Medora GridBee SN15 User manual

© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
O&M_SN15_10030_20200619
GridBee SN15
Owner's Manual

Table of Contents
About Ixom
Ixom combines knowledge and experience from across the water quality spectrum to help solve
real-world problems. Whether in Lakes, Stormwater Retention Ponds, Raw Drinking-Source Reservoirs, Water
Treatment Plants, Potable Storage Tanks, or Wastewater Treatment Processes, Ixom equipment continues to
be at the forefront as the #1 world leader for in-situ water body treatment.
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Table of Contents
10014_20200528
GridBee SN15
Owner's Manual
Safety 1
Placement 4
Electrical 6
Startup and Operation 8
Troubleshooting 9
Technical Specifications 10
Exploded Parts Diagram 11
Dimension Drawing 12
Warranty 13
Customer Service 14
O&M_SN15_10030_20200619

Carefully read safety information when you see
any safety symbols.
Be sure you have read all installation, operation, maintenance and safety instructions before
you install, service or begin to operate this unit.
Accidents occur every year because of careless use of industrial equipment. You can avoid hazards
by following these safety instructions, and applying some ordinary common sense when operating or
servicing this unit.
Keep in mind that full operator attention and alertness are required when operating or servicing
this unit.
USE COMMON SENSE!! Most accidents can be avoided by using common sense and
concentration on the job being done.
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Safety
Safety
1949_10036_20200528 O&M_SN15_10030_20200619 - 1

IMPORTANT!!!
Follow all federal and state laws in regards to
safety regulations of working at heights, conned
spaces, rescue, etc. as required by the U.S.
Department of Labor, Occupational Safety and
Health Administration. Use necessary PPE when
placing and servicing this unit.
Identify all possible hazards. Determine what
safeguards are needed and implement them.
Only you, the user, understand your product
and system characteristics fully. The ultimate
responsibility for safety is with you. Your
safety ultimately rests in your hands. Do
your part and you will enjoy safe, trouble free
operation for years to come. This instruction
manual is not intended to include a
comprehensive listing of all details for all
procedures required for placement, operation
and maintenance. If you have a question about
a procedure or are uncertain about any detail,
Do Not Proceed. Please contact Ixom
Customer Service at 866-437-8076 to speak
to a representative.
ELECTRICAL HAZARD
WARNING: THIS EQUIPMENT CONTAINS
HIGH VOLTAGE! ELECTRICAL SHOCK CAN
CAUSE SERIOUS OR FATAL INJURY. ONLY
QUALIFIED PERSONNEL SHOULD ATTEMPT
PLACEMENT, OPERATION AND MAINTENANCE
OF ELECTRICAL EQUIPMENT. REMOVE ALL
SOURCES OF ELECTRICAL POWER BEFORE
PERFORMING ANY SERVICE WORK TO THE
MACHINE. USE PROPER LOCKOUT TAGOUT
(LOTO) PROCEDURES TO ENSURE A SAFE
WORK ENVIRONMENT.
Rotating Hazard
CAUTION: KEEP BODY APPENANDAGES OR
LOOSE CLOTHING AWAY FROM EQUIPMENT
WHILE OPERATING. ENSURE EQUIPMENT IS
OFF BEFORE ATTEMPTING SERVICE.
Crush Hazard
WARNING: DO NOT REMOVE ANY FLOAT
ASSEMBLY BOLTS OR PINS WHILE EQUIPMENT
IS FLOATING IN WATER. EQUIPMENT MUST BE
SECURELY SUPPORTED BEFORE PERFORMING
SERVICE.
Laceration Hazard
CAUTION: EDGES MAY BE SHARP AND CAUSE
LACERATION IF PROPER CARE IS NOT USED.
Entanglement Hazard
WARNING: ENSURE THAT PERSONNEL ARE
CLEAR OF THE ELECTRIC CORD AND CHAIN TO
AVOID ENTANGLEMENT.
Thin Ice Hazard
WARNING: ICE SURROUNDING MACHINE MAY
NOT SUPPORT WEIGHT, KEEP CLEAR OF THIN
ICE.
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Safety
Safety
1949_10036_20200528 O&M_SN15_10030_20200619 - 2

