
EMX Alpha / Beta / Delta / Gamma / Omega Ranges
WARNING READ INSTRUCTIONS CAREFULLY BEFORE USE
INFLATABLE INSTRUCTIONS
Recommended procedure below. For safety reasons it is recommended that 2 persons set up any Inatable Tent.
Ensure area is free from any sharp objects & overhead objects.
SETUP - INFLATION
Remove Inatable Tent from
Protective Cover.
Lay the Inatable Tent out at.Roll out the Inatable Tent.
ONE TWO THREE
Each leg on the Inatable Tent has a valve.
Select valve to attach pump, screw inatation
value closed and leave cap o.
On all other valves screw tight and x cap.
Inatable Tent Accessories*
Layout your Walls and Awnings and
conrm positioning.
Attach the accessories using zips.
SIXFOUR FIVE
During the ination process raise legs
into the center until all legs are upright.
Ensure all legs are lined up and canopy
is centered. Check frame is rm.
Connect the pump to selected Ination
Valve and begin ination.
SEVEN EIGHT NINE
Fix Stakes and Guide Ropes or attach
Sandbags.
Over pressure relief valve system
DO NOT TOUCH.
IMPORTANT NOTES:
Check the wind and weather
conditions before commencing
construction.
Ensure you have the correct ground
xings for your application.
When the tent is in use, do not leave
your tent unattended.
TEN
We Design |We Manufacture |We Sell |We Deliver America Wide