Trueline Distribution Fig.652 Instruction Manual

Fig.652 Installation & Maintenance Manual
1
Trueline Distribution
20201 Clark Graham, Baie D’Urfé,
H9X 3T5 CANADA
P. : (514) 457-5777 T.F. : (800) 667-4819
F. : (514) 457-1348
General Information:
•Toprovideanoptimumservicelife,thevalveshouldbeoperatedonlyinitsfully
openorfullycloseposition.Ifthevalveisusedinpartlyopen(throttled)
position,seatlifemaybereduced.
•Extendingthehandleleverisconsideredmisuseandcandamagethevalveor
causeinjuries.
•Thevalvebodyratingcanbehigherthantheseatrating.
•Highviscousorabrasivemedia,frequentoperationandtemperature
fluctuationscouldcauseanincreaseinvalvetorque.
•Valvepressurevariesunderdifferentmodels,sizes,workingtemperaturesand
materials.Pleaseverifytheapplicationwithinthelimitsspecifiedhereinandas
describedonmetalplatespotweldedonvalvebody.Referencescontainedin
thisdocumentstothe‘PED”areinregardstoEuropeanPressureEquipment
Directive97/23EC.
•AlwaysuseTruelinerecommendedsparepartsformaintenanceand
replacement.
Shipping and Storage:
Allvalvesarepackedinstrongcardboardsandplasticbagstoavoidanypossible
damageduringtransportation.Allthevalvesmustbeexaminedonreception,toensure
thattheyhavenotsufferedanydamagesduringtransport,andthesuppliermustbe
informedofanydamagesobserved.Iftheitemsarenotforimmediateuse,please
followthefollowinginstructions:
1. Leavethevalvesinfullyopenposition.Neverleavethevalveinapartiallyopen
position.
2. Alwayskeeptheprotectivecoversinplaceuntilthevalveisreadyfor
installation.
3. Thevalvesshouldnotbeunpackeduntiltheyaretobedefinitivelyinstalled,
exceptforpurposeofinspection.Afterinspectiontheywillbepackedagain.
4. Thevalvesshouldbestoredundercoverandprotectedfromsevereweather
conditionsandforeignbodies.
5. Stainlesssteelballvalvesdonotneedanyadditionalprotectioncoatingsonce
theyareinstalled.
6. ValvestobestoredforalongperiodoftimeshouldbeinspectedbyQC
personneleverysixmonthsandeverythreemonthsforautomatedvalves.

Fig.652 Installation & Maintenance Manual
2
Trueline Distribution
20201 Clark Graham, Baie D’Urfé,
H9X 3T5 CANADA
P. : (514) 457-5777 T.F. : (800) 667-4819
F. : (514) 457-1348
General Installation Step:
Thehandlingandtransportingofthevalvesmustbecarriedoutwithextreme
precautionandusingthenecessary&adequatemeansonthebasisoftheirsizeand
weight,avoidinganyriskstothepersonthathandlethem.
1. Valvepressurevariesunderdifferentvalveseries,sizes,applicationtemperature
andthematerialofthemainparts.Pleaseverifytheapplicationwithinthelimits
andasdescribedonthevalvebody.
2. Priortoinstallation,pleasemakesurethevalveisfreefromdirtandother
foreignmaterialsthatcoulddamagethevalveseats,asthesepartsare
fundamentaltothecorrectoperationofthevalve.
3. Itmightbenecessarytoflushtheballvalve,valvecavityandthepipestoremove
theaccumulateddirtandburrs.
4. Valvesshouldbeoperatedforatleasttwocompletecyclesbeforethe
installationtothepipe.Allthemultiportballvalveshaveavisualindicator
engravedonthevalvestem.Makesurethevalveportconfigurationcomplywith
theflowarrangementofthepipe.
5. Useanypipesealantsuitableforthematerialandtheprocessthatthevalveis
installedin.Don’tusethesealanttooexcessivelytoavoidtheobstructionin
valveoperation.
6. Alwaysleaktestthesystembeforeusing.
Installation Step for Screwed End:
1. Keepthevalveinopenposition.
2. Checkthevalvethreadsandthethreadsoftheconnectingpipeandmakesure
thesearefreefromdirt,gritorburrs.
3. Useananti‐seizethreadsealanttosealandpreventgalling.Taperthreaded
fittingsshouldnotbeovertightened.
4. Whentighteningvalve,useawrenchontheendnearesttothepipe.
Installation Step for SW/BW End:
1. Tackweldthevalve(inopenposition)endcapstothepipesatthreepoints.
2. Loosen&separatetheendcapsfromthebody.Removetheseatandsealand
setasideinthecleanandsecuredareaforreassemblylater.
3. Weldcompletelytheendcapstothepipes.Allowenoughtimeforcoolingthe
weldedjoints.Removetheremnantfromtheendcapsandpipes.
4. Putbacktheseatsandreassembletheendcapstothebodyaccordingtothe
BoltTorqueSpecifications.

