
ixBend-Tech Dragon A400 Assembly Manual
Contents
Contents
Limited Warranty .....................iv
Customer Service.................... v
Customer Satisfaction
Commitment............................. v
Warnings ..................................vi
Glossary ..................................viii
Contents...................................ix
01
Safety....................................... 11
1.1 Introduction ....................11
1.2 Assembly Safety. . . . . . . . . . . . . . . . .11
1.2.1 Safety Equipment .......... 12
02
Tools and Equipment ............. 13
2.1 Tools......................... 13
2.1.1 Tool List .................. 13
2.2 Crate Parts List ................ 14
2.3 Optional Parts ................. 14
03
Assembling the Dragon ......... 15
3.1 Shipping Crate ................. 15
3.1.1 Dragon A400 Shop Position. . . 15
3.2 Crate Disassembly.............. 15
3.3 Getting Started................. 16
3.3.1 Component Boxes .......... 16
3.3.2 Miscellaneous Box.......... 17
3.4 Unpacking the Crate ............ 18
3.5 Moving the Head into Position ..... 18
3.5.1 Place the Head using a Forklift 18
3.6 Installing the Beams............. 19
3.6.1 Install the First Beam........ 19
3.6.2 Slide Support Leg #4 into
Position....................... 20
3.6.3 Install the Second Beam ..... 20
3.6.4 Fasten the Support Legs to the
Beams. . . . . . . . . . . . . . . . . . . . . . . . 21
3.6.5 Slide the Racks into Position .. 21
3.7 Placing the Tail................. 22
3.7.1 Place and Install the Tail ..... 22
3.7.2 Secure the Tail Support Leg
to the Second Beam ............. 22
3.8 Securing the Rail Sections........ 22
3.9 Installing the Racks ............. 23
3.10 Installing the Cable Track Tray.... 23
3.11 Installing the Beak ............. 24
3.12.1 Installing the Beak ......... 24