ensto Wallbox User manual

EN
Ensto Wallbox
Installation Instructions
User Guide
RAK111B_EN
2023-09-14
© 2023 Ensto Building Systems

RAK111B_EN / 2023-09-14
2 / 32
Contents
Installation Instructions
1. Safety instructions.......................................................................................................................................................... 3
2. Description of symbols................................................................................................................................................. 3
3. Abbreviations................................................................................................................................................................... 4
4. Delivery contents............................................................................................................................................................ 4
5. Accessories........................................................................................................................................................................ 5
6. Mounting instructions.................................................................................................................................................. 8
6.1. Before installation............................................................................................................................................ 8
6.2. Wall mounting with wall bracket................................................................................................................ 9
6.3. Ground mounting on concrete casting with ground mounting pole.........................................10
6.4. Ground mounting on concrete foundation with ground mounting pole.................................11
6.5. Ground mounting on Unimi concrete foundation.............................................................................12
6.6. Attaching charging station to mounting pole EVTL43.00..............................................................14
7. Electrical connections................................................................................................................................................. 15
7.1. Wiring instructions........................................................................................................................................ 15
7.2. Power supply................................................................................................................................................... 16
8. Commissioning..............................................................................................................................................................18
8.1. View of the component layout on the control unit............................................................................18
8.2. Connecting to the charging station........................................................................................................ 19
8.3. Ethernet connections................................................................................................................................... 20
8.4. WiFi coverage area.........................................................................................................................................20
9. Technical data................................................................................................................................................................ 21
10. Code key........................................................................................................................................................................ 23
11. Dimensional drawing............................................................................................................................................... 24
12. Installation / Commissioning checklist.............................................................................................................. 26
13. Maintenance / Preventive maintenance instructions................................................................................... 27
14. Testing instructions for the electric protective device................................................................................. 28
15. Troubleshooting......................................................................................................................................................... 28
16. Warranty........................................................................................................................................................................ 29
17. Declaration of Conformity...................................................................................................................................... 29
18. Disposal......................................................................................................................................................................... 29
User Guide
19. User interfaces.............................................................................................................................................................30
20. Charging........................................................................................................................................................................30
20.1. Free charging.................................................................................................................................................30
20.2. Charging with RFID..................................................................................................................................... 31

RAK111B_EN / 2023-09-14 3 / 32
Installation Instructions
1. Safety instructions
Electrically skilled person
• The installation must only be done by a qualied professional.
• Read these instructions carefully before you install, operate or maintenance the charging station.
• Obey the instructions in this manual and make sure that the installation complies with national
safety regulations, installation methods and restrictions.
• The information provided in this manual in no way exempts the installer or user from responsibil-
ity to obey all applicable safety regulations.
• Keep this manual for future installation and maintenance.
WARNING
Danger of electric shock! Risk of re!
• Improper installation can cause personal injury and property damage.
• Do not switch on the power supply before the installation work is completed.
2. Description of symbols
WARNING - Indicates a hazard with a medium level of risk which, if not avoided, could
result in death or serious injury or considerable damage to the equipment.
Electrically skilled person
Identier for plug and socket outlet
AC / EN62196-2 / Type 2
Radio-frequency identication reading area for automatical identifying of RFID tags.
Environmental instructions

RAK111B_EN / 2023-09-14
4 / 32
4. Delivery contents
• Charging station
• Label set with RCBO testing instructions (EVB100B-B4BC)
• Triangular key
• Installation Instructions / User Guide in English,
other languages please see https://evwiki.ensto.technology/
Plastic front cover
3-color LED indicates the
charging point’s status
1-2 x Mode 3/ Type 2
socket outlet
Painted steel frame
RFID reader
Front cover lock
Abbrevia-
tion Description
LED Light Emitting Diode
MCB Miniature Circuit Breaker, protects cables from over load and short circuits
OCPP Open Charge Point Protocol, protocol how the charger communicates with the backend
systems
RCBO Residual current Circuit Breaker with Overcurrent protection
RCD Residual Current Device, protects humans and animals from electric shock
RDC-DD Residual direct current detecting device
RFID Radio Frequency Identication, information remote reading/writing system, here used to
identify authorized charging point users
USB Universal Serial Bus, specications for cables, connectors and protocols
RS-485 Recommended Standard 485, standard dening the characteristics of drivers and receiv-
ers for use in serial communications systems
3. Abbreviations
Type label
Energy meter
(EVB100B...)

