Tools/additional
items required
S. NO ITEM NAME QUANTITY SOURCE
1 Conduit up to 32 mm (1-1/4 in) for side entry and up to 3/4 in (19 mm) for rear entry As required Provided by Installer
2 Conduit ttings and tools must be IP55 rated when installing outdoors As required Provided by Installer
3 Raceway adapter – must be IP55 rated when installing outdoors As required Enphase store/
provided by Installer
4 Drill 1 Provided by Installer
5 4 mm pilot bit 1 Provided by Installer
6 Screwdriver 1 Provided by Installer
7 Wrench 1 Provided by Installer
8 Socket wrench 1 Provided by Installer
9 Torque wrench 1 Provided by Installer
10 Level 1 Provided by Installer
11 Conductor stripper 1 Provided by Installer
12 Stud nder (if required) 1 Provided by Installer
13 Copper conductors - 6 mm2to 30 mm2(11 mm or 7/16 in
strip length) (rated at 90°C) for terminals As required Provided by Installer
14 Control cable As required Provided by Installer
15 Personal protective equipment for handling lithium batteries
as required by local safety standards As required Provided by Installer
16 Protective gloves for protection against sharp edges As required Provided by Installer
17
M8 lag bolts or screws to mount the bracket on wall. Slots are 9.2 mm
(0.36 in) for wall mount and 11.2 mm (inclined slots) for pedestal. Check
with a structural engineer and local standards for requirements
Single stud
mounting
(Min. 3)
Dual stud
mounting
(Min. 4)
Provided by Installer
18 M6 screws to fasten top shield on wall
Single stud
mounting
(Min. 2)
Dual stud
mounting
(Min. 5)
Provided by Installer
19 Washers As required Provided by Installer
20 IQBattery5P lifting handles. Includes one left side and one
right side lifting handle (IQBATTERY-HNDL-5) 1Enphase store/
provided by Installer
5
IQ Battery 5P Quick Install Guide