Gude Expert Power Control NET 24x User manual

Expert Power Control NET 24x
Manual
The 24-fold Remote Power Switch for TCP/IP networks

1Expert Power Control NET 24x
Manual Expert Power Control NET 24x
© 20 G8'(6\VWHPV*PE+
Rev. 1.

1Expert Power Control NET 24x
Content
Security Advise 2
1. Description 3
2. Hardware 3
2.1 Extend of Delivery 3
2.2 Installation 3
2.3 Status LED 3
3. Conguration 5
3.1 Automatic conguration by DHCP 5
3.2 Network conguration by GBL_Conf.exe 5
3.3 Conguration by Webinterface 6
3.4 IP Access Control List 12
3.5 SNMP 13
3.6 Syslog 14
4. Switching 15
4.1 Switching at the device 15
4.2 Switching by Webinterface 15
4.3 Fuses 17
5. Features 18
5.1 Bootloader mode 18
5.2 Firmware update 18
5.3 Default settings 19
5.4 Technical Information 20
6. Support 21

Expert Power Control NET 24x
2
3Expert Power Control NET 24x
The device must be installed only by qualied personnel accord-
ing to the following installation and operating instructions. The
manufacturer does not accept responsibility in case of improper
use of the device and particularly any use of equipment that may
cause personal injury or material damage.
The device contains no user-serviceable parts. All repairs must
be performed by factorytrained service personnel.
Check that the power cords, plugs and sockets are in proper
condition.
The device can be connected only to 230V AC (50 or 60 Hz)
sockets (if 16A CEE, 16A Schuko, 32 A Version).
The device can be connected only to three phase current AC (50
or 60 Hz) sockets (if 3 x 16 A Version).
Always plug the device into properly earthed power sockets.
The device is intended for indoor use only. Do NOT install them
in an area where excessive moisture or heat is present.
Because of safety and approval issues it is not allowed to modify
the device without our permission.
Please note the safety advises and manuals of connected de-
vices, too.
The device is NOT a toy. It has to be used or stored out or range
of children.
Packaging material is NOT a toy. Plastics has to be stored out of
range of children. Please recycle the packaging materials.
In case of further questions, about installation, operation or usa-
ge of the device, which are not clear after reading the manual,
please do not hesitate to ask our support team.
Security Advise

Expert Power Control NET 24x
2
3Expert Power Control NET 24x
2.2 Installation
1.) Connect the power supply cable (A) with the power socket.
EPC NET 24x now is booting and shortly after ready for usage.
2.) Plug the Ethernet cable into the connector (C) on the front
side of EPC NET 24x and connect it to your Ethernet.
3.) Connect the clients to the active outlets at the EPC NET 24x
(F).
With Expert Power Control NET 24x (EPC NET 24x) electrical
devices can be switched via a TCP/IP network. There are only
two steps necessary for installation: The connection to an elec-
tric circuit and a TCP/IP network and the conguration of the IP
settings. Afterwards EPC NET 24x can be switched by all PCs
of the network.
1. Description
2.1 Extend of Delivery
Included in delivery are:
• Expert Power Control NET 24x
• CD-ROM including Software and Manual
• Short manual
2. Hardware
2.3 Status LED
The Status LED (B) shows different states of the device:
• Status LED red: Device is not connected to the ether-
net
• Status LED orange: Device is connected to the ether-
net, TCP/IP settings are not allocated
• Status LED green: Device is connected to the ethernet,
TCP/IP settings allocated, device is ready to use
• Status LED blinks alternately red and green: Device is
in Bootloader mode.

