Nido Robotics Sibiu Nano User manual

Sibiu Nano - Assembly Manual (English)
With this guide you will learn how to assemble your Sibiu Nano Maker Kit.
Escrito por: Nido Robotics
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 1 de 31

INTRODUCCIÓN
Do you have a Sibiu Nano Kit? Now you can start the assembly process. It is a simple procedure
following these steps. You wont have to solder or pot.
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 2 de 31

Paso 1 — Structure components
2 x Side panels
2 x Upper clamps 2 x Middle clamps 2 x Lower clamps
4 x Motor brackets 2 x Vertical motor brackets.
2 x Front mounts 2 x Rear mounts
1 x Rear shaft
1 x Bottom panel
1 x Float
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 3 de 31

Paso 2 — Bottom panel sub-assembly
1 x Bottom panel
2 x Lower clamps
4 x R6 7/8 Screws (Bag 1)
Starting the assembly. The first step is the bottom sub-assembly. The lower clamps are installed
on the bottom panel slots with its correspondent screws.
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 4 de 31

Paso 3 — Motors sub-assembly
2 x Front mounts
2 x Rear mounts
4 x Motor brackets
8x R6 7/8 Screws (Bag 1)
In this step, the motor brackets are installed into the mounts' slots.
Install 2 screws per bracket.
Every motor bracket must be installed with the rounded edge facing outward as shown on the
picture 2
The position of each motor sub-assembly on the picture 2.
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 5 de 31

Paso 4 — Top sub-assembly
2 x Upper clamps
2 x Vertical motor brackets
8 x R6 7/8 Screws (Bag 1)
The vertical motors brackets are assembled to the upper clamps arranging the top sub-assembly.
The lateral slot on the brackets must be facing inward the sub-assembly just like shown in the
pictures.
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 6 de 31

Paso 5 — Assembling the side panels into the bottom sub-assembly
2 x Side panels
1 x Bottom sub-assembly
4 x R6 7/8 Screws (Bag 1)
The bottom sub-assembly is installed into the side panels' slots.
The bottom sub-assembly is symmetric, so the orientation does not matter.
For the next steps, keep in mind the orientation shown in the picture 1.
Red arrow: Front
Blue arrow: Rear
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 7 de 31

Paso 6 — Motors sub-assembly to side panels
2 x Front motors sub-assembly
2 x Rear motors sub-assembly
8 x R6 7/8 Screws (Bag 1)
Remember the position of the motors sub-assemblies (picture 1) when installing them into the side
panels.
The mounts are fitted into the side panels' slots.
After this step, the frame should look like picture 3
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 8 de 31

Paso 7 — Preparing the battery flanges
2 x flanges with o-rings set and silicon grease tube
1 x front battery end cap (no holes)
1 x rear battery end cap (2 holes)
12 x M3x14 screws (Bag 3)
Before installing the battery enclosure, the flanges must be assembled with their end caps and o-
rings. The front battery flange is shown at picture 3.
First of all, apply a little amount of silicon grease on the o-rings.
Use the screws for installing the end caps.
It is important to avoid the presence of any particles or dust on the o-rings.
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 9 de 31

Paso 8 — Battery enclosure installation
1 x Acrylic tube (200 mm)
1 x Bottom + Motors sub-assembly
The bottom clamps must have the non-slip tape, as shown in the picture.
Put the battery enclosure on the bottom clamps. The front end cap must be resting on the front
mounts as shown in the picture 2.
Sibiu Nano - Assembly Manual (English) Borrador: 2019-01-22ID de guía: 20 -
Este documento fue generado el 2019-10-04 02:18:54 AM (MST).
© 2019 nido.dozuki.com/ Página 10 de 31

















