
1: Pump always under the waterline
- Prevent contact with bilge water
- Install pump- zinc- anode
- Keep space behind pump unit (Venlator cap)
- Ensure space besides the pump for baeries
2: Baeries directly next to pump
- Use Opma Yellowtop baeries
- Install baeries on waterproof plywood and install baeries and secure safely
- When necessary: install series-parallel switch on top the baeries
- Keep cable length to absolute minimum. Take notes of cable length for evaluaon
- Connect negave of baery 1 with negave of service baery. (Common ground)
- Use proper baery pole clamps
- Use proper and good-ng terminals
- Install baery pole caps
3: Nozzle posion
- Nozzles as far forward (or in the stern) of the vessel
- Topside Nozzle tube 7-10cm under the waterline
- Installaon of Nozzle horizontal
- Nozzle 90 degrees to be installed to center-line of the vessel
- Nozzle can be located slightly forward and a of each other (staggered)
- Use 45-degrees elbow only in case of a small bow secon
- For a wide bow: do not use 45-degree elbows but curve the hose instead
- Install and connect the zinc anode with the stainless steel parts
4: Clean all threaded parts before using PU sealant