Permit-Required
Conned Spaces
A conned space has limited openings for
entry or exit, is large enough for entering and
working, and is not designed for continuous
worker occupancy. Conned spaces include
underground reservoirs, ground storage tanks,
elevated tanks, silos, manholes, and pipelines.
Conned Space Tips
• Do not enter permit-required conned spaces
without being trained and without having a
permit to enter.
• Review, understand and follow employer’s
procedures before entering permit-required
conned spaces and know how and when
to exit.
• Before entry, identify any physical hazards.
• Before and during entry, test and monitor for
oxygen content, ammability, toxicity or
explosive hazards as necessary.
• Use fall protection, rescue, air monitoring,
ventilation, lighting and communication
equipment according to entry procedures.
• Maintain contact at all times with a trained
attendant either visually, via phone, or by
two-way radio. This monitoring system
enables the attendant and entry supervisor
to order you to evacuate and to alert
appropriately trained rescue personnel to
rescue entrants when needed.
Refer to 29 CFR 1910.146 for complete
regulations set by OSHA. Refer to your state's
regulations if your state established and operates
their own safety and health programs approved
by OSHA.
Protect Yourself
It is important that you comply with all relative
OSHA and local regulations while installing
and performing any maintenance to the mixer
circulation equipment.
Key OSHA Compliance Standards that must
be followed (and not limited to) are:
• 1910.146 Permit-required conned spaces
• 1910.147 Lockout/Tagout
• 1926.500 Fall Protection
Fall Protection Tips
• Identify all potential tripping and fall hazards
before work starts.
• Look for fall hazards such as unprotected
oor openings/edges, shafts, open hatches,
stairwells, and roof openings/edges.
• Inspect fall protection and rescue equipment
for defects before use.
• Select, wear, and use fall protection and
rescue equipment appropriate for the task.
• Secure and stabilize all ladders before
climbing.
• Never stand on the top rung/step of a ladder.
• Use handrails when you go up or down stairs.
• Practice good housekeeping. Keep cords,
welding leads and air hoses out of walkways
or adjacent work areas.
Refer to 29 CFR 1926.500 for complete
regulations set by OSHA. Refer to your state's
regulations if your state established and operates
their own safety and health programs approved by
OSHA.
Lockout Tagout
When the On/Off switch is in the "ON" position,
the mixer may start up at any time if not already
operating. The mixer's On/Off switch can be
locked out by placing a pad lock thru the door latch
of the controller after the switch has been turned
to the "OFF" position. The On/Off switch is to be
used as the emergency stop.
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Safety
Safety
1949_10036_20200528 O&M_SN15_10030_20200619 - 3

Control Panel Secondary Disconnect
& Tank Penetration
Source Power
SN Machine
Submersible cable ran from tank penetration to
SN machine.
Electrical conduit ran to top of tank, 4
Conductors sized according to NEC.
Spray system installed through hatch. Tethered
with dual tether system
Electrical Control Panel located at bottom of
tank.
Blower placed over top of machine.
Blower size depends on tank specics and
application. (Blower shown as roof mount,
certain models may require ground mount.)
Machine safety disconnect located near tank
entry
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Placement
Placement Overview
SN Large Frame Series
10041_20200221 O&M_SN15_10030_20200619 - 4

FRONT VIEW SN DUAL TETHERING
TOP VIEW SN DUAL TETHERING
ROOF CONNECTION DETAIL
4” Diameter Chain Loop
316 Stainless Steel Chain
Approx. 6”
MOORING CONNECTION DETAIL
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
SN Machine
Dual Tethering
Visual Dual Tethering
SN Large Frame Series
2001_10142_20200221 O&M_SN15_10030_20200619 - 5

Three Phase Motor Specications (60 Hz) 3450 RPM:
TYPE
RATING FULL LOAD MAXIMUM LOAD LINE TO LINE
RESISTANCE
OHMS
EFFICIENCY LOCKED
ROTOR
AMPS
KVA
CODE
HP KW VOLTS HZ S.F. AMPS WATTS AMPS WATTS S.F. F.L.
4” STD
5 3.7
200 60 1.15 18.3 4800 20.5 5500 .68-.83 78 78 116 K
230 60 1.15 15.9 4800 17.8 5500 .91-1.1 78 78 102 K
460 60 1.15 8.0 4800 8.9 5500 3.6-4.4 78 78 53.7 K
6 ” STD.
10 7.5
230 60 1.15 28.4 9400 32.2 10800 .47-.57 79 79 172 H
380 60 1.15 17.6 9400 19.6 10800 1.2-1.5 79 79 104 H
460 60 1.15 14.2 9400 16.1 10800 1.9-2.4 79 79 86 H
15 11 380 60 1.15 25.8 13700 28.9 15800 .77-.95 81 81 161 H
460 60 1.15 20.8 13700 23.7 15800 1.1-1.4 81 81 133 H
TYPE
RATING CIRCUIT BREAKERS OR FUSE AMPS CIRCUIT BREAKERS OR FUSE AMPS
(MAXIMUM PER NEC) (TYPICAL SUBMERSIBLE)
HP KW VOLTS STANDARD
FUSE
DUAL ELEMENT
TIME DELAY FUSE
CIRCUIT
BREAKER
STANDARD
FUSE
DUAL ELEMENT
TIME DELAY FUSE
CIRCUIT
BREAKER
4” STD &
HI-TEMP
5 3.7
200 60 35 50 60 25 50
230 50 30 40 45 20 40
460 25 15 20 25 10 20
6 ” STD.
10 7.5
230 90 50 80 90 40 80
380 60 35 45 50 25 45
460 45 25 40 45 20 40
15 11 380 80 50 70 80 35 70
460 70 40 60 60 30 60
Three Phase Submersible Motor and Pump Protection Wiring
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Electrical
Three Phase Wiring for THM SN Spray Units
1584_10037_20200619 O&M_SN15_10030_20200619 - 6

