Transport
S1256PC should be transported and stored vertically in a
dry place. When being moved into a building, S1256PC may
be leant back 45 °.
Ensure that S1256PC has not been damaged during trans-
port.
Caution
The product can be tail heavy.
Remove the outer panels in order to protect them when
moving in confined spaces inside buildings.
EXTRACTING THE COOLING MODULE
To simplify transport and service, the heat pump can be
separated by pulling the cooling module out from the cabin-
et.
See page 59 for instructions about the separation.
Assembly
•Position S1256PC on a solid foundation indoors that
withstands water and the weight of the product.
Use the product’s adjustable feet to attain a horizontal
and stable set-up.
30 - 50 mm
30 - 50 mm
15 - 40 mm
•Since water comes from S1256PC, the area where S1256PC
is located must be equipped with floor drainage.
•Install with its back to an outside wall, ideally in a room
where noise does not matter, in order to eliminate noise
problems. If this is not possible, avoid placing it against a
wall behind a bedroom or other room where noise may be
a problem.
•Wherever the unit is located, walls to sound sensitive
rooms should be fitted with sound insulation.
•Route pipes so they are not fixed to an internal wall that
backs on to a bedroom or living room.
INSTALLATION AREA
Leave a free space of 800 mm in front of the product. Ap-
prox. 50 mm free space is required on each side, to allow
the side panels to be removed (see image). All service on
S1256PC can be carried out from the front, however the
right-hand panel may need to be removed. Leave free space
between the heat pump and the wall behind (and any routing
of supply cables and pipes), to reduce the risk of any vibra-
tions being propagated.
* A normal installation needs 300 – 400 mm (any side) for
connection equipment, e.g. level vessel, valves and electrical
equipment.
NIBE S1256PCChapter 2 | Delivery and handling6
Delivery and handling