RAK111B_EN / 2023-09-14 5 / 32
5. Accessories
Flange KOT21715
Included in the delivery.
Note! Cable glands are not included in the delivery.
Please order suitable cable glands separately according to the used supply cable sizes, for example Ensto
KTM... cable gland series (polyamide or brass).
1-2 x Mode 3/ Type 2
socket outlet
EVTL40.00
Wall bracket
The wall bracket is pre-installed to the charging station.
0.7
216
8
86
+0.1
-0.1
300
2x Ø6
436
240
4x Ø7
320
Ø12.5 (knock-out)
Ø20.5 2pcs (knock-outs)
Ø32.5 2pcs (knock-outs)
All
knock-outs

RAK111B_EN / 2023-09-14
6 / 32
EVTL43.00
Ground / Floor mounting pole
The delivery includes ange F2202.
Flange 2202
200
250
150
4 x Ø14
100
1029,5
(4 x Ø9,5)

RAK111B_EN / 2023-09-14 7 / 32
EVTL44.00
Adapter for ground mounting
Ø60,3
100
150
408 ± 1
Ø54,5
8
4 x M12
200
250

RAK111B_EN / 2023-09-14
8 / 32
6. Mounting instructions
6.1. Before installation
Remove the the charging station from its package. Do not scratch the surface of the the charging station
after removal from the package.
When selecting installation site, take into consideration the following:
• The minimum space necessary for operating and maintenance.
• Make sure that the mounting foundation is applicable and robust.
• To ensure the optimal charging performance, the the charging station should not be exposed to
direct sunlight.
• If the charging station is installed in corrosive conditions where there is a risk of metal rusting, visible
metal surfaces must be protected regularly with anti-corrosion agent.
Obey national regulations and site
requirements
Recommendation
900 - 1200 mm
min. 400 mm
min. 200 mm

RAK111B_EN / 2023-09-14 9 / 32
Installation steps
1. Remove the pre-installed wall bracket from the charging
station [1]. Loosen the 2 fastening screws from the top of
the charging station and 2 fastening screws from the bot-
tom.
2. Drill screw holes for the wall bracket [2].
3. Attach the wall bracket to the wall. Select applicable
screws for the wall.
4. Attach the charging station to the wall bracket with the 4
fastening screws you removed in the step 1.
5. See wiring instructions on page 15.
6.2. Wall mounting with wall bracket
Installation accessories Wall bracket EVTL40.00 1 pcs
Screws 4 pcs
1200 320
1520
240
2
1
The socket outlet will be at
a height of 1200 mm

RAK111B_EN / 2023-09-14
10 / 32
6.3. Ground mounting on concrete casting with ground mounting pole
Installation accessories Ground mounting pole EVTL43.00 1 pcs
Anchor bolts M12 4 pcs
Bolts and nuts (not included)
Make sure that the materials used for the concrete casting and the installation procedures follow local
building regulations and safety standards.
• Dig a trench for cable conduits and an excavation pit for the concrete foundation. The pit oor
should be compacted and level.
• Put cable and possible drain pipes in place.
• Fill the pit with concrete.
• Let the concrete cure. Make sure that the surface stays level during the process.
Installation steps
1. Make sure that the concrete surface is compacted
and level.
2. Drill a hole in the concrete for the anchor bolts. For
more information, please see the anchor bolt instruc-
tions.
3. Put the anchor bolts in place.
4. Pull the electric cables approx. 1500 mm measured from
the concrete surface.
5. Attach the ground mounting pole to the anchor bolts
with washers and nuts.
6. Pull the electrical cables through the ground mounting
pole.
7. Attach the charging station to the mounting pole. See
instructions on page 14.
200
100
Other manuals for Wallbox
1
Table of contents
Other ensto Batteries Charger manuals

ensto
ensto EVF100 User manual

ensto
ensto Pro EVF100 User manual

ensto
ensto One Apartment EVH161-ACRM0 User manual

ensto
ensto EVB203E Series User manual

ensto
ensto eFiller User manual

ensto
ensto EVB100 User manual

ensto
ensto Pro EVF200 Wiring diagram

ensto
ensto EVB200EB-B4BC User manual

ensto
ensto One Home EVH161B-HC000 User manual

ensto
ensto One User manual




















