
C
B
A
Website: http://www.anpe.cn
Service Tel: +86(25)-84459479
Address: New Power industrial Park, Luhe Economic Development Zone, Nanjing, China
Postcode: 211500
Control unit
intrinsicall y
safe valves
C. Remove the safety barrier as arrow shows.
mAs far as possible to mount it vertically, In order to
dissipation the heat of the apparatus.
Vertically installation
èLight indication
mOUT1 and OUT2 (Dual channel) or OUT (Single channel):
Output status indicators. When the output loop
voltage is normal, the indicators turns to yellow.
èAttention
mIsolated Safety Barriers degree of protection is IP 20 and
must be protected from undesirable ambient conditions
(waterproofing, small foreign objects). It is suitable for
installation in the control room or high density field
cabinet, DIN 35 mm installation is convenient for
installation and displacement.
mThe devices were designed for use in pollution degree 2
and overvoltage category III as per IEC/EN 60664-1. If
used in areas with higher pollution degree, the devices
need to be protected accordingly.
mInstallation position shall not be affected by strong
mechanical vibration; impact and electromagnetic
induction from signal terminal and power supply, should
conformity with the requirements on electromagnetic
interference resistance of products in Class 3 industrial
field atmosphere stipulated in IEC 61000-4; the
atmosphere shall be free from gases that are corrosive to
metal and plastic components.
mThe apparatus must be installed, connected and adjusted
by qualified personnel in non-hazardous area according
with the instruction manual.
mThe operator must strictly comply with the relevant local
safety standards and guidelines.
è
Supplementary instructions
m
Our company reserves the right to change the product
information without prior notification to the user. If the
contents of the description are different from website or
sample, this description shall prevail.
output status.
èInstallation
mThe apparatus can be installed on the DIN 35 mm
standard rail which is corresponding to DIN IEC 60715.
The must be snapped onto the rail, and never slanted or
tipped to the side.
mInstallation and disassembly steps are shown in following
figures:
A. Snap metal lock onto mounting rail, then rotate the safety
barrier, as figure A, press down the safety barrier onto
mounting rail.
B. Pry the metal lock off the rail with screwdriver as arrow
shown, pull downward the springs, and rotate the safety
barrier.
1 0
9
8
7
6
5
2
1
4
3
1 0
9
8
7
6
5
2
1
4
3
1 0
9
8
7
6
5
2
1
4
3
1 0
9
8
7
6
5
2
1
4
3
1 0
9
8
7
6
5
2
1
4
3
1 0
9
8
7
6
5
2
1
4
3
604040108400301