
Instruction Manual
Page 7 CHAPTER 3 OPERATING INSTRUCTIONS
3.0 Operating Instructions
The following procedures should be followed only after you have followed the Wedge Adjustment and
Guide adjustment procedures.
1. Pull up on Red Power Switch #3 to turn machine on. The Green Power Light #4 will go on with a
one second delay. The Green light will remain on as an indicator that you have power to the ma-
chine. (Push down on Red Power Switch #3 to turn machine off)
2. Temperature Controller #7 will come on with a 1-2 second delay after Green Power Light goes on.
Units are set in celsius at the factory. Press the Set Button and hold, now press the up or down
button until you reach your desired temperature. Heat up time is only one to two minutes. Do not
adjust heat over 510 degrees C. For sample welds, set controller to 400 degrees C. This may not
be your final setting.
3. Set For/Rev Switch #5 to Forward position. This indicates direction of machine and drive/pressure
roller movement.
4. Set Man/Auto Switch #2 to Auto position. This will engage or start Drive/Pressure rollers when
wedge is moved into welding position.
5. Swing Drive Wheel Assembly #10 under bottom Pressure Roller. This will make the machine move
or automatic. With Drive Wheel Assembly out, the machine can be used in a stationary mode.
6. #1 is the Speed Control. It is adjustable from 0-30 feet per minute. Normal setting will be in the
30 to 60 range, for 12-30 mil goods.
7. #8 is the Pressure Knob. It can be adjusted for more or less pressure, depending on the thickness
of material.
8. Insert material into the machine with proper guides installed and close Pressure Wheel Handle #9.
9. Swing Wedge Engagement Handle #11 in toward the machine, this will automatically start forward
motion of the Triad and engage wedge with material.
10. Adjust speed control up or down until you can verify you are getting a proper weld.