Fig.652 Installation & Maintenance Manual
3
Trueline Distribution
20201 Clark Graham, Baie D’Urfé,
H9X 3T5 CANADA
P. : (514) 457-5777 T.F. : (800) 667-4819
F. : (514) 457-1348
Preventive Maintenance:
Preventivemaintenanceoperationsessentiallyconsistofperiodicinspectionsto
ensurethatthevalveisworkingproperly.
1. Thevalvemustbeopenedandclosedatleastonceeverysixmonths.Theuser
willberesponsibleforestablishingopeningandclosingplansthatareadequate
fortheworkingconditionsandfluidsused.
2. Beforemakingthemaintenance,alwaysmakesurethepressureisreleasedand
thelinehasbeenclosed.
3. Wearprotectiveclothingadequateforthecirculatingfluid.(Complywiththe
safetyguidelineslaiddownbythecompany).
4. Ifleakagehappensatthestem,tightenthestemnutaquarterturnasaroutine
maintenanceprocedure.Thiswillcompensateforanywearingorsettlingofthe
glandpacking.
5. Don’tovertightenthestemnut.Itwillcauseinexcessiveoperatingtorqueand
shortenthelifeofthepackingservice.Ifleakagepersists,depressurizethevalve
andreplacethestempacking.
6. Ifleakageisdetectedinthebodyseal,tightenthebodyconnectorbolts.Ifthe
leakagestilloccurs,thiswillbeduetothedamagedseal.Thevalveneedstobe
dismantledforrepairs.
Disassembly:
1. Makesuretheinstallationisnotunderpressure.
2. Loosenallbodyboltsorscrewsandremovethebodyfromtheline.Ifthe
circulatingfluidisnoxiousorinflammableprecautionsmustbetakentoavoid
accidents.
3. Removeanddiscardtheseatsandbodyseals.Removetheballandcheckthe
exteriorsurfaceoftheball,particularlytheareaincontactwiththeseatandthe
radiusortransitionbetweentheexteriorsurfaceandthebore.Iftheball’s
surfaceisdamagedreplaceitwithanewone.
4. Removethehandlesubassembly(handlenut,handle,stemnut,tabwasher,and
glandbushing).Placeallcomponentsincleanandsecuredarea.
5. Pushdownthestemintostuffingboxanddiscardthestempacking,O‐Ring,
thrustwasher.Becarefulnottoscratchornickthestempackingareaofthe
stuffingboxarea.

Fig.652 Installation & Maintenance Manual
4
Trueline Distribution
20201 Clark Graham, Baie D’Urfé,
H9X 3T5 CANADA
P. : (514) 457-5777 T.F. : (800) 667-4819
F. : (514) 457-1348
Assembly:
1. Cleaneachcomponentwithacleancloth.
2. Lubricatethethrustwasherandstempacking.Insertthestemintothestemport
ofthevalvebody.Placethethreadedendperpendiculartocenterlineofthe
body.
3. Holdthestemupandinsertthethrustwasher,O‐Ring,Stempacking,gland
packing,tabwasherandgland(stem)nut.
4. Tightenthestemnutaccordingtothetorquespecificationstatedinthismanual.
5. Inserttabwasher,handleandhandlenut.Tightenthehandlenut.
6. Bringthehandletoclosepositionandinserttheballandmakesureitengages
withthestem.
7. Movethehandleinopenpositiontopreventballfromfallingout.
8. Placetheballseatandbodysealintothebodyandinstallthebodyboltsand
nuts.Tightenthebodyboltsaccordingtothetorquespecifications.
9. Cyclethevalveseveraltimestoverifythefreeoperationofthevalve.
Table of contents
Popular Control Unit manuals by other brands

Festo
Festo Compact Performance CP-FB6-E Brief description

Elo TouchSystems
Elo TouchSystems DMS-SA19P-EXTME Quick installation guide

JS Automation
JS Automation MPC3034A user manual

JAUDT
JAUDT SW GII 6406 Series Translation of the original operating instructions

Spektrum
Spektrum Air Module System manual

BOC Edwards
BOC Edwards Q Series instruction manual

KHADAS
KHADAS BT Magic quick start

Etherma
Etherma eNEXHO-IL Assembly and operating instructions

PMFoundations
PMFoundations Attenuverter Assembly guide

GEA
GEA VARIVENT Operating instruction

Walther Systemtechnik
Walther Systemtechnik VMS-05 Assembly instructions

Altronix
Altronix LINQ8PD Installation and programming manual





