SIFANG CSC-1321 User manual

CSC-1321
Gateway User Guide

CSC-1321 Gateway User
Guide
Compiled:LvHongchang Checked:WuFangying
Standardized:LiLianchang Inspected:YuBin
Version:V1.0
Doc.Code: F0SF.452.028(E)
IssuedDate:2013‐08‐19
Copyright:BeijingSifangAutomationCo.,Ltd
Note: TheCompanyreservestherightofmodifyingthespecifications.Iftherearedifferences
betweenproductsandthespecifications,pleasecontactustimely.Andwewillprovide
youwithrelevantserves.
Technicalsupport: Tel:010‐62986668 Fax:010‐62981900

Version:V1.00
Doc. Code: F0SF .452.028(E)
Issued Date:2013.8
Copyright owner: Beijing Sifang Automation Co., Ltd
Note: The company keeps the right to perfect the instruction. If equipments do not agree with
the instruction at anywhere, please contact our company in time. We will provide you with
corresponding service.
®
is registered trademark of Beijing Sifang Automation Co., Ltd.
We reserve all rights to this document, even in the event that a patent is issued and a different
commercial proprietary right is registered. Improper use, in particular reproduction and
dissemination to third parties, is not permitted.
This document has been carefully checked. If the user nevertheless detects any errors, he is
asked to notify us as soon as possible.
The data contained in this manual is intended solely for the Gateway description and is not to
be deemed to be a statement of guaranteed properties. In the interests of our customers, we
constantly seek to ensure that our products are developed to the latest technological standards
as a result it is possible that there may be some differences between the hardware/software
product and this information product.
Manufacturer:
Beijing Sifang Automation Co., Ltd.
Tel: +86 10 62962554, +86 10 62961515 ext. 8998
Fax: +86 10 82783625
Website: http://www.sf-auto.com
Add: No.9, Shangdi 4th Street, Haidian District, Beijing, P.R.C.100085

Preface
Safety information
Strictly follow the company and international safety regulations.
Working in a high voltage environment requires serious approch to
aviod human injuries and damage to equipment
Do not touch any circuitry during operation. Potentially lethal
voltages and currents are present
Avoid to touching the circuitry when covers are removed. The
Gateway contains electirc circuits which can be damaged if exposed
to static electricity. Lethal high voltage circuits are also exposed
when covers are removed
Using the isolated test pins when measuring signals in open circuitry.
Potentially lethal voltages and currents are present
Never connect or disconnect wire and/or connector to or from
Gateway during normal operation. Dangerous voltages and currents
are present. Operation may be interrupted and Gateway and
measuring circuitry may be damaged
Always connect the Gateway to protective earth regardless of the
operating conditions. Operating the Gateway without proper earthing
may damage both Gateway and measuring circuitry and may cause
injuries in case of an accident.
Do not remove the screw from a powered Gateway or from an
Gateway connected to power circuitry. Potentially lethal voltages and
currents are present
Using the certified conductive bags to transport PCBs (modules).

Handling modules with a conductive wrist strap connected to
protective earth and on an antistatic surface. Electrostatic discharge
may cause damage to the module due to electronic circuits are
sensitive to this phenomenon
Do not connect live wires to the Gateway, internal circuitry may be
damaged
When replacing modules using a conductive wrist strap connected to
protective earth. Electrostatic discharge may damage the modules
and Gateway circuitry
When installing and commissioning, take care to avoid electrical
shock if accessing wiring and connection Gateways

Contents
Chapter 1Opening Inspection..........................................................................................................8
Chapter 2Installation and commissioning....................................................................................10
1Installation.......................................................................................................................................11
2Inspection before powering on....................................................................................................12
3Insulation resistance measurement............................................................................................13
4Power-on inspection of device.....................................................................................................14
Chapter 3Description of device terminal......................................................................................15
1Main cpu Module...........................................................................................................................16
2Ethernet Module.............................................................................................................................17
3Serial port Module.........................................................................................................................18
4Binary input/output Module..........................................................................................................19
5Time synchronization....................................................................................................................20
6Power Module................................................................................................................................23
Chapter 4Human-machine interface and its operation..............................................................24
1Front layout of the device.............................................................................................................25
2Display under normal operation..................................................................................................26
3Menu and its operation.................................................................................................................27
Chapter 5Operation and Maintenance.........................................................................................42
1Inspection before operation.........................................................................................................44
2Notes during operation.................................................................................................................45
3Common failures and countermeasures IRIG-B mode............................................................46
Chapter 6Transportation and storage..........................................................................................47


Chapter 1 Opening Inspection
Chapter 1 Opening Inspection
About this chapter
This chapter describes open package inspection of Gateway.

Chapter 1 Opening Inspection
1 After opening the package, check whether the device appearance is intact
without any damage.
2 Check whether the certificate of compliance, supporting documents,
accessories and spare parts of the device are consistent with the order
requirements, whether the description, name and quantity are consistent with
that specified in the packing list and whether the device is complete.
3 Please contact the manufacturer immediately in case of any problems.

Chapter 2 Installation and commissioning
Chapter 2 Installation and
commissioning
About this chapter
This chapter describes installation of Gateway and inspection before and
after Gateway is energized.
Table of contents
Other SIFANG Gateway manuals
Popular Gateway manuals by other brands

LST
LST M500RFE-AS Specification sheet

Kinnex
Kinnex Media Gateway quick start guide

2N Telekomunikace
2N Telekomunikace 2N StarGate user manual

Mitsubishi Heavy Industries
Mitsubishi Heavy Industries Superlink SC-WBGW256 Original instructions

ZyXEL Communications
ZyXEL Communications ZYWALL2 ET 2WE user guide

Telsey
Telsey CPVA 500 - SIP Technical manual












