Part 4. Installation
·Do not try to assemble and install the wind generator on rainy days.
1. The three insulated power output transmission wires are installed inside the steel pole
mounting tower. The upper ends come out through the center hole of the wind generator
flange, while the bottom ends come out from a 12mm hole drilled about 30cm above the
ground. The section of wire from the bottom opening to a point which is 60cm beneath
ground should be protected by heavy duty conduit of diameter 17mm to 21mm.
All underground transmission lines to the controller must be correctly installed in heavy
duty orange conduit, buried 600mm deep.
2. The installation sequence of the wind generators can follow the steps as illustrated in
figure 3.
2-1. Place the steel bracket on the ground; block up the flange joint to 1.3m.
2-2. Align the wind generator flange with the tower flange. Cut away insulating layer of
current transmission wire end (which are to be connected with controller) for 10mm,
then short circuit the exposed copper wires (screw them together)
3. The lifting of the wind generator and tower should be undertaken by experienced
personnel, with the presence of a skilled slinger, and all safety procedures being followed.
The tower’s erection should be executed according to the requirements of permanent and
stable construction techniques.