAN
PRE-INSTALLATION
BEFORE INSTALL:
•When choosing your lift, keep in mind variances of the display panel size due to things like speakers on
the side, top or bottom. These can increase the size of the lift that you will need. Check that the screen is
not larger than the maximum screen size allowed.
•Check above the ceiling for obstructions (i.e., water pipes, cables, and duct work) before beginning
installation.
•After establishing the correct location for the lift and display panel, cut a hole in the ceiling at the size
listed on the following page.
•Organise a qualified trades person to frame up the roof to accommodate the Spartan so that it can be
mounted in the correct position.
•Route AV cables from the source to the roof location where the Lift will be in-stalled.
•Ensure that a double power point has been installed in the roof (or where suit-able) so that the Lift and
display panel can receive power.
•Before mounting the display panel to the Lift, ensure that it will suit the Lift in relation to dimensions,
loading capacity and functionality.
•Read instructions completely before proceeding. Follow instructions carefully. Installation contrary to
instructions invalidates warranty.
CAUTION
•Do not obstruct operation of lift with fingers or any object. Injury or damage could result.
•Check above the ceiling for obstructions (i.e., water pipers, cable, and duct work) before beginning
installation.
•Do not connect any power to the lift until installation is complete
•Attach the display panel only after the lift has been properly installed and tested.
•Unit operates on a 240V with a current draw of 1A and a 6.5mA standby.
•If adjusting the limits, do so prior to wiring into control systems.
•Organise your mounting hardware and have the necessary tools readily accessible before installation.
CHOOSE AN INSTALLATION METHOD:
METHOD ONE:
Installing into Ceiling Cavity with Side Coash Screws
In this method, the unit is secured in place using coach screws on the sides of the frame and through
supporting timber (steel) beams.
METHOD TWO:
Installing into Ceiling Cavity with Top Hanging Bolts
In this method, the unit is secured in place using all-thread bolt or DynaBolt and from the top side of
the frame.

7
INSTALLATION: METHOD 1
SPARTAN
INSTALLATION: METHOD 1
SECURING WITH COACH SCREWS
1. Mark out the ceiling cut-out as per minimum hole dimensions below. Please refer to the size table on
pages 6. Cut out the hole for lift to fit through.
2. Frame up the ceiling joists and timber frame using a qualified tradesperson.
3. Route the Audio-Visual cables to the lift position in the ceiling. See the Cable Management instructions to
be followed post install.
4. A double power point is required in the ceiling to power the Spartan and the display panel.
NOTE: Access to the power point in the ceiling is advisable.
5. Power the Spartan unit on the ground (using the Wiring Instructions) and open the screen tilt to
approximately 90°. (Enough for access to the roof panel and the inner section.)
6. Remove the side Trim Panels to allow access to the mounting holes.

8
INSTALLATION: METHOD 1
SPARTAN
7. Raise the Spartan unit into the pre-cut hole from the underside into position and line up with the pre-built
timber frame.
8. Ensure the bottom of the unit is flush with the ceiling plaster.
9. Secure the unit in place using the coach screws and through the mounting holes.
NOTE
Ensure the supporting timber frames are in parallel. When using this method of installation,
the lift’s frame can be pushed out of square if the screws are not tightened equally or the
supporting frames are not in parallel.
A
DETAIL
A
TIMBER FRAME
CEILING PLASTER
POSITION FRAME SUCH THAT
TRIM PANEL IS FLUSH WITH
CEILING PLASTER
COACH SCREWS, F IX TO
TIMBER FRAME

9
INSTALLATION: METHOD 2
SPARTAN
INSTALLATION: METHOD 2
SECURING WITH TOP HANGING BOLTS
1. Mark out the ceiling cut-out as per minimum hole dimensions below. Please refer to the size table on
pages 6. Cut out the hole for lift to fit through.
2. Route the Audio-Visual cables to the lift position in the ceiling. See the Cable Management instructions to
be followed post install.
3. A double power point is required in the ceiling to power the Spartan and the display panel.
NOTE: Access to the power point in the ceiling is advisable.
4. Raise the Spartan unit into the pre-cut hole from the underside into position.
5. Ensure the bottom of the unit is flush with the ceiling plaster.
6. Secure the unit in place using bolts and through the mounting holes.

10
INSTALLATION: METHOD 2
SPARTAN
FRAME WIDTH -186MM
FRAME DEPTH - 126MM
AA
4 x ROOF MOUNTING PLATES
B
SECTION
A-A
DETAIL
B
ALLTHREAD OPTION
LOCKING
NUTS
ALLTHREAD
DYNABOLT OPTION
Table of contents

















