Allume SolShare User manual

1
SolShare
Installation Manual


3
Australia - AE-PN-101-V3.0
This manual is intended for installations in Australia.
It is subject to change. Please check our website at
www.allumeenergy.com.au for the most up-to-date manual version.
AE-PN-101-V3.0
© Copyright – Allume Energy - All rights reserved.
This manual accompanies our equipment for use by the end users.
The technical instructions and illustrations contained in this manual are to be treated as condential and no part may be reproduced without the prior
written permission of Allume Energy and end users may not divulge the information contained herein or use this manual for purposes other than those
strictly connected with correct use of the equipment.
All information and specications are subject to change without notice.

4
Summary
Commissioning Document
I/ What’s in the box
II/ Mounting the SolShare
A. Installation site selection
B. Installation
III/ Electrical connection
A. Input / Output connections
B. Output connection to main switchboard
C. Running current transformer tails
D. Current transformers to SolShare connections
E. Current transformer clipping
F. Launch the SolShare
p05
p06
p08
p08
p09
p10
p10
p12
p13
p13
p14
p14

5
Hello
Thank you for purchasing a SolShare system.
You are supporting the growth of cutting edge Australian
made solar technology. Due to the novelty of this product,
this installation will likely be dierent from any other piece
of solar technology you have installed in the past. As a
result, please follow the guidelines in this manual carefully.
Your system is designed to meet all Australian conditions,
regulations and codes. This guide provides the general
instruction of the installation procedure of the SolShare.
If you have questions or feedback on the product or this
manual, feel free to reach out to Allume on +61 3 7038 0686
and ask for a technical representative. Otherwise, you can
email support@allumeenergy.com.au with any queries.

6
Commissioning Notes
To be completed during installation and entered to commissioning app
Serial Number:
Installer name: Company:
SolShare Connection
Unit Connected (eg: Apt 1, Unit B, Common light & power, No connection)
Single-Phase Three-Phase
R1
W1
B1
R2
W2
B2
R3
W3
B3
R4
W4
B4
R5
W5
B5
Unit Connection Identier
OR
OR
OR
OR
OR
Installation Address:
State: Postcode: Country:

7
IMPORTANT SAFETY INSTRUCTIONS
WARNING: Opening of the SolShare must only be performed by certied electrician.
WARNING: This equipment is connected to multiple sources of supply. Isolate all supplies before working on this equipment.
Each input circuit and each output circuit represent a source of supply.
WARNING: The specied shutdown procedure must be followed prior to working on this equipment.
WARNING: This equipment must be permanently earthed.
WARNING: This product relies on passive cooling, install in a well-ventilated location in accordance with the mounting instructions.
CAUTION: HEAVY OBJECT – This product has a weight of approximately 38kg. It’s un-boxing and mounting requires 2 people.
CAUTION: Residual Current Devices and Earth Leakage Breakers must not be used as Overcurrent Protection devices in Solshare
Output circuits.
CAUTION: Solshare will impose a current dependent voltage drop/rise which should be taken into account during design of the
installation. Specications are given in the Technical Data sheet.
CAUTION: The unit must be operated according to the technical specication datasheet provided with the unit.
CAUTION: Installations may vary depending on the existing electrical infrastructure and local electrical safety standard. It is the
responsibility of the electrician to ensure their installation meets the local electrical safety standard.
NOTE: Use only copper conductors rated for a minimum of 90 degrees Celsius.
NOTE: The symbol appears at grounding points within the SolShare equipment. This symbol is also used in the manual.
Handling and Safety Instructions
SAFETY SYMBOLS INFORMATION
The following safety symbols are used in this document. Familiarise yourself with the symbols and their meaning before
installing or operating the system:
Important:
xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx
Important:
xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx
Warning:
xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx
This symbol denotes a critical safety instruction that must
be followed to ensure safety of installer and safe operation
of the SolShare once commissioned. This box is sometimes
denoted in green to provide further emphasis.
This symbol indicates an instruction which: will ensure
proper operation of the SolShare once commissioned or
will help with the installation efficiency. This same box is
sometimes denoted in green to provide further emphasis.
This guide is provided to help the installer understand
the standard SolShare installation procedure.
Installations may vary depending on the existing electrical
infrastructure and local electrical safety standard. It is the
responsibility of the electrician to ensure their installation
meets the local electrical safety standard.
During installation, testing and inspection, adherence to all
the handling and safety instructions is mandatory. Failure
to do so may result in injury or loss of life and damage
to the equipment.
Warning:
xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx
SAVE THESE INSTRUCTIONS. This manual contains important instructions for the SolShare 3P-35A that shall be
followed during installation and maintenance of the power division control system.

