Daishiba DSP? 85HA User manual

Air Source Swimming pool Heat Pump
‐Installation and Operation Manual ‐
DSP‐85HA DSP‐100HA DSP‐120HA

- 1 -
Content
Safety Precautions ………………………………….……….…………………………………… 2
Technical data.............................................................................................3
Unit dimension…………………………………………………………...............................4
Installation………………………………………………………………................................5
Sound pressure level…………………………………………….………………………..…..….8
Electric connection………………………………………………………………………..……….9
Controller instruction ………………………………..………………………………………….11
Maintenance & Troubleshooting………………………….……………………………..…15

- 2 -
Safety Precautions
General
Make sure that the fixed ground wire in the building is securely connected to earth.
Wiring tasks should be carried out by qualified electricians only, in addition, they should
check the safety conditions of power utilization, for example, check if the cable capacity is
adequate, and check if the power cable is damaged.
Home users must not install, repair or relocate the unit.
Improper treatment might lead to the accidents e.g. personal injury caused by fire, electrical
shock or unit's falling‐off, and water leakage in the machine. Please contact professionals for
repair.
The unit shall not be installed at a spot with potential hazard of leakage of inflammable gas.
In case the leaked gas is congregated around the machine, there might be the risk of explosion.
Make sure that the foundation of installation is stable.
If the foundation is unstable, the outdoor unit may drop and cause a casualty.
Make sure that the electric leakage protection switch is fixed.
If no electric leakage protection switch is fixed at the beginning of the electric supply, it maybe
cause electric shocks or fires.
If any abnormity occurs in the unit (such as burned smell inside the unit), cut off the power
supply immediately, and contact professionals for repair.
Please follow the instruction below when cleaning the unit.
a. Before cleaning, cut off the electric supply of the unit firstly to avoid injuries caused by fan in
operation.
b. Do not rinse the unit by water because the rinsed unit may cause electric shock.
Make sure to cut off the electric supply before maintaining the unit.
Please do not insert fingers or sticks into air outlet or air inlet.
Note!
It is required to read the Safety precautions in details before
operation. The precautions listed below are all-important for
safety. Please follow the instructions strictly.

- 3 -
Transport and storage
The machine must be transported and stored vertically.
Technical data
Model DSP‐85HA DSP‐100HA DSP‐120HA
Heating Capacity(kW)8.5 10 12
COP 5.02 4.95 4.92
Cooling Capacity(kW)6.2 8.3 9
EER 3.59 3.59 3.6
Rated Input(kW)1.69 2.02 2.44
Rated Current(A)7.7 9.2 11.1
Max Current(A)12.4 14.5 18.7
Power Supply(V/Ph/Hz) 220‐240/1/50
Setting Temp. Range 15℃~45℃
Running Temp. Range ‐5℃~43℃
Unit Dimension (W×H×D,mm) 615×1060×370
Net Weight(KG)55 62 70
Noise dB(A) 52 54 54
Water Inlet/Outlet Dimension 50.8(2″)
Water Heat Exchanger Titanium
Min. Water Flow(L/MIN)60 72 80
Refrigerant R410A
Display LCD
Mode Heating/Cooling/AUTO
NOTES:Capacities and power inputs based on the following conditions:
- Heating: Outlet water temperature 27℃.Ambient air temperature 20℃(DB)/19℃(WB)
- Cooling: Outlet water temperature 27℃.Ambient air temperature 35℃(DB)/27℃(WB)
Note: The above data might change as the product improves; please refer to the details on the
product nameplate.

- 4 -
Unit dimensions
Model A(mm) B(mm) C(mm) D(mm) E(mm)
DSP‐85 HA
DSP‐100 HA
DSP‐120HA
650 1140 415 435 684

- 5 -
Installation
Select installation position
1. If the unit is to be installed on the floor, its undercarriage should be heightened, to avoid
ingression of accumulated water in rainy season. In snowy areas, it is important to prevent
accumulated snow from blocking up the air‐out. The recommended height is 20cm to 30cm.
2. Drain ditch or other facilities should be arranged under the outdoor unit, to avoid the
environment influence because of water discharge.
3. To install the unit at balcony or top of building, the installation site must meet the allowable
bearing capacity of building structure, without affecting the structural safety.
4. Ensure the unit is well ventilated, direction of air exhaust is kept away from windows of
neighboring buildings, and the exhaust air cannot flow back. Moreover, adequate service
clearance should be kept around the unit.
5. The unit should not be installed at places accompanied with oil, inflammable gas, corrosive
components e.g. sulfur compound, or high‐frequency equipment.
6. The unit must be installed on reliable base or framework. Weight capacity of framework
should be 3 times of the body weight, and safeguard measures should be taken to avoid
malfunction of fastenings.
7. The unit should not be installed at sites with typhoon/ earthquake hazards. Midair installation
should be avoided as much as possible as machine falling down may result in severe accident.
Note!
Installation must be carried out by professional

- 6 -
Installation in exceptional circumstances (unit: mm)
No obstacle in front of the unit Obstacle above the unit
Obstacle in front of the unit Severalunitsinarow

- 7 -
Installation diagram
Installation diagram for combination

- 8 -
Sound pressure level
Air to water heat pump is usually placed next to a house wall, which gives a directed sound
distribution that should be considered. Accordingly, you should always attempt to find a place
on the side that faces the least sound sensitive neighbor area. The sound pressure levels are
further affected by walls, bricks, differences in ground level, etc and should therefore only be
seen as guide values.
Sound pressure level
Model DSP‐85HA DSP‐100HA DSP‐120HA
Sound pressure level at 1m dB(A) 52 54 54
Sound pressure level at 4m dB(A) 40 42 42
Sound pressure level at 10m dB(A) 32 33 33

- 9 -
Electric connection
A heat pump must not be connected without the permission of the electricity supplier and must
be connected under the supervision of a qualified electrician.
Wires, spare parts and materials etc. must satisfy the relevant standards issued by the host
country or region.
The heat pump does not include an isolator switch on the incoming electrical supply. The power
supply cable must be connected to a circuit‐breaker with at least a 3 mm breaking gap.
Incoming supply must be 220V 1‐phase, neutral ground, via a distribution board with fuses.
If an insulation test is to be carried out in the building, please make sure to disconnect the heat
pump.
To avoid the possibility of false action caused by electromagnetic coupling, the communication
wire must be STP (Shielded Twisted Pair).The size of communication wire should not less than
0.5mm2.
Note!
Electrical installation and service must be carried out
under the supervision of a qualified electrician. Electrical
installation and wiring must be carried out in accordance
with the stipulations in force.
This manual suits for next models
3
Table of contents
Popular Swimming Pool Pump manuals by other brands

Resol
Resol DeltaSol B Pro Mounting and operation manual

Evolution Aqua
Evolution Aqua UniTech Perfect 5000 operating instructions

Outside Living Industries
Outside Living Industries Ubbink Heatermax Pool Note of assembly

CPI
CPI Olympic 2P1815 owner's manual

Flotec
Flotec FP6121-01 owner's manual

Pentair
Pentair ONGA LEISURETIME LTP400 owner's manual











