
1 Note on this Manual
1.1 Scope of Validity
This manual is an integral part of SE-BAT Series. It describes the assembly,
installation, commissioning, maintenance and failure of the product. Please read
it carefully before operating.
SE-BAT SYS-HV
1.2 Target Group
This manual is for qualied ele tricians. The tasks described in this manual may
only be performed by qualied ele tricians.
1.3 Symbols Used
The following types of safety instructions and general information appear in this
document described as below:
DANGER!
“DANGER” indicates a hazardous situation which, if not avoided,
will result in death or serious injury.
WARNING!
“WARNING” indicates a hazardous situation which, if not avoided,
could result in death or serious injury.
CAUTIOIN!
“CAUTION” indicates a hazardous situation which, if not avoided,
could result in minor or moderate injury.
NOTE!
“NOTE” provides tips that are valuable for the optimal operation of
your product.
4.5 OVERALL INSTALLATION.....................................................................................................................................18
4.5.1 CABLE CONNECTION...................................................................................................................................20
4.5.2 CONNECTING POWER CABLES............................................................................................................22
4.5.3 CONNECTING POWER LINES.................................................................................................................26
4.5.4 CONNECTING CAN COMMUNICATION CABLE.......................................................................27
4.5.5 CONNECTING RS485 COMMUNICATION CABLE...................................................................28
4.5.6 CONNECTING GROUND WIRE..............................................................................................................29
4.6 OVERVIEW OF INSTALLATION..........................................................................................................................31
5 COMMISSIONING...................................................................................................................................................................32
5.1 CONFIGURING BATTERY SYSTEM....................................................................................................................32
5.2 COMMISSIONING.........................................................................................................................................................33
5.3 STATUS INDICATORS...............................................................................................................................................35
5.3.1 BMS ............................................................................................................................................................................35
5.3.2 BATTERY PACK....................................................................................................................................................36
5.4 SHUTTING DOWN SE-BAT SYSTEM.............................................................................................................36
6 TROUBLESHOOTING............................................................................................................................................................37
6.1 TROUBLE SHOOTING.............................................................................................................................................37
7 DECOMMISSIONING............................................................................................................................................................40
7.1 DISMANTLING THE BATTERY............................................................................................................................40
7.2 PACKAGING....................................................................................................................................................................40
SE-BAT-MA H 5.8
NOTE: There are 4 models for SE-BAT system, which includes BMS and battery
pack(s). Please refer to section 3.3.1 SE-BAT SYS-HV Conguration List on page 11
for detailed models.
SE-BAT PACK-HV
SE-BAT-SL H 5.8
8 MAINTENANCE AND WARRANTY.............................................................................................................................41