Expert Power Control NET 24x
4
5Expert Power Control NET 24x
A) Power Supply Cable ( 1 Plug CEE, 32 A, 1,80m (32A Version)
1 Plug CEE 3-phase, 16 A, 1,80m (3 x 16 A Version)
1 Plug CEE, 16 A, 1,80m (16A CEE Version)
1 Plug Schuko, 16A, 1,80m (16A Schuko Version) )
B) Status LED
C) Ethernet connector (RJ45)
D) Button „ok”
E) Button „select”
F) 24 Power Ports (IEC, max. 10 A)
G) 3 Fuse LEDs
H) 3 Fuses (16 A)
I) 24 Power Port LEDs
A
B
D, E
C
F
G
H
I
Figure 1 Frontside of EPC NET 24x

Expert Power Control NET 24x
4
5Expert Power Control NET 24x
3. Conguration
3.1 Automatic conguration by DHCP
After switch-on EPC NET 24x looks for a DHCP server and re-
quests an available IP address (for deactivation of that feature
see 2.2).
Please check the IP adress allocated to EPC NET 24x in the
DHCP server settings to make sure that the same address is
used at every reboot.
3.2 Network conguration by GBL_Conf.exe
For changing the network properties manually, the program
GBL_Conf.exe is required. This tool is available for free on our
website www.gude.info.
Furthermore GBL_Conf.exe enables you to install rmware
updates and to reset EPC NET 24x to its factory settings (see
5.2).
Activate bootloader mode of EPC NET 24x and run GBL_
Conf.exe (see 5.1). The program will look automatically for con-
nected devices and will display their network conguration.
If the displayed IP address accords with the factory settings
(192.168.0.2), there is either no DHCP server available in the
network or no free IP address could be allocated.
Enter a free IP address and the according netmask in the entry
mask, then save these changes by clicking on Program Device
gSaveCong.
Restart EPC NET 24x
by switching it off and on
again, so that the chang-
es will take effect. Now
click on Search in order
to have the new network
conguration displayed.
Figure 2 GBL_Conf.exe

Expert Power Control NET 24x
6
7Expert Power Control NET 24x
3.3 Conguration by Webinterface
Go to the website of EPC NET 24x. Enter the IP address of EPC
NET 24x into the address line of your internet browser:
http://IP address of EPC NET 24x/
and press LOGIN.
Figure 3 Login
To enter the conguration menu, click on „Conguration“ on the
upper left side of the screen.
Conguration - Power Ports
Label
A name with a maximum
of 15 characters can be
entered here for each
Power Port.
After power-up switch
The Power Port’s switch-
ing state after a power-on
of EPC NET 24x can be
dened here (on, off, re-
member last state).
If switching on after power-up, wait ...
A switching delay of a Power Port can be dened here that is
applied after switch on of EPC NET 24x. The delay can last up
to 8191 seconds.
Figure 4 Cong - Power Ports

Expert Power Control NET 24x
6
7Expert Power Control NET 24x
Conguration - IP Address
Hostname
Enter the host name
of EPC NET 24x. EPC
NET 24x uses this name
to connect with DHCP
server.
Special signs may
destabilize your net-
work.
IP Address
Here you can change the IP address of EPC NET 24x.
Netmask
Here you can change the netmask of EPC NET 24x.
Gateway
Here you can change the standard gateway of EPC NET 24x.
Use DHCP
Here you can set, if EPC NET 24x shall get its TCP/IP settings
directly from your DHCP server. If DHCP is activated, EPC NET
24x proves if a DHCP server is active inside of your LAN. Then
EPC NET 24x requests TCP/IP settings from this server. If there
is no DHCP server inside of your network, we recommend to de-
activate this function.
Figure 5 Cong - IP Address

Expert Power Control NET 24x
8
9Expert Power Control NET 24x
Conguration IP ACL
Reply ICMP-Ping requests
Here you can set, if EPC NET 24x shell react on pings.
Enable IP Filter
Here you can activate the IP Access Control List (IP ACL) of
EPC NET 24x.
If IP ACL is active, DHCP and SNMP only work, if all neces-
sary servers and clients are registered in this List.
Figure 6 Cong - IP ACL
Table of contents
Other Gude Switch manuals

Gude
Gude Expert Power Control 8032-1 User manual

Gude
Gude Expert net control 2i2o User manual

Gude
Gude Expert USB User manual

Gude
Gude Expert Power Control 1000 User manual

Gude
Gude Expert Power Control NET 8x 8211 User manual

Gude
Gude 8801 User manual

Gude
Gude Expert Bypass Switch 8701 Series User manual

Gude
Gude Expert Power Control 8221 Series User manual

Gude
Gude Expert Power Control 8021 Series User manual

