8
Check for Transport Damage
Make sure the SolShare is intact following transportation. If there are any signs of visible damage, please contact
your dealer immediately. Carefully check that all of the components have been supplied. If anything is missing,
contact your dealer.
I/ What’s in the box
Mounting bracket Fastener Locking
plate
SOLSHARE
Split current transformer
with 10m tails
CT connector block
AntennaSolShare unit Switchboard labels
x 1 x 15
x 4
x 2 x 3
Warning:
- Make sure to read over, fully understand and strictly follow the detailed instructions
of this installation manual and other related regulations before installing the equipment.
- Any violation could result in personal death or injury, or damage to the device.
- Installation is only to be conducted by a certied electrician.
- This guide is provided to help the installer understand the standard SolShare installation procedure.
Installations may vary depending on the existing electrical infrastructure and local electrical safety
standard. It is the responsibility of the electrician to ensure their installation meets the local
electrical safety standard.
- This product has a weight of approximately 38kg. Its un-boxing and mounting requires 2 people.
x 1 x 1

9
Installation overview
Electricity Meter Panel
Unit main switches
XXXXXX
M1
XXXXXX
M2
XXXXXX
M3
XXXXXX
M4
654321 7 8 9 10 11 12 13 14 15
XXXXXX
M5
XXXXXX
M6
XXXXXX
M7
XXXXXX
M8
XXXXXX
M9
XXXXXX
M10
XXXXXX
M11
XXXXXX
M12
XXXXXX
M13
XXXXXX
M14
XXXXXX
M15
SOLSHARE
3 phase
from
inverter
main switch
solar circuit breaker
minimum
150mm
A single SolShare unit can distribute the power generated
from a single solar system to up to 15 single-phase or 5 three-
phase units (or a combination of the two).
The SolShare takes a single three-phase input from a grid-
connected solar inverter(s) and connects to each participating
unit on the load side of their retail electricity meter at the unit
main switchboard.
A solar circuit breaker is required on each output (ideally
located within the unit main switchboard) between the
SolShare and each unit’s main switch. This allows for the
isolation of the SolShare and the solar supply of any of the
connected units.
A typical installation conguration is displayed below. The
conguration displayed below may dier from your installation
conguration. Please refer to your Project Single Line Diagram
(SLD) for the connection and switchgear conguration for your
specic project. Guidance on this is covered in Section B.
Explained
on p13
Explained
on p12

10
II/ Mounting the SolShare
A. Installation site selection
Do not mount the SolShare
on ammable wall material
Do not mount the SolShare
near ammable material or
gases
90˚
Mounted Vertically
90˚
Mounted Vertically
Environmental boundaries
90˚
Mounted Vertically
Max ambient
temperature:
50°C (+122°F )
Min ambient
temperature:
-10°C (-13°F)
Relative humidity:
0-90%
90˚
Mounted Vertically
90˚
Mounted Vertically
Mount vertically Install in an easy to observe
and operate location
90˚
Mounted Vertically
Do not mount the SolShare
in direct sunlight
≈1200 mm
To minimise cabling required, the SolShare should be
mounted as close to the main switchboard (tenancy
isolator board) as possible.
To allow for easy installation and maintenance ensure that
there is adequate space surrounding the SolShare and that
it is mounted at a convenient height. Please ensure the
following mounting requirements are also met when selecting
the location of the SolShare.
Requirement for
installation space
150 mm150 mm
500 mm500 mm
Other manuals for SolShare
3
Table of contents
Other Allume Inverter manuals




















