
7900 ES Slide Rock Rev. 09/10
3050 S. ALVERNON WAY
TUCSON, AZ 85713
800.737.5386
2D. Once the panel is in position, start at the step and work
down the lume to attach the panel to the slide using a 5/16”
socket or nut driver and the 3” Hex Tek zinc screws provided.
2E. The screws are sel tapping, so no pilot holes are
required. Tighten screws lush with the panel and do not
over-embed.
2F. NOTE: Do not begin attaching with screws until the it
o the entire panel is con irmed. Attache the panel to the
deck using the 3-1/4” Tapcon (blue) screws and 1/4”
nylon washers provided.
3. Rear panel installation (away rom pool). Repeat steps or
ront panel installation to attach the rear panel to the slide.
. Attach the underside section to both ront and rear
panels as shown in photo above.
5. Caulking cord and touch up paint are provided with the
hardware kit. Use the caulking cord to cover screw
heads and washers. Paint screw heads and caulk with
touch up paint kit. Use a blotting motion to paint caulking.
EDGESTONE SLIDE ROCK
Rock Panel Installation Guide - cont.
HARDWARE KIT: QTY 1 = BRUSH ACID P14 (Paint Touch Up Brush)
QTY 5 = H-1/4X3-1/4 TAP (Tapcon Hex Head Zinc) QTY 1 = H-CAULKING-EON (Caulking Cord)
QTY 5 = H-1/4NYLON WAS (1/4” Nylon Washer) QTY 3 or 4 = Touch Up Paint (3 or 4 Bottles; Depends on Color Ordered)
QTY 25 = H-SELF DRILL (#12 x 3” Hex Tek Zinc) QTY 1 = 3/16” Masonry Bit (Masonry Drill Bit)