TANK PENETRATION IS SEALED WITH
HDPE WASHERS ACCOMPANIED BY
LEXEL® CO-POLYMER RUBBER-BASED SEALANT
CROSS-SECTIONAL VIEW
METAL TANK ROOF
INSIDE TANK
OUTSIDE TANK
ELECTRIC CABLE
1 CORD BOLT PER GRIDBEE:
NUT/GASKET OD: 2.250”
THREADED FIXTURE OD: 1.250”
BORE REQUIRED: 1.3125”
WASHER SEAL, HDPE
STRAIN RELIEF
WASHER
BRASS NUT
316SS UNIVERSAL
FIXTURE
(3/4” NPT FEMALE
THREADS FOR CONDUIT
CONNECTION POINT)
BRASS NUT
T316SS 3/4” MNPT
GLAND SEAL
316SS QUICK LINK
MESH STRAIN RELIEF
INSIDE
TANK
OUTSIDE
TANK
WASHER SEAL, HDPE
MAXIMUM BEARING
THICKNESS: 3.125 INCHES
NOT DESIGNED AS A
SUBMERSIBLE PENETRATION.
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Electrical
Universal Fixture Assembly
Tank Penetration
1988_10121_20200221 O&M_SN15_10030_20200619 - 7

Placement Checks
Before starting the SN Spray Unit a few checks need to be done to conrm the placement is correct.
Placement Check Check
Is the SN Spray Unit properly tethered? (Assembly)
Is the cord ran through the cord seal and cord seal tightened at the interior of the cord xture? (Assembly)
Is the top splice between submersible cable conductors and exterior electric conductors insulated from each
other and individually sealed to protect from corrosion? (Assembly)
Is the control panel wired correctly? (Control Panel Diagram)
Is the SN Spray Unit submerged within the minimum water depth required? (Technical Specications)
Is the Motor rotating the correct direction? (See Rotation Check below)
Check Reading
Single Phase Three Phase
Continuity Check (Motor Windings + Splice + Wire)
Reference Wiring for Line to Line Ohms
L1:L2 L1:L2 L2:L3 L1:L3
Discontinuity Check (Power to Ground)
Should be Open to Ground
L1: GND L1: GND L2:GND L3:GND
Source Voltage Reading (while unit is running) L1:2 L1:2 L2:L3 L1:L3
Amperage Reading (while unit is running)
Reference Wiring Full Load / Max Load
L1 L1 L2 L3
Flow Check Auditory
Flow Check Visual
Final Checks
Now that the install checks have been completed. Now to conrm the continuity and discontinuity and then
start the SN Spray Unit.
Rotation Check - (Three Phase Only)
Before nalizing the placement, the motor rotation needs to
be checked. With someone observing the SN Spray Unit,
briey turn the unit on for several seconds and observe the
ow pattern, look for how far out the spray reaches. Turn unit
off, isolate power, and have a qualied person switch 2 of the
3 motor leads of outgoing power. Repeat operation again for
several seconds and observe the SN Spray Unit ow pattern
again. Determine which wiring conguration produced the
ow pattern that reaches out the furthest and nalize with that
wiring of the outgoing power leads. See Figure 1 for proper
ow direction. Figure 1: Flow Check
REVERSEFWD FWD
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Startup and Operation
SN Startup and Operation
Wiring
10103_20200221 O&M_SN15_10030_20200619 - 8
Table of contents
Popular Paint Sprayer manuals by other brands

Bonide
Bonide 051 Operation and service instructions

zogics
zogics Z-DAS instruction manual

KISANKRAFT
KISANKRAFT KK-KBS-165 Operation manual

Matrix
Matrix SG 650 Translation of the original instructions

Anest Iwata
Anest Iwata SGA-3 Installation, use & maintenance instruction manual

paasche
paasche VV Instructions and parts list











