SEGUE VK-2319 Manual

© 2024
Locked layer contains
placeholder marks.
Plan View
10’
20’
VK-2319 - 10’ x 20’ Sunrise Inline
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
SETUP INSTRUCTIONS

© 2024
Locked layer contains
placeholder marks.
= 1 sq foot
Plan View

© 2024
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, keep all
knobs & connectors attached to
extrusions during disassembly.
Part Identification - Numbering
7A
Engaged Lock
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
WARNING
General Information

© 2024
TSP46 Profile
All knobs must be tightened securely to ensure a proper connection.
Adjust connectors if necessary to
prevent gaps in connection.
Upper Horizontal Extrusion
Lower Horizontal Extrusion
Corner
Connector Corner
Connector
Corner
Connector
Corner
Connector
COMPLETED ASSEMBLY
Slide verticals over
lower connectors.
Then slide upper
connectors into
groove of verticals.
Tighten all knobs.
Corner Connection
3) Tighten all knobs to secure connection.
Disassembly
1) Loosen knobs on vertical extrusions.
2) Slide the vertical extrusions off of
corner connectors on lower and upper
horizontal extrusions.
1) Loosen knobs, then slide vertical extrusions onto
corner connectors of lower horizontal extrusion.
2) Slide corner connectors of upper horizontal
extrusion into grooves of vertical extrusions.
Disassembly
1) Loosen all knobs.
2) Slide connectors off of one extrusion.
3) Tighten knobs to prevent loss during
packing & shipping.
Keep straight connectors in groove of
extrusion. Do not remove connectors
during disassembly.
Straight Connection
3) Tighten all knobs to secure connection.
When assembling frame, first attach all straight
connectors, then attach corner connectors.
1) Place extrusions end-to-end.
Slide connector across seam of extrusions.
Tighten all knobs.
All knobs must be tightened securely to ensure a proper connection.
Straight Connector
2) Loosen all knobs, then slide straight
connector across the seam of extrusions.
Tool-less Frame Assembly

© 2024
Graphic Removal
To remove the graphic
the frame, locate the fabric
pull tab.Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
from
SEG Installation

© 2024
Case 1 of 4
Locked layer contains
placeholder marks.
Top View of Each Level
1A 13 3A 4 4A
5 5A 2 2A
6
6
Level 1
(Bottom level)
Level 3Level 2 Level 4
Setup Hardware
Monitor Mount
Lights
Graphics
Wings
VK-2319 Backwall
Case Packing

© 2024
Case 2 of 4
Locked layer contains
placeholder marks.
Top View of Each Level
1A 13 3A 4 4A
5 5A 2 2A
6
6
Level 1
(Bottom level)
Level 3Level 2 Level 4
Setup Hardware
Monitor Mount
Lights
Graphics
Wings
VK-2319 Backwall
Case Packing

© 2024
Case 3 of 4
Locked layer contains
placeholder marks.
LTK-1001 Counter
Level 2 Level 3 Level 4 Level 5Level 1 (Bottom Level)
Top View of Each Level
Counter Top (2) Side Panels
Front Panel
Shelf
Floor
Shelf
Supports
Standoffs
Keys
Hardware
Back Panel w/ Door
Case Packing

© 2024
Case 4 of 4
Locked layer contains
placeholder marks.
LTK-1001 Counter
Level 2 Level 3 Level 4 Level 5Level 1 (Bottom Level)
Top View of Each Level
Counter Top (2) Side Panels
Front Panel
Shelf
Floor
Shelf
Supports
Standoffs
Keys
Hardware
Back Panel w/ Door
Case Packing

© 2024
Step 1 of 4
Locked layer contains
placeholder marks.
When assembled
Item
1,1A
2,2A
3,3A
4,4A
5,5A
6
Qty.
1,1
1,1
1,1
1,1
1,1
2
Description
45” TSP46 Vertical Extrusion w/ Clamps
45” TSP46 Vertical Extrusion w/ Clamps
45” TSP46 Horizontal Extrusion
45” TSP46 Horizontal Extrusion
43.2085” Z45 Vertical Extrusion
Boomerang Foot
3
6
6
1
1A
5
5A
2
2A
3A
44A
**
Keep A10 clamps attached
to [1] [1A] [2] and [2A],
when packing.
Z45 Connection
Turn knob clockwise
to tighten lock.
Do not over tighten Knobs
Knob
*
X
A
*
A
*
A*
A
*
*
X
*X
*
X
*
X
Assemble frame flat on ground.
Steps:
Refer to the Tool-less Frame Assembly general information page.
1) Assemble vertical extrusions [1-1A], [2-2A], [5-5A] & horizontal
extrusions [3-3A], [4-4A], using Tool-less Spline connectors labeled [X].
2) Connect vertical assemblies [1/1A], [2/2A] between horizontal
assemblies [3/3A], [4/4A], using Tool-less Corner Connectors labeled [A].
3) Install Boomerang Feet [6] to frame assembly as shown.
See Boomerang Foot Attachment detail.
4) Lift up frame & connect vertical assembly [5/5A] between horizontals
as shown. See Z45 Connection detail.
Tighten knob
to secure
Hook keyhole to installed
Button Head bolt
Keyhole
Button
Head
Bolt
Knob
Boomerang Foot Attachment
*
Backwall Assembly
Table of contents
Popular Rack & Stand manuals by other brands

Salamander
Salamander Acadia AC/W/L400/WH Assembly instructions

Fohhn
Fohhn VAT-09 Mounting instruction

ricoo
ricoo FS0522 quick start guide

AMSOIL
AMSOIL BMK-22 Installation and service instructions

Kargo Master
Kargo Master 48220 installation guide

Milestone AV Technologies
Milestone AV Technologies SIMPLICITY SLF2 installation instructions











