
Contents
1EN.09.09052022 2EN.09.09052022
Introduction 3
Symbols of the manual 3
1. General Information of the Product 4
1.1 Product Introduction 4
1.2 Technical Specications 5
1.3 Copyright 6
1.4 Standards 6
1.5 Warranty Guidelines 6
1.6 Declaration of Incorporation 7
1.7 Certication 8
1.8 Signage 9
2. Contents of Delivery 10
3. Assembly and Installation 14
3.1 Precautionary Measures 14
3.2 Required Tools 15
3.3. Technical drawings 16
3.3.1 Two-leaves door version(TBS) 16
3.3.2 One-leaf door version(TBS) 17
3.4 Part´s Position 17
3.5. Installation Steps 20
3.5.1 Check leaves & opening dimensions 20
3.5.2 Mark the right position 21
3.5.3 Fix the rail to the lintel 21
3.5.4 Possible screw grooves 22
3.5.5 Mount the stoppers at the end points 22
3.5.6 Mount the TL hanger right 23
3.5.7 Mount the TL hanger left 24
3.5.8 Install the side leaves/leaf 24
3.5.9 Mount the inner leaves/leaf 26
3.5.10 Align the inner leaf with the short hanger(s) 26
3.5.11 Align the inner leaf with the long hanger(s) 27
3.5.12 Position of hangers after adjustment 27
3.5.13 Slide both inner leaves/leaf to be able to install the oor guide(s) 28
3.5.14 Install inner oor guide 28
3.5.15 lift and slide the inner leaves/leaf to the oor guide(s) 29
3.5.16 Align the inner leaves/leaf with the xed leaves/leaf and accordingly adjust the stopper 30
3.5.17 Mount the xed TL timing belt base plate 30
3.5.18 Align inner leaves/leaf with xed TL timing belt base plate 31
3.5.19 Tensioning timing belt by side screw 32
3.5.20 Mount TL timing belts 32
3.5.21 Clamp TL timing belt(s) 33
3.5.22 Check for equal distances 34
3.5.23 Mount the SLH rail 35
3.5.24 Mount the SLH stoppers 35
3.5.25 Mount SLH hangers 36
3.5.26 Mount the outer leaves/leaf 37
3.5.27 Install outer oor guide 37
3.5.28 Lift and slide the outer leaves/leaf 38
3.5.29 Connect the inner leaves/leaf with outer leaves/leaf 39
3.5.30 Connect TL rail to SLH rail with joiners 39
3.5.31 Passing at nuts for xing operator components 40
3.5.32 Components installation as illustrated 40
3.5.33 Timing belt installation over pulleys and xing on belt clamps (2) 41
3.5.34 Operator Cover 42
3.5.35 Side Covers 42
3.6 Starting the Operator 43
3.6.1 Standard Version 43
3.6.2 Escape Version 43
3.7 Modifying the Parameters 53
3.8 Sensors Setup Table 54
3.9 Wiring Diagrams 55
3.9.1 Wiring Diagram Optex OA-Flex Sensor 55
3.9.2 Wiring Diagram BEA ZEN/ZENSAFE Sensor 56
3.9.3Wiring Diagram BEA ZEN/ZENSAFE Sensor 57
3.9.4 Wiring Diagram BEA IXIO-DT3 Sensor 58
3.9.5 Wiring Diagram BEA VIO Sensor 59
3.10 Block Diagram 60
3.11 Mechanical Key Switch 61
4. Maintenance Service 62
4.1 Precautionary Measures 62
4.2 Maintenance Check 62
4.3 Timing Belt Tension 64
4.3 Mechanical Faults 64
4.5 Troubleshooting 65
4.5.2 LED Status – Error Codes 67
5. User Instructions 69
5.1 Precautionary measures 69
5.2 Main Elements of the system 70
5.3 Digital key switch 73
5.3.1 Operating the system with the digital key switch 73
5.3.2 Main menu 74
5.4 System behavior 75
5.4.1 Closing cycle 75
5.5 Failures 76
5.6 Error handling 77
5.6.1 Handling errors by mechanical key switch 77
5.6.2 Handling errors by digital key switch 77
5.7 Mandatory Routine Maintenance 77
5.8 Cleaning 78
6. Disabling and Dismantling 79