
Manufacturer: PPHU
EKOLOT
Type: KR-030TOPAZ
Handling, Maintenanceand PeriodicInspections
Manual
Issue: 1
Rev. No: Date:July2010
Date: Page
6
5. PERIODICALINSPECTIONSCHEDULE
The following scheduleshowsinspectionsthatmustbe carriedoutafterspecifiedperiods
of timeorafterincidentsmentioned:
Afterfirst 2hoursof flight 1, 2, 3, 4, 5, 6,7, 8,12
Afterfirst 5hoursof flight 1, 2, 3, 4, 5, 6,7, 8,12
After100 hoursof flight orannually 1, 2, 3, 4, 5, 6,7, 8,9, 10,11, 12,13
Afterhardlanding 1, 2, 3, 5, 6
Safeand correctoperation oftheplane maybe assuredbysystematicmaintenanceand
inspectionsof the airframeand powerplant. The activitiesmustbe performed afterperiods
specifiedinFlightandMaintenanceManualofthe Plane,and powerplantand propeller
manuals.
6.LIFECYCLEOFASSEMBLIES
Item Assembly Lifecycle
1 Airframe
-compositestructure
-metalcomponentsof the
structure
-controlsystemcomponents
Depending on technicalcondition
2 EngineROTAX912 UL Accordingtoupdated technicalbull
issuedbythemanufacturer.
3 PropellerAS 1700/1950 Depending on technicalcondition;see
manualfortheAS typepropellers
4 Cockpit instruments(pneumatic
andelectric) Depending on technicalcondition
5 Radioandother electronic
equipment Accordingtotheupdatedmanualsand
instructionsof respective
manufacturers.
6 Rubber pipesfor fueland oil
Depending on technicalcondition but
no longer than6yearscounted from
the yearof production
7 Rubber shockabsorbersofthe
frontwheel
8 Tiresand inner tubes
9 Rubber dampersinthe engine
frame